p-Index From 2021 - 2026
0.408
P-Index
This Author published in this journals
All Journal Multicience
Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : multicience

RISK MANAGEMENT IN HEAVY EQUIPMENT PERFORMANCE EVALUATION IN JAKARTA LRT PROJECT PHASE 1B Faizal Addin Achmad; Bilhan Gamaliel Hartanto
INTERNATIONAL JOURNAL OF MULTI SCIENCE Vol. 6 No. 01 (2026): INTERNATIONAL JOURNAL OF MULTISCIENCE - JANUARY-APRIL 2026
Publisher : CV KULTURA DIGITAL MEDIA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Infrastructure projects, especially in the development of mass transportation systems such as light rail transit (LRT), rely heavily on the role of heavy equipment. The use of these machines is a decisive factor in the successful construction of a special mode of rail transport, in which the production capacity of the machine plays a major role in influencing the progress of the project. Therefore, an analysis of the capacity of production volumes is necessary. This study aims to evaluate the production volume capacity of The Jakarta LRT project Phase 1b, including analysis of the capacity of cranes, excavators, dump trucks, compactors, and other heavy equipment. The volumetric method is applied to calculate the volume capacity and productivity of heavy vehicles. The results of the analysis showed that the calculated volume and productivity of the machine have met the target according to the established schedule.
RISK MANAGEMENT ANALYSIS IN THE OPERATIONAL PERFORMANCE EVALUATION OF HEAVY EQUIPMENT DURING THE JAKARTA LRT PHASE 1A PROJECT EXECUTION Faizal Addin Achmad; Bilhan Gamaliel Hartanto
INTERNATIONAL JOURNAL OF MULTI SCIENCE Vol. 6 No. 02 (2026): INTERNATIONAL JOURNAL OF MULTISCIENCE - MAY-AUGUST 2026
Publisher : CV KULTURA DIGITAL MEDIA

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction of mass transportation infrastructure, such as the Light Rail Transit (LRT), relies heavily on the performance of heavy equipment as a key factor in project success. Heavy equipment production capacity is a crucial aspect in determining whether work targets are met according to the implementation schedule. This study aims to evaluate production volume capacity for the Jakarta LRT Phase 1A project by analyzing the performance of heavy equipment, including cranes, excavators, dump trucks, compactors, and other supporting machinery. A volumetric method was employed to calculate production capacity and equipment productivity. The analysis results indicate that the achieved heavy equipment productivity met the required work volumes in accordance with the project's planned targets and schedule.