Analysis of the Use of a Combination of Soil Embankment and Lightweight Material (Foam Mortar) as an Alternative to Slab on Pile Construction Case Study: Rengat-Pekanbaru Toll Road Construction Project Section Lingkar Pekanbaru-Junction Pekanbaru Sta 19 Wahyu Maya Dewatama; Noor Endah Mochtar; Indrasurya B. Mochtar; Mahar Muliawan
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 1 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22443

Abstract

The soil condition on the Rengat - Pekanbaru Toll Road Sta 193+ 025 - Sta 193+400 which passes through oil palm plantations, swamp areas, and the Siak River, consists of a compressible layer as thick as 7.0 meters. To handle the problem, a 375 m long slab on pile construction was planned with a construction time of 3 months. However, the design was costly; therefore, alternative planning using ordinary piles and a combination of ordinary and lightweight piles was required. The rate of settlement at the study site did not meet the requirements for t = 1 year (< 2cm/year) or t = 10 years (< 10cm/10 years). Therefore, it is necessary to install PVDs with an installation distance of 1.0 meter and a length of 7.0 m. The stability analysis showed that as the percentage of foam mortar increases, the SF value increases. The bearing capacity of the subgrade was increased by installing geotextiles; the number of geotextile layers required at each site varied depending on the height of the embankment and the combination of soil + foam mortar, the thicker the foam mortar, the less geotextile layers were required. The number of reinforcing piles was also planned according to the thickness of the soil and foam mortar variations; the thicker the foam mortar, the less piles were required. In terms of cost, the slab on pile replacement structures that provide savings are geotextile-reinforced soil backfill and a combination of soil backfill with 25% thick foam mortar. Each of these replacement structures provides savings of Rp 40 billion (without foam mortar) and Rp 12.1 billion (with 25% thick foam mortar). For the implementation time, both methods require the same completion time as slab on pile which is 3.5 months.
Handling Selection of Settlement and Embankment Stability Issues Based on Variations in Embankment Height and Soft Subgrade Thickness Case Study: Pekanbaru Junction - Pekanbaru Bypass Sta. 176+775 - Sta. 176+975 Pandu Hermawan; Noor Endah Mochtar; Indrasurya B. Mochtar; Mahar Muliawan
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 2 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22471

Abstract

Trans Sumatra Toll Road (JTTS) is one of the most important infrastructure projects in Indonesia. One of the main sections of JTTS is the Rengat - Pekanbaru Toll Road, Pekanbaru Ring Section (Pekanbaru Junction - Pekanbaru Bypass). Existing conditions at Sta 176+775 - Sta 176+975 are dominated by oil palm plantations with soft soil layers in the form of organic soil to a depth of 1.0 meter; the layer below is clay with medium to stiff consistency. The existing treatment plan is preloading embankment with PVD and 1,0 m deep subgrade replacement. In this study, alternative planning calculations were carried out with variations of subgrade replacement up to 0.5 m and 1,0 m thickness. The study results show that the most cost-optimal treatment design is the treatment design without replacement with geotextile reinforcement. The thicker the subgrade replacement, the smaller the compression and rate of settlement. In terms of embankment reinforcement, the thicker the subgrade replacement, the less reinforcement is required. The thickness of subgrade replacement also affects the cost of the work, the thicker the subgrade replacement, the higher the cost of the work.
Analysis of Temporary Preloading for Bridge Approach Embankment to Eliminate Secondary Compression Case Study: Probolinggo – Banyuwangi Toll Road Construction Project Section 3 STA 40+550 Muhammad Rizal Permadi; Indrasurya B. Mochtar; Noor Endah Mochtar; Reza Kazhimi
Journal of Infrastructure & Facility Asset Management Vol 7 (2025): Special Issue 3 : Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i0.22482

Abstract

Probolinggo - Banyuwangi Toll Road is part of the National Strategic Project, has a length of 172 km which is divided into 7 sections. One of the challenges faced is soft soil, where information is obtained in section 3 precisely STA 40 + 550 there is soft soil, which has low bearing capacity and high compressibility. The depth of the soft soil itself reaches 10 meters, with the plan to build in the approach bridge area which has a 10 meter high embankment. Considering the high embankment, based on previous studies, it is estimated that the amount of primary and secondary compression generated is quite large. This study analyzes primary, and secondary compression in bridge approach embankments built on soft soil, focusing on eliminating secondary compression using the preloading method, while the primary compression time is accelerated using Prefabricated Vertical Drains (PVD). Primary consolidation results in a 1.35-meter settlement, and secondary settlements vary over 20 years. From the analysis, it is found that the annual rate of secondary settlements decreases after year 10, so it is considered that the year 10 settlements are eliminated. To eliminate these settlements at year 10 of the operational period, the required embankment height increases by up to 13.60 meters of granular backfill, preloading of 4.49 t/m2 is equivalent to 2.26 m, and the height of the embankment to be demolished is 1.85 m.
Design of Toll Road Embankment With Secondary Compression Mitigation After Pvd Installation and Solutions For The Probolinggo – Banyuwangi Toll Road Construction Project Package 2 Sta 16+300 – Sta 16+700 Septya Kukuh Aryandi; Indrasurya B. Mochtar; Noor Endah; Abdjad Agung Artanto
Journal of Infrastructure & Facility Asset Management Vol 7 No 1 (2025): Journal of Infrastructure & Facility Asset Management
Publisher : Departemen Teknik Sipil, Institut Teknologi Sepuluh Nopember

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.12962/jifam.v7i1.22418

Abstract

In the Probolinggo-Banyuwangi Toll Road construction project package 2, there are several areas where the subgrade consists of soft soil, one of which is at STA 16+300 – STA 16+700. In this section, soft soil with a depth of up to 12 meters is found. The primary issue in constructing on soft soil is settlement. Settlement occurs due to the high compressibility of clay, where consolidation takes an extended period. This condition may pose problems during both the construction and operational phases of the toll road due to ongoing settlement. Consolidation consists of primary consolidation and secondary compression. Primary consolidation occurs first, followed by secondary compression. The method used in this study to accelerate primary consolidation and secondary compression involves prefabricated vertical drains (PVD) combined with preloading. The study was conducted at STA 16+300 – STA 16+700, where compressible soil with a depth of 12 meters is present, but the embankment height varies. For this study, embankment heights of 4m, 6m, and 8m were analyzed. Once the magnitude of primary consolidation and secondary compression from year 2 to year 15 was determined, the results were evaluated based on the Binamarga standards. Specifically, the settlement requirements are as follows: during the 2nd and 3rd years, settlement must be less than 2 cm; during the 2nd and 12th years, it must be less than 10 cm with a construction period of 2 years and maintenance of 1 year; and during the 5th and 6th years, it must be less than 2 cm; while during the 5th and 15th years, it must be less than 10 cm with a construction period of 3 years and maintenance of 2 years. From these results, the required embankment heights for which preloading is necessary were identified. Slope stability analysis for the embankment was also conducted to determine whether the stability meets the required standards. If the stability requirements were not met, reinforcement using geotextile material was applied. Therefore, for each embankment variation, the necessary amount of geotextile was determined. The results of this study show that the settlement requirements of Binamarga were met during the 2nd and 3rd years, the 5th and 6th years, and the 5th and 15th years, but not during the 2nd and 12th years, indicating the need for preloading. Regarding embankment stability, the factor of safety for all embankment variations was found to be below the required standard, necessitating the use of geotextile reinforcement. Based on these results, this study serves as input for selecting the appropriate method and ensuring a faster implementation period for the toll road construction.