cover
Contact Name
Hendri
Contact Email
hestiawan@unib.ac.id
Phone
+6282289599002
Journal Mail Official
hestiawan@unib.ac.id
Editorial Address
WR. Supratman Kandang Limun
Location
Kota bengkulu,
Bengkulu
INDONESIA
Rekayasa Mekanika: Jurnal Ilmiah Teknik Mesin
Published by Universitas Bengkulu
ISSN : 25974254     EISSN : 28292855     DOI : https://doi.org/10.33369/rekayasamekanika
Rekayasa Mekanika is scientific journal on mechanical sciences and engineering field, either pure or inter disciplinary works. This journal is a continuation of Rekayasa Mekanik which changed its name since April 2022. This journal publishes 6 articles for each issue, April and October. Starting April 2025, this journal publishes 10 articles. Authors are cordially invited to submit his/her research, review or monograph papers in English or Indonesian.
Articles 6 Documents
Search results for , issue "Vol. 4 No. 1 (2020): April 2020" : 6 Documents clear
THE HEAT TRANSFER FLOW ANALYSIS OF STANDARD PLATE STELL OF JIS G3106 GRADE SM20B ON PRE-HEATING JOINT WEB PLATE I-GIRDER PROCESS CASE STUDY IN PT. BUKAKA TEKNIK UTAMA, BOGOR REGENCY, WEST JAVA PROVINCE Puspawan, Angky; Pangestu, Mirza Aditya; Suandi, Agus; Alqaf, A. Sofwan Furqon
Rekayasa Mekanika: Jurnal Ilmiah Teknik Mesin Vol. 4 No. 1 (2020): April 2020
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/rekayasamekanika.v4i1.13270

Abstract

PT. Bukaka Teknik Utama in working on government projects, namely the construction of the Jakarta-Cikampek elevated toll road, the focus of fabrication of steel plates. The steel plate fabrication process, there is a pre-heating process for two steel plates connected by SAW welding with the Joint Web Plate process. During the pre-heating process, conduction heat transfer takes place from the PWHT ceramic to the steel plate. To complete the calculation of the unstable conduction heat transfer two equations are used, namely the equation q transient conduction and q the capacity of the object. Both equations are substituted to get the value of time needed to heat a steel plate from 40oC to 99oC. After calculation and analysis, it can be concluded that the heating time of JIS G3106 Grade SM520B steel plate is directly proportional to the desired temperature. Where the higher the heating temperature is desired, the longer the heating time required to reach the heating temperature. The calculation results obtained the smallest heating time value is 28.695193 seconds at a temperature of 40oC and the largest heating time value is 790.858579 seconds at a temperature of 99oC.
EFEKTIVITAS COOLING TOWER FAN 6P - 4051 – GB. DI PT. PUPUK SRIWIDJAJA SEKTOR STG – BB, PALEMBANG, SUMATERA SELATAN Triyansah, Olga; Witanto, Yovan
Rekayasa Mekanika: Jurnal Ilmiah Teknik Mesin Vol. 4 No. 1 (2020): April 2020
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/rekayasamekanika.v4i1.13272

Abstract

PT. Pupuk Sriwidjaja uses several cooling systems, one of which is the Cooling Tower Fan 6p - 4051 - GB cooling system. The cooling system is used for production machines especially in turbines. This practical work report will discuss the effectiveness of Cooling Tower Fan 6p - 4051-GB, by processing data on the temperature of incoming water, outlet water temperature, wet blub temperature and flow rate of water, then the calculation of actual data is then compared with ideal conditions, thus will be known how the performance of the Cooling Tower Fan 6p - 4051 - GB. From the analysis the ideal effectiveness value is 66.66% while for the actual effectiveness value is 64.5301%, the effectiveness decreases 2.136%. This is due to heat transfer from the system to the environment or vice versa. From the results of the analysis it can be seen in the data that the water temperature comes out at 10:00 always increases compared to the other hours. This is because at 10.00 the sunlight directly leads to the cooling tower water reservoir and on rainy days the effectiveness of the cooling tower will increase
PENGARUH POST CURING TREATMENT DAN PERENDAMAN AIR LAUT PADA KOMPOSIT HYBRID KEVLAR/KARBON Suryono, Ahmad Fauzan; Faizal, Ahmad; Hestiawan, Hendri
Rekayasa Mekanika: Jurnal Ilmiah Teknik Mesin Vol. 4 No. 1 (2020): April 2020
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/rekayasamekanika.v4i1.13273

Abstract

In composite engineering, there are also known hybrid composite types which allow the presence of two or more reinforcing particles and are usually arranged by a straight type and a random type. In this research, hybrid composites are made from a combination of kevlar fiber and carbon twill fiber using the vacuum assisted resin infusion (VARI) method. This fiber will be made into a composite consisting of ten layers with a composition of six layers of kevlar fiber and 4 layers of carbon twill fibers. Vinylester resin is used as a matrix on the composite. The hybrid composite material was given post curing treatment and soaked by sea water. From the tensile test results obtained an average ultimate tensile strength (UTS) value of 314.38 MPa at post curing temperature of 100 °C, then the results of compressive test of the kevlar/carbon hybrid composite with ASTM D6641 obtained an average compress strength value of 87.76 MPa at 100 °C postcuring and the results of the kevlar + carbon-vinylester composite shear test with ASTM D5379 obtained an average shear strength value of 20.45 MPa at post curing room temperature.
PEMANFAATAN INTERNET OF THINGS UNTUK MONITORING SUHU DI BPPT–MEPPO Ikhwanusshofa, Muhammad; Nuramal, Agus; Supardi, Nurul Iman
Rekayasa Mekanika: Jurnal Ilmiah Teknik Mesin Vol. 4 No. 1 (2020): April 2020
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/rekayasamekanika.v4i1.13274

