cover
Contact Name
Augusta Adha
Contact Email
augusta.adha@eng.uir.ac.id
Phone
-
Journal Mail Official
saintis@journal.uir.ac.id
Editorial Address
-
Location
Kota pekanbaru,
Riau
INDONESIA
JURNAL SAINTIS
Published by Universitas Islam Riau
ISSN : 14107783     EISSN : 25807110     DOI : -
Core Subject : Social, Engineering,
Saintis is devoted to research on civil engineering related fields including geotechnics, transports, structures, water resources and others related with civil engineering topics.
Arjuna Subject : -
Articles 5 Documents
Search results for , issue "Vol. 24 No. 02 (2024)" : 5 Documents clear
Analisis Ketersediaan Air dan Kualitas Air Daerah Tangkapan Hujan Danau Sarantangan Kota Singkawang: Analysis of Water Availability and Quality in Habang River Catchment Area, Lake Sarantangan Intake, Singkawang City Nurhayati, Nurhayati; Irfansyah, Muhammad; Soeryamassoeka, Stefanus Barlian
JURNAL SAINTIS Vol. 24 No. 02 (2024)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2024.vol24(02).14570

Abstract

[ID] Danau Sarantangan terletak di Kelurahan Sagatani, Kecamatan Singkawang Selatan. Danau yang memiliki jarak 20 km dari Kota Singkawang ini memiliki luas 235 Ha dan berpotensi untuk dikembangkan sebagai sumber air baku bagi Kota Singkawang, khususnya Kelurahan Sagatani. Air baku agar dapat dimanfaatkan sebagai sumber air bersih, jika memenuhi syarat dari kuantitas air dan kualitas air. Tujuan dari penelitian ini adalah untuk mengetahui ketersediaan air dan kualitas air di intake Danau Sarantangan dan sekitarnya. Data primer, meliputi dimensi penampang dan kecepatan aliran di intake sumber air ke Danau Sarantangan, kedalaman Danau Sarantangan, dimensi penampang dan kecepatan aliran di saluran keluar Danau Sarantangan, sampel air di intake sumber air ke Danau Sarantangan, sampel air di Danau Sarantangan dan sampel air di saluran keluar Danau Sarantangan. Data sekunder adalah data curah hujan harian dan data iklim (suhu, kelembaban, kecepatan angin dan lama penyinaran matahari). Debit bulanan ditentukan menggunakan Metode Mock, debit andalan ditentukan menggunakan Metode Hazen. Hasil penelitian menunjukkan bahwa Danau Sarantangan memiliki ketersediaan air sebesar 0,003 m3/detik atau sebesar 259.200 liter/hari dan kualitas air pada Danau Sarantangan memenuhi syarat untuk dapat dikonsumsi dengan melakukan metode peningkatan kualitas air. [EN] Sarantangan Lake is located in Sagatani Village, South Singkawang District. The lake which has a distance of 20 km from Singkawang City has an area of 235 Ha and has the potential to be developed as a source of raw water for Singkawang City, especially Sagatani Village. Raw water is to be used as a source of clean water if it meets the water quantity and quality requirements. This study aimed to determine the availability of water and water quality in the intake of Lake Sarantangan and its surroundings. Primary data, including cross-sectional dimensions and flow velocity in the intake of water sources to Lake Sarantangan, depth of Lake Sarantangan, cross-sectional dimensions and flow velocity in the outlet of Lake Sarantangan, water samples in the intake of water sources to Lake Sarantangan, water samples in Lake Sarantangan and water samples in the outlet of Lake Sarantangan. Secondary data are daily rainfall data and climate data (temperature, humidity, wind speed, and duration of solar irradiation). The monthly debit is determined using the Mock Method, and the mainstay debit is determined using the Hazen Method. The results showed that Lake Sarantangan has a water availability of 0.003 m3/second or 259,200 liters/day and the water quality in Lake Sarantangan is eligible for consumption by improving water quality methods.
Model Pengaruh Tingkat Pendidikan, Pengalaman, Disiplin, Motivasi, Upah, Usia, Manajerial Terhadap Produktivitas Tenaga Kerja Konstruksi: Model of the Influence of Education Level, Experience, Discipline, Motivation, Wages, Age, Managerial on Construction Labour Productivity Waluyo, Rudi
JURNAL SAINTIS Vol. 24 No. 02 (2024)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2024.vol24(02).18292

