cover
Contact Name
Sugeng Santoso
Contact Email
sugeng.santoso@mercubuana.ac.id
Phone
+6282132044774
Journal Mail Official
ti.jurnal@umm.ac.id
Editorial Address
Departement Industrial Engineering University of Muhammadiyah Malang Jl. Tlogomas No 246 Malang
Location
Kota malang,
Jawa timur
INDONESIA
Jurnal Teknik Industri
ISSN : 19781431     EISSN : 25274112     DOI : -
Dr. Saiful Anwar Malang is a state hospital has done it is job and function, but in 3rd class of pavilion room, the number of patient decrease dramatically. It is concerned with quality of this hospital. To answer this problem, research was done using Quality Function Deployment (QFD). Quality Function Deployment is a tool which design some needs include customers represented as a voice of customer and including some competitions and also groups some activities that usually called affinity graphic ang getting a benchmarking for it is competition. From the result analysis can be showed that main attribute for patience is a accuracy. And from House Of Quality can be found that getting a periodic meeting to evaluate this hospital and also increase a service can be made 20 concept
Articles 4 Documents
Search results for , issue "Vol 16, No 1 (2015): Februari" : 4 Documents clear
PEMILIHAN SUPPLIER BAHAN BAKU PARTIKEL DENGAN METODE AHP DAN PROMETHEE Wulandari, Ratri
Jurnal Teknik Industri Vol 16, No 1 (2015): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (837.087 KB) | DOI: 10.22219/JTIUMM.Vol16.No1.22-30

Abstract

The problem of choosing a supplier becomes very important to do a company to be able to meet consumer demand quickly and with quality. So far, the company has not implemented the supplier selection procedures and selection criteria not yet have a supplier. The method can be completed with the supplier selection criteria is the AHP method is used to determine the weights of criteria that have been corporations and PROMETHEE method used to determine the performance of the alternative. The purpose of this research is to identify the criteria used in the selection of a supplier company and determine the weight of these criteria and get ranked supplier to obtain the best supplier. The selected criteria in the selection of the supplier company is quality with a weight of 0.19, with a weight of 0.17 delivery, performance history with a weighting of 0.06, the price with a weighting of 0.36, communication system with a weighting of 0.06, the operating control with weights of 0.05, attitudes supplier with a weighting of 0.04 and a geographical location with a weight of 0.08 where as criteria rank order supplier is UD. TL as the first rank with a net value of flow for 0.254, UD. SD as the second rank with a value of 0.144 and a net flow PT.KTI as third with a net flow value of -0.397.
Pemilhan Pemasok Bahan Baku Kayu Handle Raket Dengan Menggunakan Metode Fuzzy Analitycal Hierarchy Process Pangestu, Yofa
Jurnal Teknik Industri Vol 16, No 1 (2015): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (901.394 KB) | DOI: 10.22219/JTIUMM.Vol16.No1.31-42

Abstract

Eternal racket company located in the Klayatan is a company engaged in manufacturing, where output is produced in the form of sports equipment. Given these problems, the Company is required Eternal racket must evaluate suppliers and choose which supplier should be selected with a view limits the capacity and various characteristics of suppliers. For that decision-making in the selection of suppliers is very important. Based on this problem researchers try to provide alternative solutions to the problem of decision-making by integrating the F-AHP is the combination of AHP technique to approach the concept of fuzzy logic. Although AHP is used in dealing with qualitative and quantitative criteria in MCDM but fuzzy AHP is considered better in describing vague decision of the AHP. and the supplier is a supplier selected priority A (P_A) with highest weight is 0.389.
Pemilihan Supplier dan Alokasi Order Asam Jawa Dengan Menggunakan Metode Fuzzy AHP Dan Goal Programing Mulasi, Sebro
Jurnal Teknik Industri Vol 16, No 1 (2015): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (554.641 KB) | DOI: 10.22219/JTIUMM.Vol16.No1.43-52

Abstract

Supplier selection process was become important consideration to improve the efficiency of procurement department because the raw material cost could reach 70% of product cost.  The supplier selection process was multi-criteria problem involving qualitative and quantitative factors. The company often experienced shortage of  good quality tamarind  with a cheap price which companies often reject order from customers. Therefore the company should make a selective supplier selection and allocation of orders for optimum results by considering both qualitative and quantitative factors that can minimize the cost of purchase, maximizing the weight of suppliers and minimize the total defect order. This research will integrate supplier weight from Fuzzy Analytic Hierarchy Process and Goal Programming model for the final decision of supplier selection and allocation of orders. By running goal programming model give solution better than order allocation current model where it could reduce total cost of purchasing at Rp 130.000.000 to Rp 127.700.000 and reduce total of defect order at 4%  to 0,87%.
Evaluasi Supplier Bahan Baku Plat Besi Dengan Menggunakan Metode Analytical Hierarchy Process Dan Taguchi Loss Function Khoiro, Wildatul
Jurnal Teknik Industri Vol 16, No 1 (2015): Februari
Publisher : Department Industrial Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (904.464 KB) | DOI: 10.22219/JTIUMM.Vol16.No1.10-21

