RISK ANALYSIS IN THE IMPLEMENTATION OF THE GUNUNG PAMATON – GUNUNG COKLAT ROAD CONSTRUCTION PROJECT, BANJAR REGENCY, SOUTH KALIMANTAN Muhammad Imam Qolyubi; Candra Yuliana; Aulia Isramaulana
CERUCUK Vol 10, No 6 (2026): CERUCUK VOL. 10 NO. 6 JUNE 2026
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/crc.v10i6.19338

Abstract

Road infrastructure construction projects in mountainous areas have high complexity and risk that can hinder the achievement of project objectives. This study aims to analyze the risks in the Pamaton Mountain – Brown Mountain Road Construction Project, Banjar Regency, South Kalimantan. The method used for this risk analysis is quantitative research with purposive sampling of 17 respondents. The data is analyzed using the Severity Index (SI) calculation. The risk level is then mapped using the Probability and Impact Matrix to determine the dominant risk category based on the risk acceptance scale. The results of the study identified 21 valid risk variables, consisting of 15 medium-category risks and 6 high-category risks. As a mitigation measure, risk responses were carried out, including: risk reduction in 16 variables, risk transfer in 3 variables, and risk avoidance in 2 variables.Keywords: risk analysis, severity index, probability and impact matrix, dominant risk variables.
COMPARISON OF SCHEDULING USING CPM AND PDM METHODS IN THE RECONSTRUCTION PROJECT OF JALAN BUMI MAKMUR – PULAU SARI, BUMI MAKMUR DISTRICT, TANAH LAUT REGENCY, SOUTH KALIMANTAN Rihadatul Isi Ramda; Candra Yuliana
CERUCUK Vol 10, No 3 (2026): CERUCUK VOL. 10 NO. 3 MARCH 2026
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/crc.v10i3.18919

Abstract

Construction projects in their implementation require the success of management because they are very important for the project. For a smooth work process, effective management is needed to manage project scheduling from start to finish. Therefore, in the Bumi Makmur – Pulau Sari Road Reconstruction project, scheduling will be made using diagrams with PDM, CPM, and modified CPM.The Precedence Diagram Method (PDM) scheduling method in the construction industry is scheduling that can be done with several dependencies where there is  an overlapping relationship. While the Crictical Path Method (CPM) method, which is the dependence of finish to start work, then in this study will be modified, namely a work item is divided into several segments of work activities.The results obtained from the research conducted on the scheduling of this project for the PDM method of the project can be carried out in 136 days. Meanwhile, the CPM method of the project can be done in 225 days and for the CPM method of project modification it can be done in 145 days. The three methods have critical paths, in PDM all activities have a critical path and only have 1 critical path, while in the CPM method without modification there is 1 critical path, and in modified CPM there are 2 critical paths. Kata kunci: Crictical Path Method (CPM), Precedence Diagram Method (PDM)