cover
Contact Name
Ristiyan Ragil Putradianto
Contact Email
ristiyan@upnyk.ac.id
Phone
+6285292102888
Journal Mail Official
jurusan_tm_ftm@upnyk.ac.id
Editorial Address
Jln. Padjajaran 104 (Lingkar Utara), Condong Catur, Depok, Sleman, DIY (55283)
Location
Kab. sleman,
Daerah istimewa yogyakarta
INDONESIA
Journal of Petroleum and Geothermal Technology
ISSN : 27230988     EISSN : 27231496     DOI : https://doi.org/10.31315/jpgt.v1i1
Journal of Petroleum and Geothermal Technology (JPGT) is a journal managed by Petroleum Engineering Department, Universitas Pembangunan Nasional "Veteran" Yogyakarta. This Journal focuses on the petroleum and geothermal engineering including; reservoir engineering, drilling engineering and production engineering.
Articles 5 Documents
Search results for , issue "Vol 3, No 1 (2022): May" : 5 Documents clear
Uncertainty Assessment for Field Development Study Using Monte Carlo Simulation on Salap Field Multilayer Gas Reservoir Fahrezi Oktaviandi; Boni Swadesi; Dyah Rini Ratnaningsih
Journal of Petroleum and Geothermal Technology Vol 3, No 1 (2022): May
Publisher : Universitas Pembangunan Nasional "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jpgt.v3i1.6996

Abstract

Uncertainty assessment for Field Development Study is often only carried out in a Deterministic Method by only creating scenario sensitivity based on theoretical assumptions without add subsurface risk factors. In the uncertainty assessment model, when a model is made with a variable that only has one value for each sensitivity is called the Deterministic Method. Meanwhile, when a model is made with a variable that has value in the form of a probability distribution, the method is called the Probabilistic Method. In the Probabilistic Method, the probability distribution is influenced by the risk factors, while in the Deterministic Method, these factors have no effect because the input value is only based on theoretical assumption. Uncertainty assessment for the Salap Field Development Study was carried out using the Probabilistic Method Monte Carlo Simulation. The results of the study provide the number of proven reservoirs, volume in place, volume of resources, number of development wells, plateau production period and field life that already accommodates subsurface risk factors and uncertainty in geological-reservoir data. The paper also compares the assessment result between the Probabilistic Method with the Deterministic Method to see how risk factors influenece the study results.
Management Of Shallow Gas Kick At Syh-05 Well In West Java Area Sandy Candra Yudha Halilintar; KRT Nur Suhascaryo; AM Suranto
Journal of Petroleum and Geothermal Technology Vol 3, No 1 (2022): May
Publisher : Universitas Pembangunan Nasional "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jpgt.v3i1.6297

Abstract

SYH-05 Well Drilling Operation West Java Area, was planned to be drilled with a final depth of 1694.65 mMD / 1500 mbpl by directional well drilling. Drilling hazards on the 17½” trajectory were shallow gas, gumbo, and bit balling. Furthermore, on this trajectory, shallow gas handling and optimization of drilling were going to be executed through shallow gas kick countermeasures in the SYH-05 Well. The high gas readings from the SYH-03 Well and the SYH-04 Well are 867 units and 1275 units, respectively, at a depth of 500-520 mMD intervals.After carrying out mitigation for shallow gas mitigation, the SYH-05 Well would use a higher Mud Weight than the reference well in this study starting with MW 1.12 SG while the reference well started with MW 1.08 SG, and the use of Annular – Single Ram 21-1/ 4” 2K with 10” Ball Valve as Diverter System. Moreover, to overcome the Kick Volume which was larger than the 17-1/2” hole, a 12-1/4” Pilot Hole would be installed. Prepare High Density Mud as a Contingency Plan and 4 Mud Pumps to anticipate the implementation of High Flow Rate Dynamic Kill. In the Cementing Design process, Gas Tight Slurry Cement would be applied.Based on the Casing Setting Depth analysis in the SYH-05 well drilling operation, there were 4 trajectories, namely: Conductor Casing 20”, 0-80m; Surface Casing 13-3/8”, 80-663.69m; Production Case 9-5/8”, 663.69-1060m; and Production Liner 7”, 1060.50-1694.65m. The implementation of Well Control was aimed to tackle the shallow gas kick was successfully executed in less than 1 hour without incident or accident. Work on the 17-1/2” trajectory which was a shallow gas zone could be done with the planned timetable.Keywords: Drilling hazard, Shallow gas kick, Optimization, Countermeasures
Selection & Optimization of Artificial Lift Using Delphi, TOPSIS, and SAW Methods for Natural Flow Oil Wells at HAS Field Hafis Syafrudin Anshari; Dedy Kristanto; Dyah Rini Ratnaningsih; Dimas Suryo Wicaksono
Journal of Petroleum and Geothermal Technology Vol 3, No 1 (2022): May
Publisher : Universitas Pembangunan Nasional "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jpgt.v3i1.6852

