cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota semarang,
Jawa tengah
INDONESIA
MEDIA KOMUNIKASI TEKNIK SIPIL
Published by Universitas Diponegoro
ISSN : 08541809     EISSN : 25496778     DOI : -
Core Subject : Engineering,
Media Komunikasi Teknik Sipil (ISSN 0854-1809) published twice in a year, in July and December. The article can be product of researches, scientific thoughts or case study, in civil engineering and isn’t formed by politics, commercialism, and subjectivity unsure. This scientific journal contains articles of thought and research results in Civil Engineering that have never been published in scientific journals or other media.
Arjuna Subject : -
Articles 13 Documents
Search results for , issue "Volume 26, Nomor 1, JULI 2020" : 13 Documents clear
Kajian dan Evaluasi Struktur Slab Prestressed Precast Modular Concrete Eratodi, I Gusti Lanang Bagus; Awaludin, Ali; Han, Ay Lie; Triwiyono, Andreas
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (5241.167 KB) | DOI: 10.14710/mkts.v26i1.27765

Abstract

Prestressed precast modular concrete slabs function rigid pavement, supporting vehicle loads above it on subgrade with relatively low bearing capacity. This slab measures 2000 x 850 x 150 mm3 of regular reinforced concrete (old production) or prestressed concrete (new production) quality K-500. After several times of use, damage occurs mainly at the end of the slab in the form of spalling. The objectives of the study and evaluation were: (1) observing damage; (2) material quality data; (3) numerical modeling by taking into account material properties, loading and soil conditions; and (4) providing slab design recommendations including materials and geometrics. The method of study and evaluation of slab damage was done by observing the damage, taking concrete core-case and testing it in the laboratory, and modeling the slab structure with various parameters (soil data, concrete quality and slab geometry). Field observations and analysis results show that concrete slab spalling occurs initially at the edge (850 mm wide) which in turn causes the effectiveness of the pre-tension force to be suboptimal and finally the concrete spalling volume increases. Apart from the frequency of collisions during installation and slab deformation when supporting vehicle loads. Concrete spalling problems also due to inappropriate concrete quality.
Pengaruh Perubahan Kondisi DAS terhadap Debit Sungai Studi Kasus DAS Waduk Jatigede Kodoatie, Robert Johannes
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1573.513 KB) | DOI: 10.14710/mkts.v26i1.28989

Abstract

Changes in land use in the upstream of Jatigede watershed cause discharge and sedimentation problems in the Jatigede Reservoir. The objective of this study is to analyse the affect of land use changes in the Jatigede Reservoir watershed to the inflow and sediment to the reservoir. SCS Curve Number method and HEC-HMS modeling system are used to discharge analysis. Flood discharges in the reach of Cimanuk River close to the reservoir using data of 2009 are Q2=1,751.5 m3/sec, Q5=2,280 m3/sec, Q25=3,064.5 m3/sec, Q50=3,589 m3/sec. Flood discharges in the reach of Cimanuk River close to the reservoir using data of 2018 are Q2=2,053.8 m3/sec, Q5= 2,616.7 m3/sec, Q25 = 3,439.2 m3/sec, Q50=3,984.9 m3/sec. Discharges increase in 10 years (based on 2009 data and 2018 data). For example discharge increment for Q25 is 375 m3/sec. The increment is due to the increment of CN number as the consequences of land use changes. In other words along with the time, flood discharge in the rainy season increases, however discharge in the drought season decreases.
Preferensi Perubahan Rute terhadap Informasi Kondisi Rute Mudik Hendrawan, Hendra
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (385.944 KB) | DOI: 10.14710/mkts.v26i1.25987

