Analisis Risiko Keterlambatan Proyek Tahap Pra Konstruksi (Studi Kasus Jembatan Bengkalis Riau) Yuli Rahman; Ari Sandhyavitri; Alex Kurniawandy
Prosiding Seminar Nasional Teknik Sipil UMS 2026: Prosiding Seminar Nasional Teknik Sipil UMS
Publisher : Universitas Muhammadiyah Surakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Tahap pra-konstruksi merupakan fase kritis yang sering menyebabkan keterlambatan pada proyek infrastruktur berskala besar. Penelitian ini bertujuan mengidentifikasi dan menganalisis risiko keterlambatan pada tahap pra-konstruksi Jembatan Bengkalis yang menghubungkan Pulau Bengkalis dengan daratan Sumatera. Metodologi yang digunakan adalah mixed-methods melalui survei kuesioner kepada 78 responden yang meliputi Pemerintah, Swasta, dan Ahli/Pakar/Akademisi/Masyarakat ahli untuk mendapatkan peringkat Relative Importance Index (RII) dan divalidasi melalui wawancara mendalam (In-Depth Interview) dengan pihak kementerian/lembaga terkait dan pakar kebijakan publik infrastruktur. Hasil penelitian mengidentifikasi 33 variabel risiko yang terbagi dalam 6 kelompok, dengan 17 variabel dikategorikan sebagai risiko dominan. Kelompok Risiko utama meliputi risiko ketersediaan dana, ketidakpastian politik/regulasi, kendala pembebasan lahan, dan kondisi diluar kendali (force majeure/unforeseen condition). Pendekatan mitigasi harus dilakukan secara terintegrasi atau tidak secara parsial. Penyusunan strategi mitigasi risiko secara terintegrasi (Integrated Risk Management) yang meliputi upaya penetapan kebijakan Proyek Strategis Nasional (PSN), regulasi pengadaan tanah (PP 19/2021 jo PP 39/2023), dan mekanisme penganggaran nasional.
ANALISIS RISIKO KETERLAMBATAN PROYEK TAHAP PRA KONSTRUKSI (STUDI KASUS JEMBATAN BENGKALIS RIAU) Yuli Rahman; Ari Sandhyavitri; Alex Kurniawandy
Racic : Rab Construction Research Vol. 11 No. 1 (2026): JUNI
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v11i1.7969

Abstract

The pre-construction stage is a critical phase that frequently causes delays in large-scale infrastructure projects. This study aims to identify and analyze the delay risks during the pre-construction stage of the Bengkalis Bridge, which connects Bengkalis Island to the mainland of Sumatra. The methodology employed is a mixed-methods approach, utilizing questionnaire surveys distributed to 78 respondents comprising government officials, private sector representatives, and experts/academics to determine the Relative Importance Index (RII) rankings. The quantitative data were subsequently validated through in-depth interviews with relevant ministries/agencies and infrastructure public policy experts. The findings identified 33 risk variables divided into 6 categories, with 17 variables classified as dominant risks. The primary risk groups encompass funding availability, political and regulatory uncertainties, land acquisition constraints, and uncontrollable events (force majeure/unforeseen conditions). Risk mitigation approaches must be executed comprehensively rather than partially. The formulation of an integrated risk management strategy includes efforts to designate the development as a National Strategic Project (PSN), implement land acquisition regulations (Government Regulation No. 19/2021 in conjunction with Government Regulation No. 39/2023), and optimize the national budgeting mechanism