Abstract

PT. Lamongan Marine Industry is a manufacturing company that produce large ships. The company have contracts with four suppliers of iron plate. In cooperation with these suppliers, they unable to meet the quality standards for iron plate is a measure of the thickness of the thick 45 mm. Material defects from suppliers thickness is less the limit set by the company is 0,3 mm – 0,5 mm. Process evaluation of the suppliers performed to look for suppliers that meet the criteria of the company. In this study, supplier evaluation process is carried out using Analytical Hierarchy Process (AHP) and Taguchi Loss Function (TLF). AHP for wighting each of criterian, while TLF  for calculating loss function each of supplier. Criterian of the supplier evaluation are price, quality, delivery, underweight, availability, payment system, guarantee policy and repair service, with wight for each criterion are 6%, 6%, 8%, 15%, 17%, 13%, 8% and 26%. The results showed that the best supplier that meets the company criteria is a supplier  PT. Biz Fitting with loss Rp. 1.140.973.

Page 1 of 1 | Total Record : 4


Filter by Year

2015 2015


Filter By Issues
All Issue Vol. 25 No. 2 (2024): August Vol. 25 No. 1 (2024): February Vol. 24 No. 2 (2023): August Vol. 24 No. 1 (2023): February Vol. 23 No. 2 (2022): August Vol. 23 No. 1 (2022): February Vol. 22 No. 2 (2021): August Vol. 22 No. 1 (2021): February Vol. 21 No. 2 (2020): August Vol. 21 No. 1 (2020): February Vol 21, No 1 (2020): February Vol 20, No 2 (2019): August Vol. 20 No. 2 (2019): August Vol. 20 No. 1 (2019): February Vol 20, No 1 (2019): February Vol 19, No 2 (2018): Agustus Vol. 19 No. 2 (2018): Agustus Vol. 19 No. 1 (2018): Februari Vol 19, No 1 (2018): Februari Vol 18, No 2 (2017): Agustus Vol. 18 No. 2 (2017): Agustus Vol. 18 No. 1 (2017): Februari Vol 18, No 1 (2017): Februari Vol. 17 No. 2 (2016): Agustus Vol 17, No 2 (2016): Agustus Vol. 17 No. 1 (2016): Februari Vol 17, No 1 (2016): Februari Vol 16, No 2 (2015): Agustus Vol. 16 No. 2 (2015): Agustus Vol. 16 No. 1 (2015): Februari Vol 16, No 1 (2015): Februari Vol 15, No 2 (2014): Agustus Vol. 15 No. 2 (2014): Agustus Vol 15, No 1 (2014): Februari Vol. 15 No. 1 (2014): Februari Vol. 14 No. 2 (2013): Agustus Vol 14, No 2 (2013): Agustus Vol. 13 No. 2 (2012): Agustus Vol 13, No 2 (2012): Agustus Vol 13, No 1 (2012): Februari Vol. 13 No. 1 (2012): Februari Vol 12, No 2 (2011): Agustus Vol. 12 No. 2 (2011): Agustus Vol 12, No 1 (2011): Februari Vol. 12 No. 1 (2011): Februari Vol 11, No 2 (2010): Agustus Vol. 11 No. 2 (2010): Agustus Vol. 11 No. 1 (2010): Februari Vol 11, No 1 (2010): Februari Vol 10, No 2 (2009): Agustus Vol. 10 No. 2 (2009): Agustus Vol 10, No 1 (2009): Februari Vol. 10 No. 1 (2009): Februari Vol 9, No 2 (2008): Agustus Vol. 9 No. 2 (2008): Agustus Vol 9, No 1 (2008): Februari Vol. 9 No. 1 (2008): Februari Vol. 8 No. 2 (2007): Agustus Vol 8, No 2 (2007): Agustus Vol. 8 No. 1 (2007): Februari Vol 8, No 1 (2007): Februari Vol. 4 No. 2 (2003) Vol 4, No 2 (2003) Vol 3, No 2 (2002) Vol. 3 No. 2 (2002) Vol. 3 No. 1 (2002) Vol 3, No 1 (2002) Vol 2, No 2 (2001) Vol. 2 No. 2 (2001) Vol 2, No 1 (2001) Vol. 2 No. 1 (2001) Vol. 1 No. 2 (2000) Vol 1, No 2 (2000) Vol 1, No 1 (2000) Vol. 1 No. 1 (2000) More Issue