Abstract

Mudik is an annual community activity in Indonesia that is carried out simultaneously and in a short time. The government has made various physical or non-physical efforts to reduce the negative impacts arising from Mudik activity. One effort is by providing information related to the condition of Mudik routes. Study of preferences of travelers for changing Mudik routes after obtaining information is needed to anticipate these differences in decisions. The method used in the study is quantitative and qualitative descriptive analysis and uses non-parametric statistical analysis with McNemar and ChiSquare K free samples test to determine whether there are differences in decisions after providing information and differences in preferences for route changes based on factors. The study results show that the factors that cause the same route decisions for travelers who regularly Mudik with private vehicles are the fastest route, and there is no other route choice. The analysis shows that for both factors there is a preference of travelers to change the route by 68.5%, uncertainty by 15%, and not change the route by 16.5%. This study also shows there are differences in decisions after providing information, and there are no differences in route change preferences based on factors.
Penerapan Soft System Methodology pada Metode Penilaian Kerusakan Beton Secara Visual Wiyanto, Henny
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (755.713 KB) | DOI: 10.14710/mkts.v26i1.21371

Abstract

Concrete damage on buildings can be interpreted as the presence of a change in the physical state of concrete. Damage can be in the form of change on the concrete surface or loss of concrete quality. To be able to identify the concrete damage condition on a building, inspection and assessment is required. Visual assessment is a method that can be a good first step to identifying the concrete damage condition on a building structure. Visual assessment is limited to concrete surface that can be accessed with visual senses. The goal of the research is to develop the concrete damage assessment method on a building visually that can be accepted by construction industry users in Indonesia with the Soft System Methodology (SSM) approach. Application of the SSM approach in this research uses the Root Definition component, CATWOE analysis, Rich Picture, and Conceptual Model. Result that is obtained from research, is the development concept for a visual method of building damage assessment, based on the seven steps according to SSM. Research results are in the form of a method that can identify and assess concrete damage while determining the concrete damage level on a building visually. 
Identifikasi Risiko Lanjutan Terhadap Sumber dan Penyebab Material Waste Proyek Konstruksi Jalan Waty, Mega; Sulistio, Hendrik
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (720.347 KB) | DOI: 10.14710/mkts.v26i1.21817

Abstract

Early risk identification of the sources and causes of waste material for road construction projects has been carried out, and the research continues to carry out further risk identification which then becomes the final risk identification. Description and validity tests and reliability tests were carried out to obtain further risk identification. Each source variable and indicator of the cause of material waste in each material is differentfrom one another because each has a difference. The results of continued identification resulted in:   1) ready mix concrete has eight variables of waste material sources and 21 indicators of material waste causes, 2) lean concrete has seven variables of waste material sources and 18 indicators of material waste causes, 3) aggregate B has seven variables of waste material sources and 12 indicators of material waste causes,  4) landfill has eight variables of material waste sources and 26 indicators of material waste causes, 5) cement has seven variables of material waste sources and 31 indicators of material waste.
Pengaruh Substitusi Tanah Putih pada Mortar Geopolimer Berbahan Dasar Fly Ash dengan Aktifator Natrium Hidroksida Priastiwi, Yulita Arni; Hidayat, Arif; Daryanto, Dwi; Badru, Zidny Salamsyah
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (596.877 KB) | DOI: 10.14710/mkts.v26i1.24715

Abstract

The presence of white soil in a geopolymer mortar affects the physical and mechanical properties of the mortar itself, especially in compressive strength, density and modulus of elasticity produced. Geopolymer mortar composed of fly ash, sand, water, and NaOH which acts as an alkaline activator compared to mortar from the same material, but white soil from Kupang is added as a substitution of fly ash. Specimens are made in six variations. Geopolymer mortar composers using a ratio of 1 binder: 3 sand with w/b of 0.5. Binder composed of fly ash with white soil substitution of 0; 5; 10; 15; 20 and 30% by weight of fly ash. An activator NaOH 8M solution was added to the mixture. Both white soil and fly ash pass of sieve no. 200 with a moisture content of 0%. Mortar made measuring 5x5x5 cm. The mortar was treated by the oven of method at 60 oC for 24 hours until the mortar does not change in weight. The test results show geopolymer mortar with 15% substitution of white soil to fly ash has the highest compressive strength, density and modulus of elasticity among other variations. In all mortar variations, compressive strength at 14 days has reached 75% of strength at 28 days.
Analisis Pengisian Awal (Impounding) pada Bendungan Raknamo Dengan Model Tangki Krisnayanti, Denik S; Bolla, Margareth E; Bunganaen, Wilhelmus; Damayanti, Alvine C; Nait, Costandji; Amaral, Bilgardo E.D.N.R
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (782.897 KB) | DOI: 10.14710/mkts.v26i1.26757

