Analisis Risk Barriers and Mitigation Strategies for High-Rise Building Delays in Surabaya Using Fuzzy Logic Ninda Qurmaulia Dhani; Michella Beatrix; Mochamad Firmansyah
G-Tech: Jurnal Teknologi Terapan Vol 10 No 2 (2026): G-Tech, Vol. 10 No. 2 April 2026
Publisher : Universitas Islam Raden Rahmat, Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70609/g-tech.v10i2.9154

Abstract

Delays in high-rise building projects negatively affect cost, quality, and schedule performance. This study aims to identify the main risk barriers and formulate appropriate mitigation strategies using a fuzzy logic approach. Data were collected from 80 valid respondents occupying strategic and operational roles in construction projects in Surabaya. Linguistic assessments (Low, Medium, High) were converted into Triangular Fuzzy Numbers and defuzzified using the centroid method to obtain crisp severity scores. The results indicate that cost overruns due to design revisions by the project owner (D4) represent the most critical risk barrier, with a defuzzification score of 3.717 (high category), followed by ineffective project control (E1) with a score of 3.483 (upper-medium category). The severity gap between D4 and the overall average of other indicators (≈3.30) shows a dominant external risk influence of approximately 0.40 points on the 1–5 fuzzy scale. Mitigation preferences reveal that risk avoidance is the dominant strategy for D4 (34 respondents), emphasizing design finalization before construction, while risk reduction is dominant for E1 (37 respondents), highlighting intensive monitoring and routine progress evaluation. Practically, prioritizing risks above the 3.50 threshold provides a structured basis for focusing managerial attention on the most critical delay drivers. Theoretically, this study demonstrates that fuzzy logic enhances decision accuracy by transforming subjective expert judgments into measurable and ranked risk severity values for high-rise construction projects.
Identifikasi Penyimpangan Penyelenggaraan Pengadaan Konstruksi : Pengabdian Erdin Fahlefi; Mochamad Firmansyah
Jurnal Pengabdian Masyarakat dan Riset Pendidikan Vol. 4 No. 3 (2026): Jurnal Pengabdian Masyarakat dan Riset Pendidikan Volume 4 Nomor 3 (Januari 202
Publisher : Lembaga Penelitian dan Pengabdian Masyarakat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jerkin.v4i3.4668

Abstract

Pengadaan jasa konstruksi memiliki peran krusial dalam mendukung pembangunan nasional, sehingga menuntut pelaksanaan yang transparan, akuntabel, dan efisien. Namun, praktik penyimpangan, khususnya persekongkolan tender atau kolusi, masih menjadi masalah serius yang merusak prinsip persaingan sehat. Urgensi penelitian ini adalah untuk memetakan dan memahami bentuk-bentuk penyimpangan tersebut secara empiris, sebagai landasan perbaikan sistem. Oleh karena itu, penelitian ini bertujuan mengidentifikasi dan mengelompokkan jenis-jenis penyimpangan hukum dalam pengadaan jasa konstruksi di Indonesia. Metode yang digunakan adalah analisis isi (content analysis) terhadap 40 putusan Komisi Pengawas Persaingan Usaha (KPPU) Republik Indonesia yang telah berkekuatan hukum tetap (inkrah). Hasil penelitian menunjukkan bahwa terdapat 12 jenis penyimpangan hukum pengadaan konstruksi yang secara konsisten ditemukan dan diputuskan bersalah oleh KPPU, mayoritas terkait praktik persekongkolan vertikal dan horizontal. Kesimpulan dari studi ini adalah pemetaan tipologi penyimpangan yang komprehensif ini dapat menjadi referensi penting bagi Pemerintah dan pemangku kepentingan dalam memperkuat pengawasan dan membangun sistem pengadaan yang lebih adil dan kompetitif di masa depan.