Abstract

[ID] Suatu keberhasilan proyek konstruksi secara keseluruhan tergantung dari keberhasilan setiap pekerjaan yang ada dalam proyek tersebut, sedangkan salah satu faktor yang mempengaruhi keberhasilan suatu pekerjaan adalah produktivitas tenaga kerjanya. Produktivitas tenaga kerja akan sangat berpengaruh juga terhadap besarnya keuntungan atau kerugian suatu proyek. Dalam pelaksanaan dilapangan hal tersebut terkadang bisa terjadi dikarenakan tenaga kerja yang kurang efektif di dalam pekerjaannya. Ada banyak faktor yang dapat mempengaruhi produktivitas kerja. Penelitian ini bertujuan untuk membangun model pengaruh tingkat pendidikan, pengalaman, disiplin, motivasi, upah, usia, dan manajerial terhadap produktivitas tenaga kerja konstruksi. Penelitian dilaksanakan pada proyek pembangunan perumahan di Kota Palangka Raya. Metode penelitian yang digunakan yaitu survei. Kuesioner disebarkan secara langsung kepada tenaga kerja Mandor, Kepala Tukang, dan Tukang yang bekerja pada proyek pembangunan perumahan di Kota Palangka Raya. Penelitian dilakukan selama 3 bulan dari bulan November 2023 – Januari 2024 di Kota Palangka Raya. Responden penelitian berjumlah 100 orang. Analisis data menggunakan structural equation modeling partial least square. Hasil penelitian menunjukkan bahwa variabel pengalaman, disiplin, upah, dan manajerial berpengaruh positif dan signifikan terhadap produktivitas tenaga kerja. Sedangkan variabel tingkat pendidikan, motivasi, dan usia tidak terdapat pengaruh positif dan tidak signifikan terhadap produktivitas tenaga kerja konstruksi. [EN] The success of a construction project as a whole depends on the success of each job in the project, while one of the factors that affect the success of a job is the productivity of its workforce. Labor productivity will also greatly affect the amount of profit or loss of a project. In field implementation, this can sometimes happen due to ineffective labor in its work. There are many factors that can affect labor productivity. The objective of study is to develop the influence model of education level, experience, discipline, motivation, wages, age, and managerial on construction labor productivity. Implementation research on housing construction projects in Palangka Raya City. The research method used by conducting a survey distributing questionnaires directly to the workforce of foremen, head builders, and builders who work on housing construction projects in Palangka Raya City. The research was conducted for 3 months from November 2023 - January 2024 in Palangka Raya City. Tthe number of respondents was 100 people. Data analysis using structural equation modeling partial least square. The results showed that experience, discipline, wages, and managerial variables have a positive and significant effect on labor productivity. While the variables of education level, motivation, and age have no positive and insignificant effect on construction labor productivity.
Optimalisasi Proyek Rehabilitasi dengan Metode Value Engineering: Studi Kasus Perencanaan TK. Bakuwu Kota Palangka Raya: Optimizing Rehabilitation Projects Using Value Engineering Methods: Case Study of Bakuwu Kindergarten Planning in Palangka Raya City Bangun, Dwi Candra Karya; Purwantoro, Almuntofa; Dewantoro
JURNAL SAINTIS Vol. 24 No. 02 (2024)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2024.vol24(02).18810

