cover
Contact Name
Cut Rahmawati
Contact Email
jurnalteknikunaya@gmail.com
Phone
+6281360024335
Journal Mail Official
jurnalteknikunaya@gmail.com
Editorial Address
Center for Research and Community Service (LPPM) Building, University of Abulyatama, Aceh
Location
Kab. aceh besar,
Aceh
INDONESIA
JURNAL TEKNIK SIPIL UNAYA
Published by Universitas Abulyatama
ISSN : 2407733X     EISSN : 24079200     DOI : https://doi.org/10.30601/jtsu
JURNAL TEKNIK SIPIL UNAYA merupakan wadah bagi seluruh peneliti, pengambil kebijakan, perencana dan pelaksana konstruksi untuk saling berbagi dalam perkembangan pengetahuan dan teknologi di bidang konstruksi dan perencanaan lainnya. Frekuensi terbit dua kali setahun pada bulan Januari dan Juli.
Articles 4 Documents
Search results for , issue "Vol 2, No 1 (2016): Januari 2016" : 4 Documents clear
ANALISIS KINERJA SIMPANG TIGA TAK BERSINYAL Helwiyah Zain; Meliyana Meliyana; Muhaimin Muhaimin
Jurnal Teknik Sipil Unaya Vol 2, No 1 (2016): Januari 2016
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v2i1.20

Abstract

Simpang Lamlo is one of No-Signal Three-way Junctions in National Road from Banda Aceh to Medan as a Main road and is connected directly to the Cross-Regional Road that is from Beureuneun to Geumpang as the Minor Road and vice versa. The purpose of this study is to analyze the performance of the No-Signal Three-Way Junctions by using the Indonesian Highway Capacity Manual 1997. Data required in this study are primary and secondary data. The primary data is in the form of the condition data of traffic, intersection geometric, and environment. Secondary data includes the population growth and the map of the road network. Traffic data were collected by using video recording on Monday, Wednesday and Saturday at 7.00 a.m. – 9.00 a.m., 12.00 p.m. – 2.00 p.m and 5.00 p.m. – 7.00 pm. These data were processed by using Microsoft Excel based on MKJI 1997 and and the results were made in the form of tables and graphics. From the tables and graphics, it could be known for the traffic volume, composition, and the peak hours occured in the intersections. The calculation on the peak hour with the current highest peak is on Monday, 5.00 p.m. - 6:00 p.m. in which the traffic volume at the intersection is 2737 (smp / hour). The capacity value of the existing condition in Simpang Lamlo is 2762 (smp / hour). The traffic delay in the intersection is 11,63 (det / smp). The degree of saturation at the existing condition is 0.99, higher than the provision in Indonesian Highway Capacity Manual which is 0,75. The intersection delay value is 15.64 (det / smp) and the queue chance at the intersection is 39,43% to 77,98%,
PERSEPSI MASYARAKAT TENTANG ALTERNATIF PEMECAHAN MASALAH TRANSPORTASI DI JALAN RIAU KOTA PEKANBARU M Taufik Nizam; Puji Astuti; Mardianto Manan
Jurnal Teknik Sipil Unaya Vol 2, No 1 (2016): Januari 2016
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v2i1.17

Abstract

Riau street in Pekanbaru classified as secondary arterial roads with solid activit s so susceptible to the problem of traffic. The physical condition of damaged roads, land use mix and irregular, activities of right and left side crowded streets, parking inadequate, lack of public transport, and the behavior of road users who are not orderly, is the picture of the problem of traffic that occurs on the Riau street. This is supported also by the growth in the number of private vehicles. The accumulation of a variety of symptoms that led to the road capacity can no longer accommodate the volume of passing vehicles, causing traffic delays. One way to unravel this problem is to assess the public's perception of road users alternative solutions to problems related to urban transport in Riau street. The method used is descriptive quantitative with the number of respondents 100 people and supported by a statement from the policy holder of the traffic in the city of Pekanbaru . Public perception related factors causing transportation problems in Riau street is the traffic policy is less strict in discipline of road users, the traffic volume exceeds the capacity of the road, setting traffic light rigid, road users are not orderly, parking space is limited, public transport is limited, and the illegal parking. Alternative solutions is the increase in traffic policy, modify or regulate the flow of traffic, optimization of public transport facilities and infrastructure, restrictions on the use of private vehicles, road widening, traffic lights adjustment, socialization regulation and enforcement, and the construction of flyovers..
PENGARUH PERSENTASE PENAMBAHAN SIKA VISCOCRETE-10 TERHADAP KUAT TEKAN BETON Muhammad Zardi; Cut Rahmawati; T Khamarud Azman
Jurnal Teknik Sipil Unaya Vol 2, No 1 (2016): Januari 2016
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v2i1.18

