cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Titra
ISSN : -     EISSN : -     DOI : -
Core Subject : Engineering,
Arjuna Subject : -
Articles 134 Documents
Search results for , issue "Vol 3, No 2 (2015)" : 134 Documents clear
Perancangan Lembar Evaluasi Komunikasi Antar Internal Departemen Demi Tercapainya Umpan Balik Di PT. XYZ Gunawan, Cinthia; Rahardjo, Jani
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Evaluation communicaton questionnaire has an important role in improving the internal department working performance because it can dig criticisms, suggestions and constructive feedback to each department. PT. XYZ is not currently using any evaluation questionnaire to dig internal department feedback. The purpose of this research is to design communication evaluation questionnaire to  achieve feedback from another department. The technique that used in this study is semi-structured interview to the respondents who selected using judgment sampling method. Analysis techniques and data processing done with the existing coding assistance in Microsoft Excel to generate descriptive data in the form of feedback between departments. Feedback for the department is divided into two types, namely strength and opportunity for improvement point. Strength point is the strength of a department that must be maintained and enhanced, while opportunity for improvement point points should be used as a reflection to improve the department for the better future.
Studi Kelayakan Pendirian Perusahaan OPP di Kota Sidoarjo Rachmadi, ellysa Lucia; bendatu, liem yenny
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This research aimed to determine the feasibility of OPP plastic Company establishment at Sidoarjo. The research consists of market aspect, technical aspect, legal aspect, and financial aspect. Data collection for market analysis is obtained from three plastic stores at Surabaya and interview method is used to get to know the competitor condition. The forecasting result in technical analysis is used as the input to find out the number of the folding and sealing machine. The number of machine is used to calculate how many operator the company should hire. After that, legal analysis is to know the legality of company establishment. The company requires initial investment Rp.670,693,900.00 and will reach break even point after 49 months with the 5 years internal rate of return 16.1%. Hence, this study is feasible by considering the market aspect, technical aspect, legal aspect, and financial aspect.
Perancangan dan Penerapan ISO 9001:2008 di PT. Teno Tract Indonesia Bintoro, Diah Parwati Dewi; Rahardjo, Jani
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. Teno Tract Indonesia, a foundation piling company, had dealt with many type of building construction for private sector, and now wants to get government projects. However, the government requires that PT Teno Tract Indonesia has ISO certificate. Hence, PT. Teno Tract Indonesia planned and prepared to implement quality management system based on ISO 9001:2008. PT. Teno Tract Indonesia also want to increase customer satisfication and improve management system. Three stages to get ISO 9001: 2008 certificate are planning stage, implementation stage and also scoring stage. Planning stage consists of mapping, identification, and documentation. The second stage is quality management system implementation. The last stage is scoring via internal audit. Audit has to be done to know compability of system that has been run based on standard requirements of ISO 9001 : 2008.  Based on internal audit simulation, PT Teno Tract Indonesia has been ready to submit the papers to get ISO certification.  
Perbaikan Manajemen Sistem Gudang di PT. Dewata Cipta Semesta Tjahjono, Enrico; Felecia, Felecia
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. Dewata Cipta Semesta is a company which focused in sawmills, wood products produced in the form of cut (sawn timber) for building’s materials or furniture’s raw materials. The Warehouse system at the company is still very simple and has many weakness that cause some problems in the company such as the difference between the stock and the physical stock in the warehouse as well as the lenght of the process of unloading. Based on observations and data analysis on company, there are some problems that result in differences in stock and phusical as well as the duration of the process of unloading are: the arrangement of goods in the warehouse are not grouped in detail, two warehouses head leads, and grading process is carried out when loading. Warehouse management system improvement is done to minimize the  difference between the stock and the physical stock in the warehouse as well as accelerate the process of unloading the goods. Warehouse management system improvements made are arrange of the raw material warehouse are grouped by type and diameter of the timber , the warehouse material classified by type , grade and size of the timber , making the Standard Operating Procedure for the warehouse staff. For make the system running properly also proposed to appoint only one head of the warehouse so that there is clarity on the duties and responsibilities of the warehouse. 
Efisiensi Mesin Diesel Pada Tambak Udang Dengan Eksperimen Desain Handoko, Nicholas; Bisono, Indriati Njoto
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

