cover
Contact Name
Augusta Adha
Contact Email
augusta.adha@eng.uir.ac.id
Phone
-
Journal Mail Official
saintis@journal.uir.ac.id
Editorial Address
-
Location
Kota pekanbaru,
Riau
INDONESIA
JURNAL SAINTIS
Published by Universitas Islam Riau
ISSN : 14107783     EISSN : 25807110     DOI : -
Core Subject : Social, Engineering,
Saintis is devoted to research on civil engineering related fields including geotechnics, transports, structures, water resources and others related with civil engineering topics.
Arjuna Subject : -
Articles 5 Documents
Search results for , issue "Vol. 15 No. 2 (2015)" : 5 Documents clear
Optimalisasi Pelaksanaan Proyek Konstruksi (Studi Kasus : Jalan Simpang Beringin-Maredan): Optimization Of Construction Project (Case Study : Jalan Simpang Beringin - Maredan ) Retno, Deddy Purnomo
JURNAL SAINTIS Vol. 15 No. 2 (2015)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (610.836 KB)

Abstract

[ID] Proyek peningkatan Jalan Simpang Beringin- Maredan merupakan Proyek Pemerintah Provinsi Riau yang diselenggarakan pada anggaran proyek tahun 2014. Proyek ini terletak pada ruas yang merupakan salah satu jalan akses menuju Kabupaten Siak. Rumusan masalah dalam penelitian ini adalah mengenai berapa besar waktu dan biaya yang diperlukan jika dilakukan crash program dengan menggunakan metode penambahan tenaga kerja baru, serta alternatif yang digunakan pada Jalan Simp. Beringin-Maredan untuk mencapai hasil yang optimal. Metode yang digunakan adalah metode penambahan tenaga kerja baru. Berdasarkan hasil penelitian dan perhitungan dengan network planning dengan metode lintasan kritis (CPM) dan dipercepat dengan menggunakan metode penambahan tenaga kerja baru dapat diambil kesimpulan bahwa dari 88 hari kerja menjadi 81 hari kerja, maka didapat efisiensi waktu pelaksanaan proyek sebesar 7,954% atau lebih cepat 7 hari dari durasi awal. Hasil dari komparasi didapat penambahan biaya akibat metode tenaga kerja baru sebesar Rp. 37.854.600,00 dan metode kerja lembur sebesar Rp. 23.280.000,00. Hasil dari penelitian menunjukan durasi optimal dengan biaya yang lebih efisien pada alternatif metode kerja lembur. [EN] The road improvement project Simpang Beringin- Maredan the Riau provincial government project which was held in the project budget in 2014. The project is located on a road which is one of the access roads to the Siak. The problem of this research is about how much time and cost required if done crash program by using the method of adding new workers , as well as the alternative use on Jalan Simp . Banyan - Maredan to achieve optimal results. The method used is the method of adding new workers . Based on the results of research and calculations with network planning method critical path ( CPM ) and accelerated by using the method of adding new workers can be concluded that from 88 working days to 81 working days , the importance of the efficiency of project implementation time amounted to 7.954 % or faster 7 days of the initial duration . The results of the comparison obtained additional labor costs due to a new method of Rp. 37,854,600.00 and methods overtime Rp. 23,280,000.00. Results from the study showed the optimal duration of more cost efficient on the alternative methods of overtime.
Analisa Teknis Daya Dukung Pondasi Bore Pile Pembangunan Gedung Kantor PT. PLN (Persero) P3B Sumatera-Pekanbaru: Technical Analysis Capability Bore Pile Foundation Of Office Building PT. PLN (Persero) P3B Sumatera - Pekanbaru Ardiansyah, Roni
JURNAL SAINTIS Vol. 15 No. 2 (2015)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (942.887 KB)

