Quality Control of Civil Engineering Laboratory Testing Systems Based On The Development of Standard Operating Procedures (SOPs) and Standardized Testing Forms Ely Mulyati; Muhammad Alvin
GANDRUNG: Jurnal Pengabdian Kepada Masyarakat Vol. 7 No. 2 (2026): GANDRUNG: Jurnal Pengabdian Kepada Masyarakat
Publisher : Fakultas Olahraga dan Kesehatan, Universitas PGRI Banyuwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36526/gandrung.v7i2.8619

Abstract

The quality of laboratory testing services is a critical factor in supporting educational, research, and community service activities in higher education institutions. However, the Civil Engineering Laboratory faced challenges related to the absence of standardized testing procedures and uniform documentation systems, which could affect the consistency and traceability of testing activities. This community service program aimed to strengthen the laboratory quality control system through the development and implementation of Standard Operating Procedures (SOPs) and standardized testing forms. The assistance methods included field observation, needs assessment, document review, mentoring, consultation, and participatory development of quality documents. The activities focused on identifying existing testing practices, designing SOPs for laboratory operations, and developing standardized forms for recording and documenting testing results. The results showed that the laboratory successfully adopted a set of SOPs and standardized testing forms that support consistent testing procedures, improve documentation quality, and enhance data traceability. In addition, laboratory personnel gained a better understanding of quality management principles and standardized documentation practices. The implementation of these documents contributed to improving operational efficiency, reducing administrative errors, and supporting continuous quality improvement within the Civil Engineering Laboratory.
Analysis Of Supply Chain Management Effectiveness in Improving Project Time and Cost Performance Through Digitalism Supply Chain Management Ely Mulyati; Muhammad Wahyu Desriandi
Civilla : Jurnal Teknik Sipil Universitas Islam Lamongan Vol 11 No 2 (2026): SEPTEMBER
Publisher : Program Studi Teknik Sipil, Fakultas Teknik, Universitas Islam Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30736/cvl.v11i2.1743

Abstract

The increasing complexity of oil and gas construction projects requires effective Supply Chain Management (SCM) supported by digital integration to achieve efficient schedule and cost performance. This study aims to analyze the effectiveness of SCM and Digital Supply Chain Management (DSCM) in the Demineralized Facility Construction Project at Company ABC. A quantitative approach was employed using purposive sampling involving 58 respondents engaged in supply chain, procurement, engineering, logistics, project management, and contractor activities. Primary data were collected through a structured five-point Likert-scale questionnaire and analyzed using IBM SPSS Statistics 31 through validity, reliability, multicollinearity, descriptive, and multiple linear regression analyses. The independent variables comprised SCM practices and DSCM implementation through Smart-GEP, Enterprise Resource Planning (ERP), and IOG E-Commerce, while the dependent variable was project performance, measured through schedule and cost performance. The regression model was statistically significant (F = 107.953, p < 0.001) and explained 79.7% of the variation in project performance (R² = 0.797). DSCM showed a significant positive effect on project performance, demonstrating that integrated digital platforms strengthen procurement transparency, information integration, real-time monitoring, and project coordination. These findings emphasize the strategic contribution of DSCM to schedule and cost performance in oil and gas construction projects.