Abstract

[ID] Pembangunan infrastruktur merupakan sektor yang krusial di Kota Palangka Raya karena berperan penting dalam pembangunan ekonomi, sosial, dan pendidikan. Penyediaan infrastruktur dasar yang merata merupakan kunci mewujudkan kota sipil. Namun, pemborosan biaya proyek seringkali terjadi karena kurangnya ide, informasi dan desain yang efektif. Penelitian ini bertujuan untuk mengoptimalkan biaya dan kinerja proyek rehabilitasi gedung Taman Kanak-Kanak (TK) Bakuwu di Kota Palangka Raya melalui penerapan metode Value Engineering (VE). Penelitian ini diawali dengan pengumpulan data proyek, dilanjutkan dengan analisis melalui empat tahapan VE: Informasi, Kreatif, Analisis, dan Rekomendasi. Setiap tahapan berfokus pada evaluasi material yang digunakan dan pencarian alternatif yang lebih efisien melalui analisis biaya, kualitas, waktu pelaksanaan, dan kemudahan pelaksanaan menggunakan matriks evaluasi zero-one. Hasil penelitian menyarankan perubahan material untuk efisiensi biaya: Pekerjaan dinding bata merah diganti dengan alternatif bata ringan, Pekerjaan atap genteng metal diganti dengan seng gelombang BJLS 25 (80cm x 180cm), Pekerjaan lantai keramik polished 40x40 (granito) diganti dengan keramik ukuran 40x40 (Essenza), Pekerjaan kusen alumunium 4" tidak diganti. Total penghematan biaya yang dapat diperoleh setelah dilakukan Value Engineering sebesar Rp76.080.526,00- dengan persentase sebesar 5,69%. [EN] Infrastructure development is a crucial sector in Palangka Raya City as it plays an important role in economic, social and educational development. Equitable provision of basic infrastructure is key to realizing a civic city. However, project cost wastage often occurs due to lack of ideas, information and effective design. This research aims to optimize the cost and performance of the Bakuwu Kindergarten building rehabilitation project in Palangka Raya City through the application of the Value Engineering (VE) method. This research begins with project data collection, followed by analysis through four stages of VE: Information, Creative, Analysis, and Recommendation. Each stage focused on evaluating the materials used and finding more efficient alternatives through analyzing cost, quality, execution time, and ease of implementation using a zero-one evaluation matrix. The results suggested material changes for cost efficiency: Red brick wall work replaced with lightweight brick alternative, Metal tile roof work replaced with BJLS 25 wave zinc (80cm x 180cm), Polished ceramic floor work 40x40 (granito) replaced with ceramic size 40x40 (Essenza), 4” aluminum frame work is not replaced. The total cost savings that can be obtained after Value Engineering is IDR 76,080,526.00- with a percentage of 5.69%.
Pengaruh Pemanfaatan Recycled Concrete Aggregate Sebagai Bahan Substitusi Agregat Kasar Terhadap Kuat Tekan Beton Geopolimer: The Effect of Using Recycled Concrete Aggregate to Substitute Coarse Aggregate on the Compressive Strength of Geopolymer Concrete Megasari, Shanti Wahyuni
JURNAL SAINTIS Vol. 24 No. 02 (2024)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2024.vol24(02).19095

Abstract

[ID] Inovasi material maju yang ramah lingkungan dilakukan dengan mengembangkan material konstruksi yang berasal dari limbah. Salah satunya adalah beton geopolimer yang memanfaatkan limbah fly ash sebagai pengganti semen dan recycled concrete aggregate (RCA) sebagai alternatif pengganti agregat kasar. Penggunakan limbah diharapkan dapat meningkatkan kualitas beton geopolimer. Tujuan penelitian adalah untuk menganalisis pengaruh substitusi recycled concrete aggregate terhadap kuat tekan beton geopolimer. Metode penelitian menggunakan studi eksperimental di laboratorium berdasarkan SNI 03-6825-2002 pada kuat tekan. Rancangan benda uji menggunakan molaritas aktivator 12M dan perbandingan katalitasator berupa Na2SiO3 (SH) dengan aktivator berupa KOH (SS) sebesar 2:1. Variasi subtitusi recycled concrete aggregate yang digunakan yaitu 0%, 25%, 50%, 75% dan 100% terhadap berat agregat kasar. Benda uji beton berbentuk silinder dengan diameter 10 dan tinggi 20 cm untuk pengujian kuat tekan sesuai dengan SNI 2847:2019. Pengujian kuat tekan digunakan pada umur 28 hari dengan perawatan suhu ruang. Hasil penelitian diperoleh nilai kuat tekan rata-rata dengan substitusi RCA 0%, 25%, 50%, 75%, 100% secara berurutan yaitu sebesar 2,89 MPa; 2,93 MPa; 3,27 MPa; 3,82 MPa dan 3,26 MPa. Nilai kuat tekan tertinggi diperoleh pada substitusi RCA sebesar 75% dan nilai kuat tekan rata-rata beton geopolimer mengalami peningkatan seiring dengan adanya penambahan substitusi RCA namun mengalami penurunan pada substusi RCA sebesar 100%. Hasil analisis kuat tekan beton geopoliner dengan metode analysis of variance diperoleh nilai Fhitung > Ftabel yaitu 3,52 > 3,11, sehingga dapat dinyatakan bahwa variasi substitusi recycled concrete aggregate berpengaruh terhadap nilai kuat tekan beton geopolimer [EN] Advanced material innovations that are environmentally friendly are carried out by developing construction materials derived from waste. One of them is geopolymer concrete that utilizes fly ash waste as a substitute for cement and recycled concrete aggregate (RCA) as an alternative to coarse aggregate. Waste users are expected to improve the quality of geopolymer concrete. The purpose of the study is to analyze the effect of recycled concrete aggregate substitution on the compressive strength of geopolymer concrete. The research method uses experimental studies in the laboratory based on SNI 03-6825-2002 on compressive strength. The design of the test piece uses an activator molarity of 12M and a ratio of the catalyst in the form of Na2SiO3 (SH) with the activator in the form of KOH (SS) of 2:1. The variations of recycled concrete aggregate substitution used are 0%, 25%, 50%, 75% and 100% to the weight of the coarse aggregate. Cylindrical concrete test piece with a diameter of 10 cm and a height of 20 cm for compressive strength testing in accordance with SNI 2847:2019. Compressive strength testing is used at 28 days of age with room temperature treatment. The results of the study obtained an average compressive strength value with RCA substitution of 0%, 25%, 50%, 75%, 100% respectively, which was 2,89 MPa; 2,93 MPa; 3,27 MPa; 3,82 MPa and 3,26 MPa. The highest compressive strength value was obtained in RCA substitution of 75% and the average compressive strength value of geopolymer concrete increased along with the addition of RCA substitution but decreased in RCA substitution by 100%. The results of the compressive strength analysis of geopolitan concrete by the analysis of variance method obtained the value of Fcal > Ftabel which is 3,52 > 3,11, so it can be stated that the variation of recycled concrete aggregate substitution has an effect on the compressive strength value of geopolymer concrete
Study Nilai Biaya Dan Waktu Alat Berat Pada Proyek Pembangunan Struktur Pipe Rack: Study of Cost and Time Value of Heavy Equipment on Pipe Rack Structure Project Yanto Martha; Sapitri; Oktavia, Ferly; Oktaviani, Atika
JURNAL SAINTIS Vol. 24 No. 02 (2024)
Publisher : UIR Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25299/saintis.2024.vol24(02).20537

