cover
Contact Name
Cut Rahmawati
Contact Email
jurnalteknikunaya@gmail.com
Phone
+6281360024335
Journal Mail Official
jurnalteknikunaya@gmail.com
Editorial Address
Center for Research and Community Service (LPPM) Building, University of Abulyatama, Aceh
Location
Kab. aceh besar,
Aceh
INDONESIA
JURNAL TEKNIK SIPIL UNAYA
Published by Universitas Abulyatama
ISSN : 2407733X     EISSN : 24079200     DOI : https://doi.org/10.30601/jtsu
JURNAL TEKNIK SIPIL UNAYA merupakan wadah bagi seluruh peneliti, pengambil kebijakan, perencana dan pelaksana konstruksi untuk saling berbagi dalam perkembangan pengetahuan dan teknologi di bidang konstruksi dan perencanaan lainnya. Frekuensi terbit dua kali setahun pada bulan Januari dan Juli.
Articles 5 Documents
Search results for , issue "Vol 5, No 2 (2019): Juli 2019" : 5 Documents clear
Analisa Produktivitas Tenaga Kerja Pada Pekerjaaan Rangka Atap Mulyadi Mulyadi; Hasnawati Hasnawati; Muhammad Ridha
Jurnal Teknik Sipil Unaya Vol 5, No 2 (2019): Juli 2019
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v5i2.285

Abstract

Productivity is an important factor in determining the success of a construction work. Increased productivity will reduce work time, and that means it will reduce costs. In general, the value of productivity is determined by the factor of the volume of work, implementation time, and the number of workers. In order to get the job done well, a planning effort is needed by paying attention to these factors. For this reason, this study was conducted to determine the value of productivity in one component of building construction work, namely lightweight steel roof truss work. The object of study was the work of lightweight steel roof truss 4 (four) project sites, namely the 4 x 25 Shop Houses Construction Project in Meulaboh, West Aceh, the Building of the Rector & Administration Bureau Building of STKIP Bina Bangsa Getsempena Banda Aceh, the Construction of the Getsempena Lhoksukon North Aceh STIKES Building and the Construction of North Aceh RIKI STIKes Building, Bina Nusantara Idi, East Aceh. The roof truss material used is type C Truss 75 0.75 Thickness. The volume of roof truss work is planned to be 2022.38 m2. The study was conducted through field observations by directly recording the volume of work, the duration of each stage of work, and the number of workers involved. The results of the analysis show that the productivity value for roof truss works is obtained by an average of 2,062 m2 / hour or 16,499 m2 / day. In the implementation of roof truss work, the amount of labor used is the same in all segments, so the value of productivity tends to be determined by the magnitude of the ratio between the volume of work and the effective time of implementation. Thus, if the amount of work volume can be completed in a shorter time then the value of productivity will increase
Desain Ulang Balok dan Kolom Komposit Syafridal Is; Muhammad Zardi; Nanda Mahathir
Jurnal Teknik Sipil Unaya Vol 5, No 2 (2019): Juli 2019
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v5i2.286

Abstract

The aim of this study is to redesign the beams and columns of reinforced concrete into a composite structure of Women's Empowerment and Child Protection Agency to derive a comparison of strength and efficiency between concrete-steel composite structures and reinforced concrete structures without changing the layout of columns and beams in the initial planning. LRFD (Load Resistance Factor Design) method and SAP2000 ver.14 as a tool were used in this study. The design was based on Indonesian Standard Regulation. The concrete strength (f’c) and steel strength ( were25 MPa and 250 MPa, respectively. In this study, steel profile BJ 37of WF (400 x 400 x 21 x 21) mm was used for beam and WF (400 x 400x 30 x 50) mm with concrete cross section (500 x 500) mm for column. The results of redesign composite structure for three-story building with the designed steel profile is fulfilled the strength requirements. The obtained maximum moment of beam and column are 36789,36 kg.cm and 43942,2 kg.cm, respectively. The used of composite material is 76,925% more expensive than reinforced concrete material.
Identifikasi Potensi Pembangkit Listrik Tenaga Hybrid (PLTH) Angin dan Surya di Kabupaten Aceh Besar Fadhli Fadhli; Ichsan Syahputra
Jurnal Teknik Sipil Unaya Vol 5, No 2 (2019): Juli 2019
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v5i2.287