The operational cost to operate paddle wheel with generator at PT X is very high; for daily shrimp cultivation each farm need 14 paddle wheels that use 24 hours electricity from the generators. Thus an experiment was conducted to minimize the number of paddle wheels operated. Naturally, pond water contains phytoplankton that carries photosyntesis to produce oxygen at noon. Photosyntesis processes need carbon dioxide to turn to oxygen at noon, on the other hand paddle wheel also need the carbon dioxide in the pond and turn it into oxygen. Thus the two are conflicted. Turning off the paddle wheels at noon then increase the photosynthesis process, make it more effective. The experiment results show that turning off paddle wheel at noon did not affect oxygen supply and the average weight of the shrimps.
Rancangan Perbaikan Penataan Gudang di PT. Bondi Syad Mulia Setiadi, Ardenus Milton; Rahardjo, Jani
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. Bondi Syad Mulia is a company which provides galvanized for iron. Based on the observation, there is an issue on placing and storing the goods in the warehouse. This research is to solve the problem by re-organizing the layout and placing the label in warehouse division in PT. Bondi Syad Mulia. The proposed layout covers the arrangement of goods in the warehouse of materials and tools by considering the FMS classification. The improvement on labeling system was done by labeling of goods and a place for storing goods. The momen result of the proposed layout was reduced by 34,25%. After labelling was placed, the result showed that there was 10 second reduction on taking the files and 30 second reduction on taking the goods from the rack.
Standar Kerja dan Perencanaan Kualitas Potongan Daging Sapi dari RPH Sampai Display Pasar Tradisional Siswanto, Kelvin; Sutapa, I Nyoman
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Rumah Potong Hewan (RPH) is a place where do slaughter animals for food. Consumer demand for quality piece of meat made RPH must pay attention to the production process. Standardized work and quality plan is needed for the resulting product had a high quality, especially piece of meat. Standardized work and quality plan is not end until RPH, but also transportation and display at traditional market. Improvement methods used in this research is the method of Standardized work, quality plan, and fishbone diagram. This improvement will be supported by the establishment of some standardization work in order to maintain sustainable improvements in the future.
Evaluasi Sistem Pemenuhan Kebutuhan Bantuan dengan Melibatkan Sektor Swasta untuk Bencana Alam di Indonesia Wongso, Randy Christian; Widyadana, I Gede Agus
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

This study aimed to evaluate the compliance system of the reliefs through Indonesia aid agencies. Reliefs can be assembled and deployed from the government, private, and community. Logistical support needed for disaster management. Support logistical support should be on time, precise location, target, good quality, enough quantity, and needed. This research used interview method to the BPBD, PMI, and the private sector (KSR) and distributing questionnaires to 101 respondents to identify the communitys involvement in the current disaster management system. Results from this study indicate that the compliance system of the goods through disaster management agencies still lack involve the private sector and community involvement in disaster management at the program is still lacking. The current system is still considered less troublesome and won the trust of the public. The private sector is still less involved in this system, whereas the private sector is a party that can assist humanitarian organizations that exist today to meet their needs. One of the private parties who may be involved is KSR University
Perbaikan Tata Letak Fasilitas Departemen Sheet Metal 1 PT. MCP Pramono, Meylinda; Widyadana, I Gede Agus
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

Improvements layout on the sheet metal 1 department at PT. MCP held 45.89% due to backtracking that occurs when the operator does the production process. This improvement layout is built to match better layout for PT. MCP. The method used is the method of calculation of the moment without any cost calculation. Total moment of initial layout is 1,785,988.5. Improvement facility layout on sheet metal 1 department uses two methods. 2-Opt and CRAFT are both the methods. Calculations for 2-Opt method does not produce a total of better moment than the moment of the first layout, but the percentage of backtracking decrease to 38.95%. 2-Opt layout still can not be applied to the real situation because the moment is used as a reference. Otherwise total moment of CRAFT method generate better moment than the moment of the initial layout that is equal to 1,656,291.8 and percentage of backtracking also decreased to 23,69%. Layout CRAFT produced by the method can be applied to the real situation in the department of sheet metal 1 PT. MCP.
Upaya Penurunan Downtime pada Mesin Moulding di PT. X Ardyanto, Marvin; Felecia, Felecia
Jurnal Titra Vol 3, No 2 (2015)
Publisher : Jurnal Titra

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (78.005 KB)

Abstract

PT. X is a company that processed log wood into timber products with size, type of wood, and the shape of the profile are produced depends on the buyer’s order. The company needs the process with a machine that can work continuously without any obstacle in order to meet the demand. Moulding machine in PT. X has downtime with an average 13,22% which the company want to reduce it. The main cause of downtime on the moulding machine is the changeover and breakdown. How to reduce changeover time is by using the method of Single Minute Exchange of Dies (SMED) and reduce frequency and time of the breakdown by making preventive maintenance schedule based on the MTTF value. The proposed improvements to reduce changeover time is doing some activities before the machine stops, making a new storage for tools and ring, and do the parallel changeover. The proposed improvements using the method SMED when applied can reduce changeover time with an average decrease in time estimation of 33,26%. Preventive maintenance schedule on the moulding machines based on the simulation results within a year can reduce downtime due to breakdown with an average of 57,55%.

Page 2 of 14 | Total Record : 134