Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 4 Documents
Search results for , issue "Vol 1, No 4 (1999): Desember 1999" : 4 Documents clear
LICENSING PROCESS OF AN ABWR IN INDONESIA (A PRELIMINARY CONCEPT) Mauritz L. Tobing
Jurnal Pengembangan Energi Nuklir Vol 1, No 4 (1999): Desember 1999
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.1999.1.4.2007

Abstract

ABSTRACT LICENSING PROCESS OF AN ABWR IN INDONESIA (A PRELIMINARY CONCEPT). The formation of an independent nuclear regulatory body within Indonesia is very important in early step due to legislation aspect. Once formed, the Indonesian Regulatory Body will have to established a formal process for licensing of nuclear power plants in Indonesia. Drawing upon GE’s experience in obtaining a design certification for the standardized ABWR, a study was performed to look at a possible licensing process that could be established. It was concluded that the Indonesian Regulatory Body should take advantage of the U.S. NRC licensing process using the traditional two-step process, but incorporating selected portion's of the recently promulgated one-step process which will minimize the duplication of reviews. Relative to the ABWR design, the Indonesian Regulatory Body can take advantage of the fact that the basic design has been approved by the regulatory bodies in both the United States and Japan, and focus attention on site specific issues.   ABSTRAK PROSES LISENSI ABWR DI INDONESIA (SEBUAH KONSEP AWAL). Pembentukan Badan Pengawas Tenaga Nuklir yang independen di Indonesia adalah merupakan langkah awal yang penting ditinjau dari aspek hukumnya. Terbentuknya Badan Pengawas Tenaga Nuklir tentu akan menetapkan proses perizinan formal bagi Pusat Listrik Tenaga Nuklir di Indonesia. Berdasarkan pengalaman GE tentang diperolehnya sertifikasi desain ABWR terstandar, maka kajian ini dimungkinkan dalam penerapan proses perizinan dapat dilaksanakan. Ditarik kesimpulan, bahwa Badan Pengawas Tenaga Nuklir Indonesia sebaiknya dapat mengambil manfaat dari proses perizinan USNRC melalui proses dua-tahap yang tradisional. tetapi berkaitan itu pula, dari bagian yang dapat dipilih dari proses perizinan yang saat ini dikenal dengan tipe satu-tahap tentunya manfaatnya akan sangat mengurangi adanya proses kaji ulang (review) yang berulang-ulang. Berkaitan dengan desain ABWR, bahwa Badan Pengawas Tenaga Nuklir dapat juga mengambil manfaat dari fakta desain dasar yang telah disetujui oleh kedua badan pengawas di Amerika Serikat dan Jepang, dan difokuskan perhatiannya pada masalah tapak yang spesifik.
PEMILIHAN TAPAK PLTN DI SEMENANJUNG MURIA Hadi Suntoko
Jurnal Pengembangan Energi Nuklir Vol 1, No 4 (1999): Desember 1999
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.1999.1.4.2004

Abstract

ABSTRAK PEMILIHAN TAPAK PLTN DI SEMENANJUNG MURIA. Proses pemilihan tapak PLTN di Indonesia secara resmi dimulai tahun 1975 dengan dibentuknya Komisi Persiapan Pembangunan PLTN (KP2PLTN). Kegiatan pemilihan tapak merupakan tahapan penting yang dilakukan dengan sangat hati-hati, komprehensif dan rinci dengan menggunakan metoda diskriptif serta pengharkatan (scoring) terhadap kondisi yang akan dipilih tentunya melibatkan berbagai pihak yang berkompeten. Penelitian mengacu pada standar keselamatan nuklir yang berlaku seperti lAEA-Safety Series No. 50-C-S, SS No. 50-SG-S9, USNRC, CFR-100, BATAN JK-Tapak dll. Secara umum pelaksanaan pemilihan tapak terbagi tiga kegiatan: survei tapak, evaluasi tapak dan pemilihan tapak sebelum operasional. Survei tapak yang dilakukan adalah memilih tapak diantara satu dari tiga calon terbaik dengan petimbangan keamanan (safety) maupun segi yang tidak berhubungan dengan keamanan (non-safety). Karakteristik tapak yang dipertimbangkan sangat ditentukan oleh kelayakan lokasi sehingga tapak yang diperoleh adalah tapak yang aman terhadap gangguan yang mungkin muncul selama masa operasi PLTN. Melalui tahapan kegiatan survei dan kaji ulang guna pembaharuan (updating) data maka proses pemilihan tapak PLTN berhasil diselesaikan 1996 yang menyimpulkan bahwa tapak terbaik dan cocok untuk fondasi PLTN adalah Ujung Lemahabang (ULA) yang terletak di desa Balong Kecamatan Bangsri, Kabupaten Jepara.   ABSTRACT SITE SELECTION OF NPP’s IN MURIA PENINSULA. Site selection process of Nuclear Power Plant in Indonesia started formal on 1975 to be performed the commission of develop a nuclear power plant/KP2PLTN. Site selection activity are important step with carried out by carefully, comprehensive and detail by using the descriptive method and scoring to that site selection. Elaborate activity uses of the Safety series standard lAEA-Safety Series like as the lAEA-Safety Series No 50-C-S, SS No. 50-SG-S9, USNRC, CFR-100, BATAN JK-site and soon. Generally of site selection process divides to three activity: site survey, evaluation and pre-operation selection. Site survey are site select between three prefers candidate site with considering of safety and non-safety. By step of the survey activity and study to aim updating data so site selection Nuclear power plant to be performed finally 1996 by conclusion that prefers candidate site are used to foundation Nuclear power plant are Ujung Lemahabang (ULA) that the location of Balong village, Bangsri district and Jepara regency.
ANALISIS KEEFEKTIFAN BIAYA REDUKSI RISIKO REAKTOR DAYA JENIS PWR Heni Susiati
Jurnal Pengembangan Energi Nuklir Vol 1, No 4 (1999): Desember 1999
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.1999.1.4.2005