Abstract

The Wind and Solar Hybrid Power Plant (PLTH) research is expected to be able to contribute to assist the development of electricity supply in Aceh and gradually reduce and substitute the use of fossil energy. Hybrid Power Plant (PLTH) by combining wind energy and solar energy is a sustainable electricity supply technology that is increasingly popular because it is environmentally friendly and is not much constrained by land conversion. This research by measuring wind speed and solar radiation was carried out at selected locations in Aceh Besar District namely Lhoksedu, Lampuuk, Lambadeuk and Krueng Raya. The Lhokseudu location has a maximum wind speed of 6.3 m / sec and an average wind speed of 1 m / sec while solar radiation is a maximum of 764.90 W / m2, an average of 467.87 W / m2 and a minimum of 155.40 W / m2. Location Lampuuk maximum wind speed of 7.6 m / sec and average wind speed of 1.1 m / sec while maximum solar radiation is 1193 W / m2, average 678.74 W / m2 and minimum 30.20 W / m2. The Lambadeuk location has a maximum wind speed of 13 m / sec and an average wind speed of 1.3 m / sec while maximum solar radiation is 1589 W / m2, an average of 626.01 W / m2 and a minimum of 38.50 W / m2. The location of Krueng Raya is a maximum wind speed of 9.4 m / sec and an average wind speed of 3.1 m / sec while solar radiation is a maximum of 1019 W / m2, an average of 811.65 W / m2 and a minimum of 493.50 W / m2. Based on the results of data collection and analysis of wind speed and solar radiation that have been carried out including using secondary data / wind speed data from Blang Bintang BMKG Station at Sultan Iskandar Muda Airport and BMKG Indrapuri Station, it can be concluded that the more potential for PLTH development is the location Lambadeuk and Krueng Raya.
Persepsi dan Motivasi Dalam Memilih Perumahan (Studi Kasus: Perumahan Villa Citra dan Villa Buana Garden) Edi Mawardi; Rinaldy Rinaldy
Jurnal Teknik Sipil Unaya Vol 5, No 2 (2019): Juli 2019
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v5i2.283

Abstract

In addition to being the center of Aceh's administrative administration, Banda Aceh is also the center of economic, educational and trade activities, so that economic growth and the population grow rapidly. Consumer factors in choosing housing vary greatly, because each individual has different desires in choosing the desired housing. The purpose of this study is to find out consumer factors in choosing and determining the desired housing. Based on the theories and views outlined, a resume can be made about consumer preferences in choosing and determining residence/housing. The results of the conclusion analysis of 100 respondents kept Villa Citra housing 39.02% age <30 years and 26.83% aged> 51 years while in Villa Buana housing 42.37% were aged 31-40 years. The two houses were complying with the Bachelor degree educational background, namely: 60.98% Villa Citra and 67.80% Villa Buana. analysis that 43.90% earned IDR 1,000,000 - 2,500,000 chose Villa Citra housing because of the influence of the distance to the city center of about 3.5 Kilometers. while Villa Buana reached 61.02% with an income of  IDR 2,500,001 - 4,000,000 with an urban center of around 5.5 Kilometers.
Pemodelan Kecepatan Arus dan Tinggi Gelombang Pada Rencana Breakwater Kolam Pelabuhan Meulaboh Dengan Menggunakan Program Delft3D Ichsan Syahputra; Heny Yuliana
Jurnal Teknik Sipil Unaya Vol 5, No 2 (2019): Juli 2019
Publisher : Center for Research and Community Service (LPPM) University of Abulyatama

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30601/jtsu.v5i2.284

Abstract

The Meulaboh port in West Aceh Regency is one of the ports in the west coast of Aceh Province. Initial operation of this port began in 2016 and currently serves crossing activities with the Meulaboh - Sinabang pass. The Meulaboh port is located in open water facing the Indian Ocean. In extreme conditions, ships often have to delay shipping due to high waves that cause shocks to the ship. Based on these problems, the study will provide an overview of the impact and hydrodynamic response of the Meulaboh port pool area and analyze the impact of wave heights on activities in the port pond based on several Breakwater construction layout scenarios. Alternative handling scenarios are carried out using the Delft3D program. The distribution of wave height at the direction of the wind from the Southwest with Hs = 4.908 m, and Ts = 7.254 seconds which shows the dominant wave from the Southwest restrained by Breakwater and the wave height in front of the port mouth ranges from between 0-1 meters so it is safe against activities cruise.

Page 1 of 1 | Total Record : 5