Sistem Perawatan Alat Overhead Crane Dengan Metode Reliability Centered Maintenance (RCM) II dan Age Replacement Ferdiansyah Wendyantoro; Indah Apriliana Sari Wulandari
Physical Sciences, Life Science and Engineering Vol. 3 No. 2 (2026): March
Publisher : Indonesian Journal Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47134/pslse.v3i2.695

Abstract

Equipment maintenance is very important to ensure that the equipment operates properly within a certain period of time. PT. XYZ, which is engaged in the shipping industry, uses a demag type overhead crane with a capacity of 5 tons in its production process. This study aims to evaluate the reliability level of overhead cranes in existing conditions by calculating the reliability value. In addition, this study also aims to determine the critical component replacement interval appropriately so that replacement is carried out before downtime occurs. The results of the study identified three critical components, namely Contactor, Photoelectric Sensor, and Motor Hoist, with MTTR values ​​of 3.65667 hours, 4.15333 hours, and 1.1546 hours, respectively. The application of the age replacement method showed an increase in reliability: Contactor 39%, Photoelectric Sensor 40%, and Motor Hoist 83%. The recommended component replacement interval is every 11 days to reduce downtime and increase operational efficiency.
Analysis of Barge Mounted Power Plant Production Process at PT PAL Indonesia: Analisis Proses Produksi Barge Mounted Power Plant di PT. PAL Indonesia Ferdiansyah Wendyantoro; Indah Apriliana Sari Wulandari
Indonesian Journal of Innovation Studies Vol. 25 No. 2 (2024): April
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/ijins.v25i2.2374

Abstract

General Background Floating power station construction requires highly structured manufacturing workflows to deliver clean energy infrastructure reliably. Specific Background Barge Mounted Power Plant (BMPP) fabrication in shipyards operates under job shop environments with complex assembly sequences and extended production cycles. Knowledge Gap Although workflow mapping tools clarify manufacturing stages, operational bottlenecks and supply chain disruptions during initial production phases of specialized barges remain insufficiently detailed in empirical literature. Aims This study analyzes the production process of the 150MW BMPP project at PT PAL Indonesia using operation process charts and flow diagrams to resolve operational constraints. Results Direct field observations reveal that unmaintained production facilities trigger power instabilities, inter-divisional distances extend material transfer duration, and raw steel import restrictions cause schedule misalignment. Novelty Integrating standardized process mapping with multi-factorial constraint analysis offers a practical diagnostic framework tailored specifically to barge-mounted power facility manufacturing. Implications Establishing preventative equipment maintenance, improving inter-departmental communication, and optimizing facility layout minimize process delays and strengthen delivery compliance in heavy shipyard engineering. Key Findings Highlights Operation process mapping identifies key structural stages in floating power plant construction. Facilities maintenance deficiencies and long inter-divisional distances extend total production time. Import policy restrictions create material delivery shifts that disturb baseline manufacturing schedules. Keywords: Barge Mounted Power Plant, Operation Process Chart, Process Flow Diagram, Production Bottleneck, Shipyard Manufacturing