cover
Contact Name
Andri Putra Kesmawan
Contact Email
journal@idpublishing.org
Phone
+6281990251989
Journal Mail Official
journal@idpublishing.org
Editorial Address
Perumahan Sidorejo, Jl. Sidorejo Gg. Sadewa No.D3, Sonopakis Kidul, Ngestiharjo, Kapanewon Kasihan, Kabupaten Bantul, Daerah Istimewa Yogyakarta 55184
Location
Kab. bantul,
Daerah istimewa yogyakarta
INDONESIA
Sustainable Civil Building Management and Engineering Journal
ISSN : -     EISSN : 30323711     DOI : https://doi.org/10.47134/scbmej
Core Subject : Engineering,
Sustainable Civil Building Management and Engineering Journal is an academic journal organized which a focus and scope: Sustainable Building Design and Construction, Civil Engineering for Sustainability, Building Management and Maintenance, Environmental and Social Considerations. The scope of SCBMEJ invites original research papers, review articles, and case studies that contribute to the advancement of sustainable practices in civil engineering, building management, and related disciplines. The journal encourages interdisciplinary approaches and welcomes submissions that address the challenges and opportunities at the intersection of environmental, social, and economic sustainability in the built environment.
Articles 5 Documents
Search results for , issue "Vol. 1 No. 1 (2024): January" : 5 Documents clear
Efektifitas Metode Job Instruction Training dan Visual Presentations dalam Pelatihan Tukang Bangunan Menerapkan Teknologi Ferosemen Gunasti, Amri; Sanosra, Abadi; Muhtar, Muhtar; Ipak Rahmawati, Erna
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2127

Abstract

Increasing the ability of builders to apply ferrocement technology as a building material is a very urgent activity. The use of visual presentations that represent Off the job training methods and job instruction training that represent On the job training as training methods for builders needs to be further investigated for their level of effectiveness. This research was conducted to measure the effectiveness of the two training methods using different tests. The aim of this research is to determine the effectiveness of the visual presentation method compared to job instruction training. The results of the research show that there are real differences in the indicators of skilled builders stripping plaster, skilled builders installing woven wire stands and knowing their sizes, skilled builders installing woven wire, skilled builders installing binding wire, understanding the sequence of implementation and understanding every detail. the size of each step in implementing ferrocement technology. The research results also stated that there was no difference in the ability indicators for Skilled Builders to Install Plaster using the Visual Presentations or Job Instruction Training methods.
Pengukuran Road User Satisfaction Index Jalan Jawa Kabupaten Jember Zainuddin Permana, Muhammad; Hamduwibawa, Rofi Budi; Gunasti, Amri
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2129

Abstract

Java Road is one of the roads located in Sumbersari District, Jember Regency, which is very busy and strategic, causing several problems, such as congestion, noise, traffic accidents and other things. Research on the level of satisfaction of Javanese road users is an urgent matter that must be done. The aim of this research is to analyze the level of importance and performance of Javanese roads. In this research, the basis for making the instrument was based on interviews with stakeholders and based on the RUSI (Road User Satisfaction Index) standard which had been used in previous research. The research results show that the Road User Satisfaction Index (RUSI) value on Javanese roads is 58.50. The RUSI value is in the range between 51-65.99 percent with quite satisfactory criteria.
Standarisasi Kinerja Waktu dan Biaya dengan Metode Earned Value pada Tahap Pekerjaan Struktur Proyek Agitiya Wahyu , Andre; Gunasti , Amri; Cahya Dewi , Ilanka
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2138

Abstract

The Jember Millennium Home Center Project experienced delays, because there was a difference between the costs that should have been spent not in accordance with the scheduled work performance and the difference here is negative. Therefore, research on cost index analysis and schedule performance index on the Jember Millennium Home Center project has no shortage of costs and the realization of completion work in the field is late. The purpose of this research is to calculate CPI and SPI. The method used in this research is Earned Value Analysis. The results showed that the Schedule Variant (SV) had a negative value of -Rp.30,940,091.57. While the value (CV) for 15 weeks has a positive value of Rp. 16,779,031.46, - from the difference in BCWP fees of Rp. 47,719,123 and ACWP Rp. 30,940,091, - means the project does not suffer losses.
Pengendalian Proyek dengan Metode Earned Value pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember Eriyanti , Merlita; Kuryanto, Totok Dwi; Gunasti, Amri
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2151

Abstract

The rehabilitation of the D.I Sumber Nangka Irrigation Network takes 180 days or about 6 months to implement, with a budget of Rp. 4,077,964,693. In this study, the authors will analyze the data using the Earned Value method. Therefore, there is no shortage of research on the basic components of project work costs and the realization of completion of work in the field is not too late. The purpose of this research is to calculate the cost of BCWS, BCWP, and ACWP. The results of the D.I Sumber Nangka Irrigation Network Rehabilitation study, Kec. Ledokombo was completed in the 24th week with a total cost of Rp. 4,077,964,693. in the 1st week to the 24th week the fee used is Rp. 3,702,175,554.
Perbandingan Daya Dukung Tiang Pancang dengan Alat Berat Drop Hammer dan Hydraulic Static Pile Driver (HSPD) Ardiansyah, Moch. Edwin; Aliehudien, Arief; Gunasti, Amri
Sustainable Civil Building Management and Engineering Journal Vol. 1 No. 1 (2024): January
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/scbmej.v1i1.2152

Abstract

The foundation is a base or bottom structure that can carry all the loads above it. Foundation bearing capacity and foundation settlement are very important for foundation planning. In the construction project for the Faculty of Agricultural Technology building at Jember Polytechnic, a recalculation analysis was carried out to compare the carrying capacity using two methods, namely HSPD and Drop Hammer. Soil bearing capacity is calculated based on Standard Penetration Test (SPT) data from 2 soil investigation points. Next, the soil bearing capacity is calculated using the Drop Hammer assumption. The research results show that there is a difference in the carrying capacity of HSPD and Drop Hammer. And the results can be carried out using 2 HSPD heavy equipment and a Drop Hammer at that location. In comparison, Drop Hammer and HSPD driving on a 25 x 25cm mini pile foundation can be carried out. And in the field you can use 2 heavy equipment simultaneously, namely HSPD for spun pile D 50 cm at the smallest permitted carrying capacity value of 68 tonnes at a depth of approximately 12 meters and drop hammer for mini piles at a permitted carrying capacity value of 40.94 tonnes at a depth of approximately 6 meters. However, if you use a drop hammer in areas near residents, don't forget to plan the trench work to reduce vibrations to the surrounding area.