cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota semarang,
Jawa tengah
INDONESIA
JURNAL KARYA TEKNIK SIPIL
Published by Universitas Diponegoro
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 22 Documents
Search results for , issue "Volume 3, Nomor 3, Tahun 2014" : 22 Documents clear
ANALISIS PENGARUH KINERJA JEMBATAN TIMBANG TERHADAP KINERJA PERKERASAN DAN UMUR RENCANA JALAN (Studi Kasus Jembatan Timbang Salam, Magelang) Arief Fath Atiya; Okty Diana Wulan Sari; Djoko Purwanto; Bagus Hario Setiadji
Jurnal Karya Teknik Sipil Volume 3, Nomor 3, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

On Keprekan Road – Yogyakarta’s Limit is always crossed by heavy vehicles and sometimes overloaded. On that road found “Jembatan Timbang Salam”. Because of  still many phenomena the overloaded vehicles so that “Jembatan Timbang Salam” needs to be revisited its performance in dealing with violations of overloaded that will be effected the pavement performance. From the results of evaluation and analysis carried out, "Jembatan Timbang Salam" in category C which means its performance is in bad condition and it affects the performance of the existing pavement. Using the assumption of the initial design serviceability index (P0) 3.9, the design terminal service ability index (Pt) 2.5, Structural Number 5, and 10 years plan (2005-2015), overloaded that occurs in the field due to condition A (actual load), age of road performance only lasted for 9.48 years for the first analysis (using a growth rate for all classes of vehicles) and only lasted for 9.53 years for second analysis (using the growth rate for each type of vehicle class). Moreover there is also a decreasing road service ability index with an average decline for the first analysis due to standard JBI  load are 1.40% and due to condition A are 1.48%. And than, for the second analysis due to standard load average decline reached 3.07% and for condition A average decline reached 3.33%.But with the overlay in 2011, 2012 and 2013, the service ability index of the road are being increase. For the first analysis the increase reached 26.02% and 35.30% increasing for second analysis.
REKAYASA NILAI RENATURALISASI SUNGAI BODRI LAMA TERHADAP SUNGAI PECUT, KABUPATEN KENDAL Yanuar Danu Wijaya; Sriyana Sriyana; Frida Kistiani
Jurnal Karya Teknik Sipil Volume 3, Nomor 3, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sedimentation in the estuary of the Bodri River have a major impact on the flooding problems in the area around the Bodri River. To overcome this by planning Normalization Pecut River which has a large enough funding, so it is necessary to value engineering. The purpose of this paper is to obtain solutions to problems of sedimentation, coastal erosion, seawater intrusion and flooding, know the function and cost of the initial design (Normalization Pecut River), as well as getting the design alternatives (Re-naturalization Bodri Lama River) as a substitute for the initial design, which is further than the value of the function and cost. In terms of the normalization function Pecut River hydrologic analysis of the calculation results obtained by the discharge of floods over 25 years, the amount of Q25=18.236 m3/sec. The amount of sediment transport Pecut River, is 47.267 tons/year. Results hydraulics analysis with HEC-RAS program occurs runoff groove along the river, which means there is a flood. To Re-naturalisation Bodri Lama River flood discharge when re-used 50 years the amount of Q50=61.58 m³/sec. With the Renaturalisation of Bodri Lama River can reduce flood discharge in Bodri River at 5.73%. Old Bodri river sediment transport, amounting to 159.408 tons/ year. The results of the HEC-RAS program checks the water level in the re-naturalization of the Bodri Lama River be lower, so the plan is safe from flooding. In terms of costs for normalization Pecut River RAB calculation results obtained by Rp.34.269.498.000,00 (in words: Three-Four Billion Two Hundred Sixty-Nine Million Four Hundred Ninety Eight Thousand), to Renaturalisasi Bodri Lama River at Rp.10.362.242.000,00 (in words: Ten Billion Three Hundred Sixty-Two Million Two Hundred Forty-Two Thousand). Based on the analysis of value engineering, Renaturalisasi Bodri Lama River generate cost savings of RP. 23,907,256,000.00 (in words: Twenty-Three Billion Nine Hundred and Seven Million Two Hundred Fifty Six Thousand Rupiah).

Page 3 of 3 | Total Record : 22