Putri, Atika Alifia
Unknown Affiliation

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALYSIS OF THE APPLICATION OF TIME MANAGEMENT IN THE RECONSTRUCTION PROJECT OF JALAN BINDERANG – SUNGAI IMPAT Putri, Atika Alifia; Khatimi, Husnul
CERUCUK Vol 10, No 3 (2026): CERUCUK VOL. 10 NO. 3 MARCH 2026
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/crc.v10i3.18918

Abstract

Time management is an important factor in ensuring the completion of a project. One of the important aspects of time management is scheduling. In this project, scheduling is based on barchart data, which is then further developed through this research using the PDM method. The data presented in the bar chart only includes the duration and sequence, therefore, a dependency analysis is required to determine the relationships between each work item according to PDM method. The duration analysisis conducted based on other data as listed in the project time schedule. Through the result of analysis, scheduling with the pdm method at Binderang – Sungai Impat Road Reconstruction project resulted a critical path consisting of the following activites, Roadbed Preparation, Ordinary Excavation, Selected Piles from Excavation Sources, Class A Aggregate Foundation Layer, Class B Aggregate Foundation Layer, Fc'15 Mpa Concrete, Prime Coat – Liquid Asphalt/Work Emulsion, and Mobilization 2,  and get a total duration of 98 working days, which is 22 days faster than the previous project plan duration of 120 calendar days. Keywords: Time Management, Scheduling, PDM, Project 2019