Abstract

[ID] Pemilihan jenis dan dimensi pondasi tiang adalah suatu hal yang perlu diperhatikan dalam perencanaan pembangunan suatu gedung untuk memikul beban bangunan yang akan dibangun. Analisis dilakukan dengan menggunakan metode statis berdasarkan data SPT dan terhadap material, dengan mengasumsikan dimensi dan kedalaman pondasi yang akan digunakan dengan menggunakan dua opsi dan enam asumsi yang bertujuan untuk memperoleh pemilihan permodelan perencanaan pondasi Bore pile. Selanjutnya dilakukan analisa daya dukung kelompok tiang, serta penurunan tiang yang terjadi. Hasil penelitian menunjukkan dengan menggunakan pondasi Bore pile dengan ukuran dimensi tiang yang besar, jumlah tiang sedikit akan menghasilkan daya dukung yang besar dibandingkan dengan pondasi minipile dengan ukuran dimensi tiang yang kecil dengan jumlah tiang yang banyak, karena dipengaruhi oleh nilai efisiensi tiang. [EN] Selection of the type and dimensions of the pile is a matter that needs to be considered in planning the construction of a building to carry the load building to be constructed. Analysis were performed using the static method based on SPT data and on the material, assuming the dimensions and depth of the foundation that will be used by using two options and six assumptions that aims to gain election Bore pile foundation design modeling. Furthermore, the analysis of the carrying capacity of pile groups, as well as the decline that occurred pile. The results showed using Bore pile foundation with a large pile dimensions, number of piles bit will generate a large carrying capacity compared with minipile foundation with dimensions smaller pile with the number of poles that a lot, because it is influenced by the efficiency of the pile.
Asesmen Pemulihan Potensi Daur Ulang Material Sampah Perkotaan Di TPA Sampah: Assessment for Recovery Potential of Municipal Solid Waste Material Recycling in Landfill Annisa, Bismi
JURNAL SAINTIS Vol. 15 No. 2 (2015)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (959.808 KB)

Abstract

[ID] Kesadaran masyarakat untuk memilah sampah dimulai dari sumber timbulan sampah berdasarkan komposisinya masih sangat rendah, sehingga sampah basah dan kering tercampur. Dampaknya, potensi sampah sebagai sumber daya menurun. Tujuan penelitian ini adalah untuk melakukan asesmen pemulihan potensi daur ulang material sampah perkotaan di TPA (Tempat Pemrosesan Akhir) sampah untuk pembangunan infrastruktur persampahan yang berkelanjutan. Sehingga sampah yang dianggap sebagai residu dapat menjadi sumber daya, memiliki nilai ekonomi, dan mengurangi beban TPA. Metode penelitian ini adalah survei dan wawancara dengan pemulung untuk identifikasi potensi daur ulang material sampah di TPA Cipayung, Depok. Berdasarkan hasil penelitian, rata-rata sampah yang dapat dijual dari TPA sampah adalah 45,74 kg/pemulung/hari. Komposisi sampah yang dikumpulkan oleh pemulung setiap hari terdiri dari sampah plastik (51,04%); kertas, kardus, karton (23,80%); substansi organik seperti tulang (14,27%); kaca (5,78%); serta aluminium dan logam (5,11%). Tingkat pemulihan material daur ulang dari TPA sampah terhadap laju pengangkutan sampah perkotaan yang masuk ke TPA adalah sebesar 3,16%. Pendapatan rata-rata setiap pemulung adalah sebesar Rp.65.000,-/hari. Disimpulkan bahwa sampah di TPA berpotensi untuk pemulihan daur ulang dan bernilai ekonomi. Untuk menghindari konflik kepentingan dari berbagai pihak, diperlukan skema kerja sama yang menguntungkan antara pihak pemerintah, pemulung, dan sektor industri (misalnya: swasta). [EN] Public awareness of waste sorting starts from the source based on its composition is still very low, so the wet and dry waste mixed. The impact, waste potential as a resource decreases. The purpose of this study is to assess the recovery potential for municipal solid waste material recycling in landfill (final processing) to the development of sustainable waste infrastructure. So that waste which considered as the residue could become as resource, have economic value, and reduce the burden on landfill. This research method is doing survey and interview with scavengers to identify potential recycling of waste materials in the landfill Cipayung, Depok. Based on the results, the average waste that can be sold from the landfill is 45,74 kg / scavenger / day. The composition of waste collected by scavengers each day consists of plastic waste (51,04%); paper, cardboard, paperboard (23,80%); organic substances such as bones (14,27%); glass (5,78%); as well as aluminum and metal (5,11%). The recovery rate of recycled material from landfill to the rate of municipal solid waste transport that goes to landfill amounted to 3,16%. Average revenue per scavenger amounted Rp.65.000, - / day. The conclusion, waste in the landfill has the potential for recovery recycling and economic value. To avoid conflicts of interest from various parties, the necessary cooperation schemes needed for benefit to government, scavengers, and the industrial sector (eg private).
EVALUASI STRUKTUR KUDA-KUDA BAJA GEDUNG C FKIP UNIVERSITAS ISLAM RIAU BERDASARKAN SNI 03-1729-2002: Evaluation of Steel Truss on FKIP Building of Riau Islamic University Building with SNI 03-1729-2002 Suryadi, Suryadi; Dewi, Sri Hartati
JURNAL SAINTIS Vol. 15 No. 2 (2015)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (702.728 KB)

