cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota semarang,
Jawa tengah
INDONESIA
MEDIA KOMUNIKASI TEKNIK SIPIL
Published by Universitas Diponegoro
ISSN : 08541809     EISSN : 25496778     DOI : -
Core Subject : Engineering,
Media Komunikasi Teknik Sipil (ISSN 0854-1809) published twice in a year, in July and December. The article can be product of researches, scientific thoughts or case study, in civil engineering and isn’t formed by politics, commercialism, and subjectivity unsure. This scientific journal contains articles of thought and research results in Civil Engineering that have never been published in scientific journals or other media.
Arjuna Subject : -
Articles 11 Documents
Search results for , issue "Volume 19, Nomor 2 (2013)" : 11 Documents clear
Reabilitas Daya Dukung Pondasi Tiang Bor Berdasarkan Formula Reese & Wright dan Usulan Load Resistance Factor Design dalam Perencanaan Pondasi Tiang Bor Studi Kasus Proyek Jakarta Lastiasih, Yudhi; Irsyam, Masyhur; Sidi, Indra Djati; Toha, FX
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 19, Nomor 2 (2013)
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (475.78 KB) | DOI: 10.14710/mkts.v19i2.8422

Abstract

Design bored pile foundation often use formulae of Reese and wright (1977) on projects heild in Jakarta. The safety factor often use on the design foundation on project in Jakarta are generally 2 or 3. By using advance First Order Liability Method to analysis design foundation, the result showed that the design was very conservative. Proven by the safety index for this design is 2.68 where’s the equivalent of failure probably 3.72 x 10-3, this result is less than requirement of failure probability 1 x 10-2. Lastiasih (2012) propose the use of multiple safety factors by applying Load Resistance Factor Design (LRFD) in accordance with the design of building age so as not to use single safety factor again. Further more the design of bored pile foundation become more efficient.

Page 2 of 2 | Total Record : 11


Filter by Year

2013 2013