cover
Contact Name
Unang arifin
Contact Email
bcsme@unisba.ac.id
Phone
+6282120524105
Journal Mail Official
bcsme@unisba.ac.id
Editorial Address
UPT Publikasi Ilmiah, Universitas Islam Bandung. Jl. Tamansari No. 20, Bandung 40116, Indonesia, Tlp +62 22 420 3368, +62 22 426 3895 ext. 6891
Location
Kota bandung,
Jawa barat
INDONESIA
Bandung Conference Series: Mining Engineering
ISSN : -     EISSN : 28282140     DOI : https://doi.org/10.29313/bcsme.v2i2
Bandung Conference Series: Mining Engineering (BCSME) menerbitkan artikel penelitian akademik tentang kajian teoritis dan terapan serta berfokus pada Teknik Pertambangan dengan ruang lingkup Analisis sensitivitas Net Present Value (NPV), Anggaran Biaya Crushing Plant, API 5L Grade B, Belt Conveyor, BESR II, Crude Oil, Crushing plant, Dimensi Paritan, Discounted Cash Flow (DCF), Dump Truck, Economic SR, Efisiensi Kerja Cassiterite, Gas, Korosi, Hopper, Internal Rate of Return (IRR), Kapasitas Sump Jalan Angkut, Lifetime Biaya Produksi, Loosematerials, Payback Periode (PBP), Pemompaan, Peringkat Batubara, Pipa Baja Karbon, Crude Oil, Pipa Baja, Pipa Transportasi, Pit Design BWE, Productin Rate Index Crushing Plant, Produktivitas Debit Air, Rencana Reklamasi, Roller, Sisa Umur Pakai Pipa Baja Karbon, Sisa Umur Pakai Pipa Reflektan Vitrinit, Sisa Umur Pakai, Sistem Dewatering, Target Ban, KPH, TUR, Variable Crushing Plan. Prosiding ini diterbitkan oleh UPT Publikasi Unisba. Artikel yang dikirimkan ke prosiding ini akan diproses secara online dan menggunakan double blind review minimal oleh dua orang mitra bebestari.
Articles 1 Documents
Search results for , issue "141 - 150" : 1 Documents clear
Rancangan Sequence Penambangan Batubara Tipe 3A Pit 81W Tambang Batubara PT Antareja Mahada Makmur Jobsite PIK Faizal Akbar Fachrezy; Dudi Nasrudin; Linda Pulungan
Bandung Conference Series: Mining Engineering 141 - 150
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abtract. This research aims to design an optimized short-term mine sequence to fulfill the specific production target of type 3A coal for the September 2025 period at Pit 81W, PT Antareja Mahada Makmur (AMM), Perkasa Inakakerta Jobsite. The main problem lies in the uncertainty of the tonnage distribution of type 3A coal, which requires high-precision scheduling. The research methodology integrates geological modeling using software and software-based scheduling on seams S74, S79, S79U1, S80, and S81. The optimization results indicate that the total production of type 3A coal reached 202,629 tons, exceeding the company's initial target of 121,338 tons. The volume of overburden removed was 1,469,974 BCM with an optimized stripping ratio (SR) of 7.00, lower than the initial target of 7.51. This success is based on the application of Standard Operational Parameters (SPO) with a Machine Availability (MA) of 90%, Physical Availability (PA) of 90%, Utilization of Availability (UA) of 66.5%, and average Effective Working Hours (EWH) of 14.35 hours. The use of software significantly improved the accuracy of synchronization between mine advancement and the allocation of mechanical units. Abstrak. Penelitian ini bertujuan untuk merancang urutan penambangan (mine sequence) jangka pendek yang dioptimalkan untuk pemenuhan target produksi batubara spesifik tipe 3A pada periode September 2025 di Pit 81W, PT Antareja Mahada Makmur (AMM), Jobsite Perkasa Inakakerta. Permasalahan utama terletak pada ketidakpastian distribusi tonase batubara tipe 3A yang memerlukan penjadwalan presisi tinggi. Metodologi penelitian mengintegrasikan pemodelan geologi menggunakan perangkat lunak dan penjadwalan berbasis perangkat lunak per pada seam S74, S79, S79U1, S80, dan S81. Hasil optimasi menunjukkan total produksi batubara tipe 3A mencapai 202.629 ton, melampaui target awal perusahaan sebesar 121.338 ton. Volume overburden yang dipindahkan sebesar 1.469.974 BCM dengan stripping ratio (SR) hasil optimasi sebesar 7,00, lebih rendah dibandingkan target awal 7,51. Keberhasilan ini didasarkan pada penerapan Standar Parameter Operasional (SPO) dengan nilai Machine Availability (MA) 90%, Physical Availability (PA) 90%, Utilization of Availability (UA) 66,5%, dan rata-rata Effective Working Hours (EWH) 14,35 jam. Penggunaan perangkat lunak secara signifikan meningkatkan akurasi sinkronisasi antara kemajuan tambang dengan alokasi unit mekanis.

Page 1 of 1 | Total Record : 1