Abstract

[ID] Penelitian ini dilakukan pada gedung C Fakultas Keguruan dan Ilmu Pendidikan Universitas Islam Riau berdasarkan SNI 03-1729-2002 dimaksudkan untuk melihat sejauh mana efektifnya penggunaan bahan baja seperti gording dan dimensi profil kuda-kuda. Perhitungan gording menggunakan peraturan SNI 03-1729-2002 dengan metode statis tertentu, untuk menghitung panjang batang menggunakan metode analitis dan untuk pendimensian profil kuda-kuda menggunakan peraturan SNI 03-1729-2002 yang berbasis pada metode LRFD (Load Resistance and Factor Design) dengan analisis balok-kolom (beam-column). Dari hasil analisa antara dimensi profil existing dan evaluasi terdapat perbedaan berat yang cukup signifikan, profil evaluasi lebih efisien sebesar 16,53% dan berpengaruh terhadap harganya. Untuk gording tegangan yang terjadi adalah 49,31% dari tegangan leleh minimum, untuk gaya geser yang terjadi adalah 74,57% dan untuk lendutan yang terjadi adalah 21,33% dari lendutan yang diizinkan. dapat disimpulkan bahwa gording masih bisa diperkecil dan profil yang paling efisien digunakan untuk struktur kuda-kuda pada gedung C FKIP-UIR adalah profil WF 346.174.6.9. [EN] This research on the C buildings of FKIP of Riau Islamic University used SNI 03-1729-2002 meant to see which effective of materials such as steel truss. This research was using SNI 03-1729-2002 with static method, the length of element was using the analytical method and dimensian profiles was using SNI 03-1729-2002 based on the LRFD (Load and Resistance Factor Design) methods for beam-column (beam-column) analysis. The result of analysis are significant differences in weight, more efficient profile of 16.53% and price. For Stressing of gording is 49.31% from the minimum yield stress, to shear force is 74.57% and for the deflection is 21.33% from the deflection allowed. it can be minimized and the most efficient profile is WF 346.174.6.9.
Perbandingan Nilai Kuat Tekan Beton Berdasarkan Beberapa Metode Persyaratan Penerimaan Beton di Indonesia: Comparison Values Concrete Compressive Strength Based on Several Methods Admission Requirements Concrete in Indonesia Abdullah, Abdullah; Harmiyati, Harmiyati
JURNAL SAINTIS Vol. 15 No. 2 (2015)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (897.681 KB)

