Claim Missing Document
Check
Articles

Found 2 Documents
Search

EVALUASI PENGENDALIAN PERSEDIAAN BAHAN BAKU MENGGUNAKAN METODE MIN MAX STOCK DAN ECONOMIC ORDER QUANTITY (EOQ) PADA PT XYZ Jaka Suryahusada; Tini Setiawati; Tombak Gapura Bhagya
SISTEMIK (Jurnal Nasional Ilmu Teknik) Vol 14 No 1 (2026): SISTEMIK : Jurnal Ilmiah Nasional Bidang Ilmu Teknik
Publisher : Universitas Teknologi Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53580/sistemik.v14i1.203

Abstract

PT XYZ merupakan perusahaan manufaktur yang bergerak di bidang alat kesehatan, khususnya produk IVD rapid test. Meningkatnya permintaan alat kesehatan di dalam negeri menyebabkan kebutuhan bahan baku menjadi fluktuatif, sehingga menimbulkan kondisi kelebihan maupun kekurangan persediaan di gudang. Hal ini menjadi tantangan dalam pengendalian persediaan bahan baku, terutama dalam menentukan tingkat ketersediaan yang sesuai dengan kebutuhan produksi. Penelitian ini bertujuan untuk menentukan tingkat buffer stock yang optimal dengan menggunakan metode Min Max Stock dan Economic Order Quantity (EOQ) guna meningkatkan efektivitas operasional serta efisiensi biaya. Penelitian ini menggunakan data historis persediaan, penerimaan, dan permintaan bahan baku pada periode Juli 2024 hingga Juni 2025. Data tersebut dianalisis untuk menentukan safety stock, reorder point, persediaan minimum dan maksimum, serta jumlah pemesanan yang optimal. Hasil dari kedua metode kemudian dibandingkan dengan kebijakan persediaan yang saat ini diterapkan oleh perusahaan. Hasil penelitian menunjukkan bahwa total biaya persediaan dengan kebijakan perusahaan saat ini sebesar Rp 11.500.329 per tahun. Dengan metode Min Max Stock, biaya tersebut dapat ditekan menjadi Rp 8.925.387 per tahun dengan efisiensi sekitar 22% serta frekuensi pemesanan yang relatif rendah. Sementara itu, metode EOQ menghasilkan total biaya terendah sebesar Rp 1.878.727 per tahun dengan efisiensi sekitar 84%, namun dengan frekuensi pemesanan yang lebih tinggi. Secara keseluruhan, kedua metode memberikan pengendalian persediaan yang lebih optimal dibandingkan kebijakan perusahaan saat ini. Metode Min Max Stock memberikan kestabilan persediaan, sedangkan metode Economic Order Quantity (EOQ) menawarkan potensi penghematan biaya yang lebih besar. Oleh karena itu, penelitian ini diharapkan dapat menjadi acuan dalam perbaikan kebijakan pengendalian persediaan bahan baku guna mencapai efisiensi dan efektivitas operasional yang lebih baik pada perusahaan.
Proposed Improvement of Finished Goods Warehouse Layout Using FSN Analysis and CBS Method at PT XYZ Arum Puspa Rini; Tombak Gapura Bhagya; Dini Yulianti
SAINTEKS : Jurnal Sain dan Teknik Vol. 8 No. 02 (2026): September
Publisher : Universitas Insan Cendekia Mandiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37577/sainteks.v8i02.1093

Abstract

PT XYZ is a company operating in the Fast Moving Consumer Goods (FMCG) industry that produces snack products. Based on observations, it was identified that the finished goods warehouse layout at PT XYZ is not yet optimally organized. This condition has resulted in several operational issues, such as increased travel distance of material handling and longer time required for order picking and preparation activities. These problems potentially reduce warehouse operational efficiency, and negatively impact the company’s distribution performance. This study aims to propose an improved finished goods warehouse layout at PT XYZ by implementing FSN (Fast Moving, Slow Moving, and Non Moving) analysis and the CBS (Class Based Storage) method. FSN analysis is applied to classify products according to their movement frequency, while the CBS method is used to arrange products based on their respective movement classes to create a more structured storage system. The data used in this study include product movement data, warehouse dimensions and layout, storage capacity requirements, material handling distances, and material handling times. The evaluation of the proposed warehouse layout shows an improvement in efficiency. In the existing layout, the total material handling distance is 14,333.40 meters, while after the implementation of the proposed layout becomes 13,520.10 meters, resulting in a reduction of 813,30 meters. In addition, the material handling time in the existing layout is 71,836.76 seconds, and after the implementation of the proposed layout it becomes 30,297.89 seconds, resulting in a reduction of 41,538.87 seconds. These results indicate that the application of FSN analysis combined with CBS method can improve operational efficiency of the finished goods warehouse at PT XYZ. The proposed layout is expected to serve as an alternative solution for improving warehouse management, particularly in reducing material handling distance and time, as well as supporting smoother warehouse operations.