Abstract

ABSTRAK ANALISIS KEEFEKTIFAN BIAYA REDUKSI RISIKO REAKTOR DAYA JENIS PWR. Dalam bidang teknik manajemen risiko, analisis keefektifan biaya pada reduksi risiko, dikenal sebagai salah satu metode untuk mengevaluasi dan menentukan alokasi optimal sumber-sumber proteksi dan keselamatan dalam sistem industri skala besar. Makalah ini mempertimbangkan beberapa isu yang timbul berkaitan dengan analisis keefektifan biaya reduksi risiko pada Pembangkit Tenaga Nuklir (PLTN). Dua hal penting yang harus diperhatikan yaitu mencakup saling ketergantungan antara kriteria yang mencirikan masalah reduksi risiko dan hasil-hasil agregasi dan prosedur-prosedur penimbangan yang diperlukan ketika kemultidimensian kriteria secara eksplisit diperhitungkan. Pembahasan masalah-masalah ini dijelaskan dengan hasil studi-studi kasus pada reduksi risiko masyarakat dan risiko yang berhubungan dengan pekerjaan di Pembangkit Tenaga Nuklir jenis PWR di Perancis selama pengoperasian normal. ABSTRACT COST-EFFECTIVENESS ANALYSIS OF RISK REDUCTION ON PWR NUCLEAR POWER PLANT. Within the field of risk management techniques, cost-effectiveness analysis of risk reduction is now recognized as an adequate method for evaluating and defining the optimal allocation of protection and safety resources within large industrial systems. The paper considers some of the issues that arise in connection with cost-effectiveness analysis of risk reduction at nuclear power stations. Particular attention is called to both the interdependence between criteria that needed when the multidimensionality of criteria is explicitly taken into account. The discussion of these problems is illustrated with results of case studies on both public and occupational risk reduction at French PWRs during normal operation.
PENENTUAN SUSUNAN LAPISAN TANAH DAN BATUAN DENGAN SISTEM WENNER Bansyah Kironi
Jurnal Pengembangan Energi Nuklir Vol 1, No 4 (1999): Desember 1999
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.1999.1.4.2006

Abstract

ABSTRAK PENENTUAN SUSUNAN LAPISAN TANAH DAN BATUAN DENGAN SISTEM WENNER. Dengan menggunakan metoda geolistrik sistem wenner dapat dilakukan penentuan pendugaan lapisan-lapisan tanah dan batuan dalam suatu daerah dan kedalaman maksimum dapat diketahui. Untuk memecahkan persoalan airtanah dibeberapa tempat di Indonesia seperti daerah pantai, daerah batu gamping, daerah endapan gunung berapi dan lokasi PLTN, cara pengukuran tahanan jenis sudah banyak membantu.   ABSTRACT DETERMINATION OF STONE AND SOIL LAYERS BY WENNER SYSTEM. By applying Wenner’s geoelectric method, the determination of stone and soil layer estimates at an area can be done, and the maximum depth can be known. In order to solve groundwater problems at several regions in Indonesia, such as coastal areas, limestone areas, volcano sediment areas, and NPP sites, the measurement of specific resistance has been quite helpful.

Page 1 of 1 | Total Record : 4


Filter by Year

1999 1999


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue