Claim Missing Document
Check
Articles

Found 2 Documents
Search

HYBRID ESP-NOW AND MQTT-BASED MONITORING AND EARLY WARNING SYSTEM FOR RRI MANADO TRANSMITTER ROOM Evert Paul Mangimbelat; Melyssa Christy Pasiowan; Febrita Bungkaes; Maksy Sendiang; Anthoinete Pemina Yece Waroh
Jurnal Riset Informatika Vol. 8 No. 3 (2026): Juni 2026
Publisher : Kresnamedia Publisher

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34288/jri.v8i3.518

Abstract

The transmitter room of LPP RRI Manado is a vital operational center housing high-power electronic equipment susceptible to damage from temperature fluctuations, humidity instability, abnormal machine noise, and fire hazards. Currently, no automated monitoring system has been implemented to continuously observe environmental conditions in real-time, resulting in delayed detection of technical anomalies. This research aims to design and implement an IoT-based monitoring and early warning system for the transmitter room environment. The novelty of this system lies in its hybrid ESP-NOW and MQTT communication architecture, specifically tailored for the multi-parameter environmental monitoring demands of broadcast transmitter facilities, where neither protocol alone could fulfill both low-latency local transmission and real-time remote dashboard access simultaneously. The system employs ESP-NOW for wireless inter-building data transmission and MQTT for real-time integration to a web-based monitoring dashboard. Environmental parameters were selected based on the primary physical risk factors in high-power electronic environments: temperature and humidity (DHT22) to detect thermal and moisture anomalies, sound intensity (GY-MAX4466) to identify mechanical failure indicators, and smoke concentration (MQ-2) as an early fire hazard indicator. The research method used is quantitative with an experimental approach, whereby numerical data were collected from sensor readings and communication performance tests, then analyzed to evaluate system accuracy, latency, and packet loss. The expected outcome is a system that enables centralized monitoring for TMB technicians and delivers early warning notifications when abnormal conditions are detected, ensuring operational reliability and continuity of LPP RRI Manado broadcast services.
Feasibility Study of Single-Phase Electrical Installation for Obtaining an Operational Feasibility Certificate (SLO) Gloria Yulita Tampi; Marson James Budiman; Anthoinete Pemina Yece Waroh
Journal of Social Research Vol. 5 No. 9 (2026): Journal of Social Research
Publisher : International Journal Labs (AHU-0028405-AH.01.14 Tahun 2022)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/josr.v5i9.3344

Abstract

The Operational Feasibility Certificate (Sertifikat Laik Operasi/SLO) is a mandatory document required by Indonesian regulations before a new or renovated electrical installation can be connected to the PLN distribution network. This research presents a feasibility assessment of a single-phase (1-phase, 220V/50Hz) electrical installation against the requirements of PUIL 2011 (Persyaratan Umum Instalasi Listrik) and applicable Ministerial Regulations. The assessment covered three aspects: load calculation adequacy, wiring and cable sizing compliance, and protective device and grounding system performance. A total of 50 inspection items were evaluated. Results indicate that 68% of items were fully compliant, while 22% showed minor non-conformances and 10% showed major non-conformances requiring rectification prior to SLO issuance. The dominant non-conformance categories were inadequate grounding resistance and undersized branch circuit conductors. Corrective actions are proposed to bring the installation into full compliance. This study provides a systematic approach for pre-inspection feasibility assessment applicable to similar residential and small commercial single-phase installations.