p-Index From 2021 - 2026
0.408
P-Index
This Author published in this journals
All Journal Jurnal Logistica
Claim Missing Document
Check
Articles

Found 2 Documents
Search

OPTIMALISASI KESELAMATAN DAN KESEHATAN PADA LINGKUNGAN KERJA PRODUKSI PALLET KAYU DI CV QUARANTA JAYA ABADI MENGGUNAKAN ERGONOMI CHECKLIST Setyo Rini, Asih; Maulana, Andrey Imam; Agustin, Nur Sella; Rohmandi, Anisa Andisni; Ramadhan, Virgi
JURNAL LOGISTICA Vol. 4 No. 2 (2026): VOL 4.NO.2.JUNI 2026
Publisher : LPPM-ITEBA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62375/7gan1w11

Abstract

Perkembangan industri saat ini sangat signifikan. Industri di Indonesia menghadapi persaingan yang cukup ketat untuk dapat bertahan. Upaya dalam meningkatkan kualitas produk merupakan hal yang paling penting, hanya saja diperngaruhi oleh sumber daya manusia Hal ini industri wajib memperhatikan keselamatan dan kesehatan pada lingkungan kerja agar tidak terjadi risiko kecelakaan kerja akabiat proses produksi dari CV Quranta Jaya Abadi. Industri ini terletak di Kota Cilegon, dimana sistem yang digunakan yaitu make-to-order. Guna mengurangi pembiayaan, indutri ini meminimalisir dengan memperkerjakan pekerja harian. Hal ini, CV Quranta Jaya Abadi tidak memperhatikan lingkungan kerja terhadap aktivitas pekerja yang mengakibatkan kecelakaan kerja. Ergonomi dapat memainkan peran penting untuk optimalisasi keselamatan dalam jangka panjang. Ergonomi checklist merupakan sebuah metode yang terdiri dari 132 point pernyataan berstandar ILO yang terdiri dari 9 kriteria Berdasarkan pengolahan dan analisis data terdapat 69 point masuk dalam kategori “baik” dan 63 point masuk kedalam kategori “tidak ada”. Ada empat fakor yang harus dilakukan perbaikan segera mungkin diantaranya : penyimpanan bahan dan penanganan, keamanan mesin, pencahayaan, serta fasilitas umum.
PERANCANGAN ULANG FASILITAS PRODUKSI BERBASIS SYSTEMATIC LAYOUT PLANNING DAN BLOCPLAN PADA PT MUHAYYA CILEGON STEEL Abdulgani, Muhamad Fiqih; Sopyan, Sofhan; Ramadhan, Virgi; Mubaraq, Ibnu; Prabowo, Dimas Rakha; Meylandri , Raffi Trie; Maulana, Adriyan; Rini, Asih Setyo
JURNAL LOGISTICA Vol. 4 No. 2 (2026): VOL 4.NO.2.JUNI 2026
Publisher : LPPM-ITEBA

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62375/xw7hpv49

Abstract

Unplanned facility layout is the main cause of operational inefficiency at PT Muhayya Cilegon Steel, a steel plate processing manufacturer established in 2024 in Cilegon, Banten, Indonesia. Based on field observations conducted in March 2026, this company faces four fundamental problems: unverified location placement, 2.30% non-value-added activities, unstructured floor space calculation, and material backtracking caused by machines placed out of process sequence. This study applies the Systematic Layout Planning (SLP) approach in an integrated manner. The stages include Factor Rating and Transportation methods, Operation Process Chart (OPC), Flow Process Chart (FPC), Activity Relationship Chart (ARC) analysis, and layout redesign using BLOCPLAN-90 software. The results prove Cilegon as the optimal location with the highest Factor Rating score of 4.25. The Least Cost method generates a distribution cost of Rp585,000,000, representing 7.5% efficiency improvement compared to the North West Corner method. The total floor space requirement is 168.991 m². BLOCPLAN Layout 6 was selected as the best layout with an Adjacency Score of 0.82 and Product Movement of 387, successfully eliminating backtracking in the existing conditions and fulfilling all critical adjacency relationships defined in the ARC.