Abstract

Pengisian awal (impounding) bendungan adalah langkah yang dilakukan setelah pekerjaan konstruksi bendungan selesai. Penelitian ini bertujuan untuk menentukan lama waktu dan besar volume inflow di Bendungan Raknamo pada tahun air kering, tahun air rendah, tahun air normal dan tahun air cukup dengan Model Tangki. Faktor yang berpengaruh terhadap waktu pengisian awal bendungan (impounding) ini yaitu volume inflow per tahun Waduk Raknamo diperoleh pada tahun air kering adalah sebesar 15,4898 juta m3, tahun air rendah sebesar 23,6960 juta m3, tahun air normal sebesar 32,8927 juta m3 dan pada tahun air cukup sebesar 44,0687 juta m3. Dalam perhitungan lama waktu pengisian digunakan volume inflow dari tahun air rendah. Akumulasi volume setiap bulannya dihitung sehingga lama waktu pengisian Waduk Raknamo dapat mencapai volume tampungan yang direncanakan yaitu sebesar 14,091 juta m3 dalam kurun waktu tiga setengah bulan (tiga bulan lima belas hari).
Analisis Kuat Tekan Beton Mutu Tinggi Pasca Bakar Menggunakan Serat Polypropylene Aulia, Teuku Budi; Muttaqin, Muttaqin; Afifuddin, Mochammad; Amalia, Zahra
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1043.615 KB) | DOI: 10.14710/mkts.v26i1.28262

Abstract

High-strength concrete is vulnerable to high temperatures due to its high density. The use of polypropylene fibers could prevent structure explosion by forming canals due to melted fibers during fire, thus release its thermal stress. This study aims to determine the effect of polypropylene fibers on compressive strength of high-strength concrete after combustion at 400ºC for five hours. High-strength concrete was made by w/c-ratio 0.3 with cement amount 550 kg/m3 and added with silica fume 8% and superplasticizer 4% by cement weight. The variations of polypropylene fibers were 0%, 0.2% and 0.4% of concrete volume. The compression test was carried out on standard cylinders Ø15/30 cm of combustion and without combustion specimens at 7 and 28 days. The results showed that compressive strength of high-strength concretes without using polypropylene fibers decreased in post-combustion compared with specimens without combustion, i.e., 0.81% at 7 days and 23.42% at 28 days. Conversely, the use of polypropylene fibers can increase post-combustion compressive strength with a maximum value resulted in adding 0.2% which are 25.52% and 10.44% at 7 and 28 days respectively. It can be concluded that the use of polypropylene fibers is effective to prevent reduction of high-strength concrete compressive strength that are burned at high temperatures.
Pengukuran Kinerja Supply Chain pada Konstruksi Gedung Bertingkat dengan Menggunakan Pendekatan Metode SCOR (Supply Chain Operations Reference) Fitrianto, Taufiq; Wibowo, Mochamad Agung; Hatmoko, Jati Utomo Dwi
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (970.749 KB) | DOI: 10.14710/mkts.v26i1.26064

Abstract

Construction industry has a vital role in Indonesia’s economic growth. Infrastructure projects have been the priorities in the past five years consistent with RPJMN (National Medium Term Development Plan). It’s evident in the percentage of contribution of the construction industry, i.e. 10.2%, to Gross Domestic Product (PDB) and 6.34 million employments (5.3% national labors). However, it isn’t followed by efficiency of the construction industry. Increased cost, implementation, delay, conflict and dispute are some problems which arise from fragmentation and causes the construction industry to be known as an inefficient industry. A possible approach to solve fragment problem is studying the supply chain of the construction industry. The present study aimed to measure supply chain performance of construction using SCOR (supply chain) method, the impact and mitigation. The result was that the handling performed in TSM Bali project resulted in 5.56% of indirect waste, 8.63% of direct waste, and 443,711 tonCO2 of carbon footprint
Penggunaan Metode AHP dan GIS Untuk Zonasi Daerah Rawan Banjir Rob di Wilayah Medan Utara Saputra, Novrizal Ardian; Tarigan, A. Perwira Mulia; Nusa, Ahmad Bima
MEDIA KOMUNIKASI TEKNIK SIPIL Volume 26, Nomor 1, JULI 2020
Publisher : Department of Civil Engineering, Diponegoro University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1297.711 KB) | DOI: 10.14710/mkts.v26i1.26211