Abstract

Proses monitoring suhu merupakan hal yang sangat penting untuk dilakukan khususnya dalam dunia industri. Dengan monitoring suhu, diperoleh data suhu yang dapat digunakan untuk melakukan quality control dan analisa pemecahan masalah ketika terjadi suatu kegagalan. Pada artikel ini akan diambil data suhu dan kelembaban di ruang workshop BPPT-MEPPO dengan menggunakan module DHT11 yang sebagai sensor suhu dan kelembaban. Sinyal yang diterima oleh DHT11 akan diolah oleh Raspberry Pi 3 dan dikirimkan ke ThingSpeak sebagai server penerima data. Setelah data masuk ke ThingSpeak, data pengukuran yang telah dilakukan dapat dilihat menggunakan handphone ataupun komputer yang mempunyai akses internet. Data yang diperoleh selanjutnya ditampilkan dalam bentuk grafik suhu dan kelembaban vs waktu. Tampilan grafik tersebut dapat diakses secara mobile dengan perangkat telefon yang terhubung dengan akses internet.
ANALISA LEVEL GETARAN COOLING WATER PUMP 1 JENIS SENTRIFUGAL Carnegie, Novrian; Suryadi, Dedi; Fitrilina, Fitrilina
Rekayasa Mekanika: Jurnal Ilmiah Teknik Mesin Vol. 4 No. 1 (2020): April 2020
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/rekayasamekanika.v4i1.13275

Abstract

PLTA Musi merupakan pembangkit listrik tenaga air dengan tipe Run of River (RoR) yang dimana bekerja dengan cara membelokkan sebagian aliran sungai musi untuk dimanfaatkan sebagai energi primer pembangkit. Pada Cooling Water System PLTA Musi terdapat Cooling Water Pump (CWP) yang berfungsi untuk memompakan air dari draft tube ke bagian peralatan yang membutuhkan sistem pendingin pada saat unit dioperasikan. Dalam pengoperasian pompa dapat terjadi berbagai masalah yang menimbulkan kerusakan, salah satunya disebabkan oleh getaran. Analisa getaran merupakan salah satu faktor pendukung untuk meminimalisir terjadinya getaran berlebih pada pompa. Kegiatan predictive maintenance dalam bentuk conditional monitoring vibration atau pemantauan getaran kondisi aktual dilakukan untuk mengetahui gejala kerusakan pada Cooling Water Pump. Pengukuran dilakukan menggunakan alat ukur VibXpert II berdasarkan standar ISO 18016-3 dengan kondisi operasi putaran poros 1486 RPM, daya 90 kW, dan 4 titik pengukuran. Nilai vibrasi tertinggi terdapat pada posisi DE Pompa dengan arah horizontal sebesar 3,71 mm/s. Nilai vibrasi tersebut sudah berada pada area alarm. Hasil analisa spektrum yang didapat pada penelitian diketahui jenis gangguan yang terjadi berupa indikasi kerusakan Mechanical Looseness Tipe B pada titik pengukuran DE Motor dan Mechanical Looseness Tipe C pada titik pengukuran DE Pompa.
PROSES REBENDING MENGGUNAKAN ROLL FORMING PADA PLAT SS 400/ JIS G3101 DI DALAM PEMBUATAN CORRUGATION STEEL PLATE MODEL 47J9-1C Bismantolo, Putra; Helmizar, Helmizar; Wiranto, Imam; Hoten, Hendri Van; Nurbaiti, Nurbaiti
Rekayasa Mekanika: Jurnal Ilmiah Teknik Mesin Vol. 4 No. 1 (2020): April 2020
Publisher : UNIB Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/rekayasamekanika.v4i1.13276

Abstract

Roll Forming Machine adalah produk teknis yang mengintegrasikan teknologi mekanik. Mesin ini menggunakan teknologi canggih dan sangat meningkatkan efisiensi produk. Alat ini dapat secara otomatis melokalisasi, menjepit, menyesuaikan, mengeroll, mengangkut hingga menyelesaikan pekerjaan. Mode otomatis dari jalur ini sangat menghemat biaya pembuatan, dan mesin ini menggunakan metode bending Roll Forming. Metode ini adalah proses bending yang menggunakan Up Roller dan Driven Roller yang berputar menggulirkan plat sehingga terbentuklah profil dan kelengkungan benda kerja. Dari metode Roll Forming akan didapatkan hasil dengan radius yang masih cukup besar. Standar radius pada alat ini yaitu dengan ukuran 9000mm.Jika ingin memperkecil ukuran radius maka diperlukan proses pengulangan bending (Rebending). Dengan proses Rebending maka diperlukan lagi waktu untuk pengecilan ukuran radius yang diinginkan.Cepat lambatnya proses Rebending tergantung dari bebrapa langkah yang akan dilakukan dalam menurunkan radius yang diinginkan.dengan variasi jarak penurunan up roller 3mm dan 4mm tentu akan membuat waktu pengerjaan yang berbeda. Dari variasi jarak penurunan up roll tersebut menghasilkan kurva perbandingan pengerjaan waktu total. Jarak penurunan up roller 3mm meghasilkan waktu 16,01 menit sedangkan jarak penurunan up roller 4mm lebih cepat yaitu 13,59 menit.

Page 1 of 1 | Total Record : 6