Abstract

ABSTRACTThe HAS field started producing oil and gas in 2004 until 2018, production wells in HAS experienced a decrease in oil production from 45,000 bopd to 6,190 bopd and an increase in water production from 0 bwpd to 20,463 bwpd. The decline in production occurs due to increased water production. The decrease in production was caused by a decrease in reservoir pressure, causing a larger water cut. Therefore, it is necessary to optimize production wells by considering the things mentioned above.The artificial lift selection method used is the Delphi method which has 21 screening parameters combined with the Topsis method; helps facilitate Decision-Making from various complex alternatives, by conducting comprehensive comparisons between each alternative and using the Simple Additive Weighting (SAW) method; known as the weighted addition method. The selection of the Artificial Lift in the HAS Field was carried out based on the reservoir parameters, production, well construction, and the economic factors of the artificial lift used. The artificial lift method that will be used in the HAS Field is the Electrical Submersible Pump (ESP). Based on the results of the selection of an artificial lift with a combined method of Delphi, Topsis, and SAW,Efforts to increase production with an electric submersible pump (ESP) are carried out by optimizing the number of stages and setting the frequency to a value of 45 Hz. Further optimization is carried out by gradually changing the pump frequency up to a maximum of 60 Hz, without changing the pump type. From the results of the economic analysis in the HAS Field, it was found that the most economical scenario was to use an ESP pump with the highest NPV@10 % value than the other scenarios, namely 434.85 MUS$.Keywords :Artificial Lift Conversion; Delphi; Topsis; SAW; Optimization
Evaluation of Water Channeling Problems and Planning for Its Improvement Using the Remedial Cementing Method and Its Economics in Well AB-30 Field AB PT. Pertamina EP Deni Kurniawan; KRT Nur Suhascaryo; Boni Swadesi
Journal of Petroleum and Geothermal Technology Vol 3, No 1 (2022): May
Publisher : Universitas Pembangunan Nasional "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jpgt.v3i1.6881

Abstract

The AB-30 well is an oil producing well located in the AB Field. Production performance data shows that AB-30 shows excessive water production behavior or is a high water cut production well. In addition, the interpretation of CBL data shows an amplitude value of <10 mV in the productive interval. This condition is an indicator that the primary cementing activity in this well is not good. Therefore, a comprehensive and integrated analytical method is needed to identify the problem of excess water production and to design and plan water shut-off activities through squeeze cementing as an effort to mitigate the problem of high water cut to economic analysis.The research begins by identifying the problem of excess water production, whether caused by water channeling, water coning, changes in water oil contact, or by the physical properties of the reservoir rock. Identification is done through production analysis and water diagnostic plots. The next stage is to evaluate the interpretation of CBL Logging results to strengthen the results of production data analysis. After confirming that the problem of excess water production is caused by poor cement bonding cement, the next step is to calculate the cement work program in order to repair the bad cement bonding. Subsequently, the productive zone interval re-perforation was carried out according to the results of the OH Loh Co Log evaluation. No less important is to conduct an economic analysis as a basis for whether or not this work is feasible.The result of this research is that the water shut-off activity went well and was able to reduce the level of excess water production in the AB-30 well and optimize oil production so as to provide a good economic indicator of oil recovery. Remedial cementing work for bonding repair was carried out at well AB-30. The first work is to close the existing layer, followed by Logging evaluation (CBL-USIT). The evaluation results showed that the cement bonding was good with the CBL amplitude parameter < 10 mV. After that, the productive zone reperforation was carried out. The economy by considering the values of economic indicators such as Pay Out Time and Rate Of Investment showed positive results so that the priority and strategy of well intervention could be continued. The results obtained before the well intervention were 148 BOPD oil production, 97% water cut after well intervention was 880 BOPD average oil production, 0% water cut for 1.5 months 
Multi Regression Analysis to Suggest Optimum Drilling Weight On Bit and Penetration Rate for Optimum Rate of Penetration Propose Well allen haryanto lukmana
Journal of Petroleum and Geothermal Technology Vol 3, No 1 (2022): May
Publisher : Universitas Pembangunan Nasional "Veteran" Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31315/jpgt.v3i1.6888

Abstract

R is a system for analyzing statistical data included in open source software group or also called freeware. R software less popular when compared with other paid statistical software such as SPSS, MINITAB, SAS or Eviews. Limited references and support especially in Indonesian, is one of the reasons statistical users prefer commercial statistical packages over free R software and provide results that are no less powerful and interesting graphics systems. Among many statistical techniques that R software can accomplish, one of the most popular is multiple regression analysis. In this article, we will discuss about multiple regression analysis modeling using R software as an alternative software for determining Weight on Bits (WOB) and optimal Rate of Penetration (RPM) in oil and gas drilling. Multi-regression analysis aims to get maximum drilling rate at drilling process, which is reduce drilling time and drilling cost. Bourgoyne and Young ROP models have been chosen to observe effects of several parameters during drilling operations such as drilling depth, pore pressure, equivalent circulation density, bit weight, rotating speed, bit tooth wear and jet collision force were extracted from the final drilling report. Results of the analysis are used to determine the optimum value of the weight of the bit which provides optimal drilling operations and optimized WOB has been calculated for several data points. the results show that R software can be used for multi regression analysis, and and produce a multi-regression equation that can be used to predict the optimum WOB and RPM for further drilling in equivalent rock formations.

Page 1 of 1 | Total Record : 5