PENGENDALIAN PROYEK SISTEM INFORMASI DENGAN METODE CPM (CRITICAL PATH METHOD)

Suryati Suryati (Indo Global Mandiri University)



Article Info

Publish Date
05 Feb 2018

Abstract

To control a project  we used CPM method which very use full to arrange a planning, scheduling and project control. Project is combined form many activity which link and it must followed by order before the entire work activity can be done successfully. To take on project controlling application is to find a critical dot to scheduling project. An arrow diagram is used to presenting an activity where the point ist to showed an a progress development way in project. The entire arrow diagram is giving a graphic representation aboat the relation between many project activity. In order way, circle diagram is used to presenting an even, where it doesn’t need time. On arrow hilt (where the activity begun) and on the end of arrow (where the activity end). The event  first number are smaller than tic number. This CPM method is able to give a clear view about process certain critical line to make certain to a time schedule.    Keyword : slack/float, crash, Jalur Kritis, dummy ,Slope.

Copyrights © 0000






Journal Info

Abbrev

IG

Publisher

Subject

Computer Science & IT

Description

Journal of global informatics publish articles on architectures from various perspectives, covering both literary and fieldwork studies. The journal, serving as a forum for the study of informatics, system information, computer system, informatics management, supports focused studies of particular ...