Abstract

Tidal floods that occur in the North Medan area due to overflowing of sea water when the tide enters the land, both directly and through river floods. The land area affected by tidal floods is getting wider and wider, so there needs to be an analysis of the level of vulnerability of tidal flooding so that the handling and prevention efforts can be on target. Determination of zonation with the level of tidal flood hazard involves various criteria, for this reason the AHP and GIS integration method is used to make rational decisions from several criteria and draw them on a zoning map. The results obtained in the North Medan area showed that 30.91 ha (0.33%) had very high levels, 1,515.98 ha (16.09%) had high levels, 4,411.92 ha (46.83%) had moderate levels, 3,176.83 ha (33.72%) had low levels, 284.81 ha (3.02%) had very low levels of vulnerability to tidal flooding.

Page 1 of 2 | Total Record : 13


Filter by Year

2020 2020


Filter By Issues
All Issue Volume 31, Nomor 2, DESEMBER 2025 (IN PROGRESS) Volume 31, Nomor 1, JULI 2025 Volume 30, Nomor 2, DESEMBER 2024 Volume 30, Nomor 1, JULI 2024 Volume 29, Nomor 2, DESEMBER 2023 Volume 29, Nomor 1, JULI 2023 Volume 28, Nomor 2, DESEMBER 2022 Volume 28, Nomor 1, JULI 2022 Volume 27, Nomor 2, DESEMBER 2021 Volume 27, Nomor 1, JULI 2021 Volume 26, Nomor 2, DESEMBER 2020 Volume 26, Nomor 1, JULI 2020 Volume 25, Nomor 2, DESEMBER 2019 Volume 25, Nomor 1, JULI 2019 Volume 24, Nomor 2, DESEMBER 2018 Volume 24, Nomor 1, JULI 2018 Volume 23, Nomor 2, DESEMBER 2017 Volume 23, Nomor 1, JULI 2017 Volume 22, Nomor 2, DESEMBER 2016 Volume 22, Nomor 1, JULI 2016 Volume 21, Nomor 2, DESEMBER 2015 Volume 21, Nomor 1, JULI 2015 Volume 20, Nomor 2, DESEMBER 2014 Volume 20, Nomor 1, JULI 2014 Volume 19, Nomor 2, DESEMBER 2013 Volume 19, Nomor 1, JULI 2013 Tahun 18, Nomor 1, PEBRUARI 2010 Tahun 17, Nomor 3, OKTOBER 2009 Tahun 17, Nomor 2, JUNI 2009 Tahun 17, Nomor 1, PEBRUARI 2009 Tahun 16, Nomor 3, OKTOBER 2008 Tahun 16, Nomor 2, JUNI 2008 Tahun 16, Nomor 1, PEBRUARI 2008 Tahun 15, Nomor 3,OKTOBER 2007 Tahun 15, Nomor 2, JUNI 2007 Tahun 15, Nomor 1, PEBRUARI 2007 Volume 14, Nomor 3, Edisi XXXVI, OKTOBER 2006 Volume 14, Nomor 2, Edisi XXXV, JUNI 2006 Volume 14, Nomor 1, Edisi XXXIV, PEBRUARI 2006 Volume 13, Nomor 3, Edisi XXXIII, OKTOBER 2005 Volume 13, Nomor 2, Edisi XXXII, JUNI 2005 Volume 13, Nomor 1, Edisi XXXI, PEBRUARI 2005 Volume 12, Nomor 3, Edisi XXX, OKTOBER 2004 Volume 12, Nomor 2, Edisi XXIX, JULI 2004 Volume 12, Nomor 1, Edisi XXVIII PEBRUARI 2004 Volume 11, Nomor 1, Edisi XXV, PEBRUARI 2003 More Issue