Abstract

Building structure often use concrete as the main structural material, in which the concrete-forming materials such as cement, sand, gravel, water and additives. The aim of study is to investigate the influence of addition of Sika Viscocrete-10 toward concrete compressive strength. Concrete is planned with Water Cement Ratio 0.3. Slump values obtained for normal concrete with maximum aggregate diameter of 25.4 mm is 7.8 cm. The values are in accordance with the slump plan of 7.5 to 10 cm, meanwhile values slump that use Sika Viscocrete-10 as much as 0.5% is 19.5 cm; Sika Viscocrete-10 as much as 1% is 21.9 cm; Sika Viscocrete-10 as much as 1.5% is 23 cm; and Sika Viscocrete-10 as much as 1.8% is 24.7 cm. Based on these test results, the conclusion is addition of Sika Viscocrete-10 is able to enhance the workability value of concrete, so it is easy to work. Concrete mix design using the American Concrete Institute (ACI). Specimens used in this study is a standard concrete cylinder diameter of 150 mm and a height of 300 m, tested after the age of 14 days. Number of test specimens for all treatments is 25 with 5 specimens in each treatment. The average compressive strength of concrete with normal mixture is 295.43 kg/cm2; for concrete with Sika Viscocrete-10 as mush as 0.5% is of 376.50 kg/cm2; Sika Viscocrete-10 as mush as 1% is 452.94 kg/cm2; Sika Viscocrete-10 as mush as 1.5% is 501.63 kg/cm;2 and Sika Viscocrete-10 as mush as 1.8% is 515.78 kg/cm2. Concrete compressive strength greater with increasing percentage of Sika Viscocrete-10.
STUDI PENYUSUNAN PROFIL DAERAH IRIGASI JAMBO REUHAT Cut Rahmawati
Jurnal Teknik Sipil Unaya Vol 2, No 1 (2016): Januari 2016
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v2i1.19

Abstract

The purpose of compilation study  of Jambo Reuhat irrigation area profile was to collect correct and actual data and information as input in planning P3A organizational empowerment/”Keujruen Blang” program to improve the management of participatory irrigation in Jambo Reuhat Irrigation Area based on potential local resources. Jambo Reuhat Irrigation Area is located in the administrative area of East Aceh Regency which includes Idi Rayeuk, Idi Tunong, Darul Ihsan and Banda Alam Sub-districts. The method used was descriptive research which is case study and field study. SWOT analysis was performed to formulate strategy and policy which would be used. This study also distributed questionnaires to 12 (twelve) P3A in Jambo Reuhat Irrigation Area. The socio-economic aspect in Jambo Reuhat Irrigation Area should increase business opportunity for productive economy which could be developed optimally by agricultural intensification, improving technology mastery pre- and post-harvest, agronomy and agricultural business diversification. In organizational aspect, the status of P3A/”Keujruen Blang” should be raised to legal entity and have legality in performing works related to improving the performance of Jambo Reuhat Irrigation Area. In technical aspect, damaged irrigation channels and buildings with decreased functions should be. In agricultural business aspect, mastery and application method of efficient technology in crop processing, crop preparation to post-harvest should be improved. Potential local resource which should be developed was animal farming to support agricultural activities and to be integrated optimally with activities to improve farmers’ economy.

Page 1 of 1 | Total Record : 4