Claim Missing Document
Check
Articles

Found 1 Documents
Search

Pusat Pembangkit Listrik Hybrid dan Industri Penghasil Energi Alternatif yang Terbarukan Sebagai Bagian Dari Sumber Daya Alam Masyarakat di Desa Kemujan Karimun Jawa Wan Lubnayya Nabigha
Jurnal Poster Pirata Syandana Vol 7, No 01 (2026): PERIODE 162 (JUNI 2026)
Publisher : Architecture Department, Engineering Faculty, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The project redefines the conventional powerplant from a centralized and isolated industrial facility into a distributed coexistent energy network integrated with the island’s ecology and daily life. Responding to different environmental potentials across the island, solar, wind, and diesel backup systems are placed in context-driven locations where energy infrastructure also supports public, productive, and ecological activities. These decentralized modules are interconnected through a central hub that acts as a metabolic machine for monitoring, storage, and system integration, while the diesel generator gradually shifts into emergency-only infrastructure. Through this approach, the hybrid powerplant becomes not only a system for generating electricity, but an adaptive architectural landscape where energy, environment, and society coexist.