Abstract

[IN] Pada proyek konstruksi penggunaan alat berat untuk membantu jalannya pekerjaan sering dilakukan karena dapat meningkatkan produktivitas dari pada alat konvensional. Penggunaan alat berat di proyek berfungsi untuk mempersingkat waktu dan dapat mengoptimalkan suatu pekerjaan dalam proyek tersebut. Pipe rack structure adalah struktur baja atau beton yang ditinggikan yang dirancang untuk mendukung baki pipa, listrik, dan kabel instrumen. Permasalahan yang sering dihadapi dalam pembangunan pipe rack structure dengan menggunakan alat berat adalah biaya dan waktu yang terbatas, kondisi lingkungan, cuaca dan faktor – faktor lain yang dapat membuat keterlambatan pekerjaan. Kondisi seperti ini yang kemudian berdampak pada nilai biaya dan waktu alat  berat dan berpengaruh terhadap proses pembangunan infrastruktur. Analisa mengenai nilai biaya dan waktu dengan mempertimbangkan faktor-faktor penyebab perlu dilakukan agar didapat hasil yang efektif dan efisien. Penelitian ini bertujuan untuk menghitung waktu dan biaya yang dibutuhkan oleh alat berat pada pekerjaan pembangunan pipe rack structure. Metode pengamatan dilakukan dengan cara time study, yaitu pengamatan langsung di lapangan untuk memperoleh waktu siklus dan diskusi dengan pihak-pihak  terkait. Kemudian data diolah untuk mendapatkan gambaran dari hasil penelitian yang telah  dilakukan. Hasil menunjukkan bahwa besar biaya operasional alat berat pada proyek pembangunan pipe rack structure berdasarkan perhitungan data lapangan dengan biaya operasional Crawler crane Zoomlion ZCC550H-1 sebesar Rp 838.725,00 perjam, tower crane Hino P11C-UN sebesar Rp 1.626.800,00 dan Truck Trailer sebesar Rp Rp 1.801.609,00 /jam. [EN] In construction projects, the use of heavy equipment to help carry out work is often done because it can increase productivity compared to conventional equipment. The use of heavy equipment in projects serves to shorten time and can optimize work in the project. A pipe rack structure is an elevated steel or concrete structure designed to support pipe trays, electrical, and instrument cables. Problems that are often faced in building pipe rack structures using heavy equipment are limited costs and time, environmental conditions, weather and other factors that can cause work delays. These conditions then have an impact on the cost and time value of heavy equipment and influence the infrastructure development process. Therefore, an analysis of the value of costs and time by considering the causal factors needs to be carried out in order to obtain effective and efficient results. This research aims to calculate the time and costs required for heavy equipment for a pipe rack structure construction project. The observation method is carried out by means of time study, namely direct observation inthe field to obtain cycle times and discussions with related parties. Then, process the data to get an overview of the results of the research that has been carried out. The results show that the operational costs for heavy equipment in the structure pipe rack construction project were obtained based on field data calculations with operational costs for the Zoomlion ZCC550H-1 crawler crane of IDR 838,725.00 per hour, the Hino P11C-UN tower crane of IDR 1,626,800.00 and the Truck Trailer Rp. Rp. 1,801,609.00/ hour

Page 1 of 1 | Total Record : 5