cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota padang,
Sumatera barat
INDONESIA
Journals Mining Engineering : Bina Tambang
ISSN : -     EISSN : 23023333     DOI : -
Core Subject : Science,
Atas dukungan dari jurusan Teknik Pertambangan dengan Penanggung Jawab Dekan Fakultas Teknik UNP (Drs. Ganefri,MPd, P.hd) bekerjasama dengan Ketua Jurusan Teknik Pertambangan (Drs.Bambang Heriyadi,MT) dan seluruh Dosen Jurusan Teknik Pertambangan Fakultas Teknik Universitas Negeri Padang. Jurnal ini terbentuk dan didukung penuh untuk sarana kretifitas Dosen dan Mahasiswa Teknik Pertambangan.
Arjuna Subject : -
Articles 12 Documents
Search results for , issue "Vol 5, No 4 (2020): Journals Mining Engineering: Bina Tambang" : 12 Documents clear
Perencanaan Jalur Ventilasi dan Sistem Jaringan Ventilasi Udara Pada Tunnel Mainshaft Auxiliaryshaft Tambang Bawah Tanah PT. Allied Indo Coal Jaya Sawah Lunto Noval Satria; Bambang Heriyadi
Journals Mining Engineering : Bina Tambang Vol 5, No 4 (2020): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan FT UNP

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bt.v5i4.109272

Abstract

Abstract. There are two kinds of underground mining systems which are natural ventilation systems and mechanical ventilation systems. The air quantity at the front of J6 and J7 does not meet the permitted standards in the Minister of Energy and Mineral Resources RI No. 1827 K / 30 / MEM / 2018. The air quantity at the front of J6 is 1,136m3 / second the air needed is 7,233 m3 / second and the amount of air in front of J7 is 1,528 m3 / second while the amount needed is at 7,167 m3 / second. At Front Junction 6, the available air demand is 1,136 m3 / sec while the air required is 7,233m3 / sec. A blower of 8.3 Kw ≈ 10.5 Kw is needed, and at the front of Junction 7 the available air demand is 1,528 m3 / s, the air needed is 7,167 m3 / s for the air demand when mining activities are needed, the blower power is 8.9 Kw ≈ 10,5 Kw. New air circulation modeling design using Kazemaru software.Keywords: Vetilation Lines, Ventilation Network Sistem,Underground Mining, Air Quality and Air Quantity
Hilirisasi Kegiatan Penggalian dan Pengangkutan pada Penambangan Batu Kapur di PT. Semen Padang Intan Maharani Besri; Mulya Gusman
Journals Mining Engineering : Bina Tambang Vol 5, No 4 (2020): Journals Mining Engineering: Bina Tambang
Publisher : Departemen Teknik Pertambangan FT UNP

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24036/bt.v5i4.109428

Abstract

Abstract. PT. Semen Padang, which was established in 1990, is a state-owned company (BUMN) which is a national cement producer for the needs of the domestic market. PT Semen Padang uses the open pit mining method with a quarry mining system which includes land clearing, material unloading by blasting, loading, transporting and processing materials. to dismantle hard rock is usually done by blasting. The resulting blasting vibration must be in a safe condition for the surroundings. The reality on the ground is that blasting often creates impacts and complaints for the communities around the mine. The purpose of this paper is to find the results of the blasting fractionation produced by loading hauling and about the environment around the mine. The location of this research was carried out in the Karang Putih area of PT.Semen Padang, Padang City, West Sumatra Province in November 2019. From the blasting activity, the size of the rock fragmentation resulted from the blasting was small from 80 cm, only 53.218%,From loading and hauling activities, the Hitachi EX 2500-6 (EH06) excavator productivity is 805.47 tons / hour, the Komatsu 785-7 Heavy Dumptruck is 203.177 tons / hour, the required Heavy Dumptruck is 4 units, and the work compatibility of the tools is 0.807. , Crusher VI productivity is 2128,761 tonnes / hour and the total production in December 2019 is 10218.0545 tonnes / month. water pollution control, Air Pollution Control, Noise Level Quality Standards, Vibration Level Quality Standards. Keywords: fragmentation, productivity, production, limestone, environment

Page 2 of 2 | Total Record : 12


Filter by Year

2020 2020


Filter By Issues
All Issue Vol 10, No 1 (2025): Journals Mining Engineering: Bina Tambang (On Progress) Vol 9, No 2 (2024): Journals Mining Engineering: Bina Tambang Vol 9, No 1 (2024): Journals Mining Engineering: Bina Tambang Vol 8, No 3 (2023): Journals Mining Engineering: Bina Tambang Vol 8, No 2 (2023): Journals Mining Engineering: Bina Tambang Vol 8, No 1 (2023): Journals Mining Engineering: Jurnal Bina Tambang Vol 8, No 1 (2023): Journals Mining Engineering: Bina Tambang Vol 7, No 3 (2022): Journals Mining Engineering: Bina Tambang Vol 7, No 2 (2022): Journals Mining Engineering: Bina Tambang Vol 7, No 1 (2022): Journals Mining Engineering: Bina Tambang Vol 6, No 5 (2021): Journals Mining Engineering: Bina Tambang Vol 6, No 4 (2021): Journals Mining Engineering: Bina Tambang Vol 6, No 3 (2021): Journals Mining Engineering: Bina Tambang Vol 6, No 2 (2021): Journals Mining Engineering: Bina Tambang Vol 6, No 1 (2021): Journals Mining Engineering: Bina Tambang Vol 5, No 5 (2020): Journals Mining Engineering: Bina Tambang Vol 5, No 4 (2020): Journals Mining Engineering: Bina Tambang Vol 5, No 3 (2020): JURNAL BINA TAMBANG Vol 5, No 3 (2020): Journals Mining Engineering: Bina Tambang Vol 5, No 2 (2020): Journals Mining Engineering: Bina Tambang Vol 5, No 1 (2020): Journals Mining Engineering: Bina Tambang Vol 4, No 4 (2019): Journals Mining Engineering: Bina Tambang Vol 4, No 3 (2019): Journals Mining Engineering: Bina Tambang Vol 4, No 2 (2019): Journals Mining Engineering: Bina Tambang Vol 4, No 1 (2019): Journals Mining Engineering: Bina Tambang Vol 3, No 4 (2018): Journals Mining Engineering: Bina Tambang Vol 3, No 3 (2018): Journals Mining Engineering: Bina Tambang Vol 3, No 2 (2018): Journals Mining Engineering: Bina Tambang Vol 3, No 1 (2018): Journals Mining Engineering: Bina Tambang Vol 2, No 1 (2015): Journals Mining Engineering: Bina Tambang Vol 1, No 2 (2014): Journals Mining Engineering: Bina Tambang Vol 1, No 1 (2014): Journals Mining Engineering: Bina Tambang More Issue