Supplier Selection for Small and Medium Enterprises: An Integrated DEMATEL- ANP Approach for Decision Making Dutho Suh Utomo; Ridzky Zul Asdi; La Ode Ahmad Safar Tosungku
International Journal of Engineering, Science and Information Technology Vol 6, No 1 (2026)
Publisher : Malikussaleh University, Aceh, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52088/ijesty.v6i1.1783

Abstract

ABC Bakery, a small and medium enterprise (SME), relies heavily on high-quality raw materials to meet the growing demand of its local market. Given the importance of raw material quality in product outcomes, selecting the right supplier becomes a critical task. This research applies the DEMATEL and ANP methods to identify the most suitable supplier for ABC Bakery. Through DEMATEL, the relationships between various supplier selection criteria, including Price, Quality, Delivery, Flexibility, and Responsiveness, are analysed to understand how these factors interrelate. The ANP method is then used to perform pairwise comparisons of both the criteria and the suppliers. The results reveal that Price and Quality are the most influential factors in the supplier selection process, with Price having the greatest weight, followed by Quality. On the other hand, Delivery, Flexibility, and Responsiveness have relatively lower weights, indicating they play a less critical role than Price and Quality. Based on the ANP analysis, Supplier 1 emerges as the preferred supplier, with the highest weight of 0.44, followed by Supplier 2 (0.34) and Supplier 3 (0.22). This study demonstrates that using DEMATEL and ANP enables a more informed, structured supplier selection process, helping ABC Bakery make better procurement decisions aligned with its operational and quality goals.
Identification of Risks of Delays in the Construction of Jalan Animal Hospital Mochamad Gaharu Dida Devedo; Ardhan Ismail; Ridzky Zul Asdi; Chalsi Mala Sari; Kartika Tristanto; Muhammad Ibadurrahman Arrasyid Supriyanto
JURNAL MANAJEMEN RISIKO Vol. 6 No. 2 (2025): December
Publisher : Pasca Sarjana UKI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33541/mr.v6i2.7350

Abstract

Timely completion of hospital construction projects is crucial to support public health services, but delays are a common problem that has an impact on increased costs and delayed social benefits. This study aims to identify the risk factors for causing delays and analyze the level of significance in the case study of the construction of the Jalan Kehewanan Hospital in Tenggarong. This study uses a qualitative approach with primary data collected through semi-structured interviews with the implementing contractor. Data analysis is carried out by mapping identified risks into risk matrices based on likelihood and impact. The results of the study identified four main risk factors, namely (1) Design Changes, (2) High Rainfall, (3) Restrictions on Working Hours by Residents, and (4) Equipment Damage. The risk assessment showed that Design Change (value 15) and High Rainfall (value 12) were the two factors with the most significant High risk level, while the other two factors were at Medium levels. These findings imply that project management should prioritize mitigation strategies on aspects of internal design management and anticipation of external weather factors to ensure the smooth running of the project