Abstract

[ID] Tercapainya mutu beton yang direncanakan adalah salah satu hal penting dalam semua proyek yang menggunakan beton. Namun dalam upaya mencapai mutu beton sesuai dengan yang direncanakan itu harus mengikuti peraturan / pedoman standar yang ditetapkan di Indonesia. Bila kita melihat apa yang telah dialami selama ini diberbagai proyek, banyak sekali timbul permasalahan disekitar penerimaan mutu beton. Dengan cara mengenal lebih dekat segala persyaratan yang berkaitan dengan beton dan mengerti kaitan persyaratan satu dengan persyaratan lainnya akan membantu mempermudah dalam aplikasi code/pelaksanaan peraturan yang dikeluarkan dalam satu pengertian yang benar. Metode yang digunakan adalah Peraturan Beton Indonesia (PBI'71), Pedoman Beton 1989 (PB'89) dan Standar Nasional Indonesia 2002 (SNI 03-2847-2002), dengan menggunakan data hasil test kuat tekan beton benda uji kubus mutu beton (K-275) sebagai data analisis dan perbandingannya. Dari hasil penelitian diperoleh bahwa kekuatan tekan beton dengan kekuatan tekan rencana K-275 Kg/cm2 atau fc' = 22,83 Mpa mulai dari DATA I (0,0% sika cim), DATA II (0,3% sika cim), DATA III (0,6% sika cim), DATA IV (0,9% sika cim) secara keseluruhan memenuhi syarat 100% berdasarkan Persyaratan PBI’71 dan SNI 03-2847-2002, namun adanya mutu beton yang tidak diterima oleh Persyaratan PB'89. Hal ini terjadi hanya pada DATA I dimana terdapat sekitar 7,5 % yang tidak diterima oleh persyaratan PB'89. SNI 03-2847-2002 lebih efektif untuk diterapkan dilapangan karena kriteria Penerimaan Mutu beton lebih mudah diikuti dan dari hasil evaluasi dan penerimaan mutu beton semua data dinyatakan memenuhi syarat dan standar deviasi yang dihasilkan lebih rendah dibandingkan standar deviasi menurut peraturan PBI'71 dan PB'89. untuk memperoleh mutu beton yang lebih ekonomis sebaiknya menggunakan SNI 03-2847-2002 sebagai acuan dalam mengevaluasi mutu beton. [EN] The achievement of the planned concrete quality is one important thing in all projects that use concrete. But in order to achieve the quality of concrete as planned it should follow the rules / guidelines established standards in Indonesia. When we look at what has been experienced so far in various projects, many problems arise around the reception quality of the concrete. By way get closer all the requirements relating to concrete and understood the association with the requirements of the other requirements will help facilitate the application code / implementation of regulations issued in one sense that is true. The method used is Rule Concrete Indonesia (PBI'71), Concrete Guidelines, 1989 (PB'89) and in 2002 the Indonesian National Standard (SNI 03-2847-2002), using data from the concrete compressive strength test specimen strength of concrete cube (K -275) as the data analysis and comparison. The result showed that the compressive strength of concrete with compressive strength of the plan K-275 kg / cm2 or fc '= 22.83 MPa from DATA I (0.0% sika cim), DATA II (0.3% sika cim), DATA III (0.6% sika cim), DATA IV (0.9% sika cim) overall qualified 100% based on the Terms PBI'71 and SNI 03-2847-2002, but their quality of concrete that is not accepted by the Terms PB '89. This happens only in DATA I in which there are around 7.5%, which is not accepted by PB'89 requirements. SNI 03-2847-2002 more effective to be applied in the field for Acceptance criteria quality of the concrete is easier to follow and the results of the evaluation and the reception quality of concrete all the data declared ineligible and the resulting standard deviation lower than the standard deviation according to the rules PBI'71 and PB ' 89. to obtain a more economical quality concrete SNI 03-2847-2002 should use as a reference in evaluating the quality of concrete.

Page 1 of 1 | Total Record : 5