Alexander Christian Tibarrena
Universitas Diponegoro

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

KAJIAN PERBANDINGAN DESAIN PERENCANAAN DAN PELAKSANAAN PEKERJAAN TIMBUNAN BENDUNGAN TIU SUNTUK, KAB. SUMBAWA BARAT Alexander Christian Tibarrena; Wikan Kresno Sadono
Racic : Rab Construction Research Vol. 10 No. 1 (2025): JUNI 2025
Publisher : LPPM Universitas Abdurrab

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36341/racic.v10i1.5369

Abstract

During the construction of Tiu Suntuk Dam, the existing design could not be directly applied to construction implementation. This was due to limitations in planning scale related to space, cost, and time, necessitating a design review of several design parameters throughout the dam construction. The data required for this method includes design and embankment construction data, covering laboratory test results of material samples, dam geometry data, and quarry and borrow area locations. This review utilizes these three data sets to generate a comparison between the design from the planning stage and the actual conditions in the field, encompassing location characteristics, physical and mechanical properties of materials, and available embankment volume.