Found 3 Documents
Search

Analisis Kesediaan dan Kemampuan Membayar terhadap Persepsi Kewajaran Tarif LRT Jabodebek pada Jam Sibuk dan Non-Sibuk (Studi Kasus: Stasiun Harjamukti) Sehati Sumaryani; Pio Ranap Tua Naibaho
Jurnal Talenta Sipil Vol 9, No 2 (2026): Agustus
Publisher : Universitas Batanghari Jambi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33087/talentasipil.v9i2.1425

Abstract

High mobility in the Greater Jakarta (Jabodetabek) area, which is dominated by private vehicle use, has led to congestion and transportation inefficiency. The LRT Jabodebek was introduced as a mass transit alternative; however, its passenger occupancy rate remains suboptimal. This study aims to analyze the influence of Willingness to Pay (WTP) and Ability to Pay (ATP) on fare fairness perception during peak and off-peak hours, as well as to identify the dominant variable. A quantitative method with descriptive and verificative approaches was employed through a Likert-scale questionnaire distributed to users at Harjamukti Station. The data were analyzed using multiple linear regression. The results indicate that both WTP and ATP have a positive and significant effect on fare fairness perception. During peak hours, WTP is the dominant variable, whereas ATP is more dominant during off-peak hours. A fare of IDR 20,000 during peak hours tends to be rejected, while a fare of IDR 10,000 during off-peak hours is more acceptable. These findings suggest the need for a time-based fare policy to improve affordability and user acceptance.
Manajemen Percepatan Waktu Pelaksanaan Proyek Untuk Meningkatkan Efisiensi Waktu dan Biaya Pada Pembangunan Gedung Rawat Inap 8 Lantai RSUD Provinsi Banten Sugiharto Sugiharto; Pio Ranap Tua Naibaho
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 14 No 2 (2026): Jurnal Konstruksi dan Infrastruktur Vol 14 No.2 : October 2026
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v14i2.12251

Abstract

This study evaluates the implementation of project time acceleration management in the construction of the 8-story Inpatient Building of Banten Provincial General Hospital. The project duration was reduced from 14 months to 7 effective months due to funding delays and the urgent need to improve healthcare services. The study employed a quantitative descriptive case study using project document review, cost budget plan (RAB) evaluation, concrete strength conversion analysis, schedule evaluation, interviews, and field observations. The project involved the construction of an eight-story hospital building supported by 344 bored piles (0.80 m diameter, 20 m depth), concrete with a design strength of 25 MPa, and a slump value of 18 ± 2 cm to maintain construction quality during the accelerated schedule. The results indicate that the acceleration strategy through resource optimization, additional working hours, and rescheduling successfully reduced the implementation period by 50% while maintaining construction quality and improving project implementation efficiency through lower indirect costs and faster project cash flow. The findings demonstrate that data-based project time management can effectively support schedule control in public building construction without compromising technical quality.
Pengembangan Teknologi CPHMA–Semi Kaku Untuk Perkerasan Jalan Lalu Lintas Berat di Daerah Terpencil Fransiskus Sitorus; Pio Ranap Tua Naibaho; Madi Hermadi
Jurnal Konstruksi dan Infrastruktur : Teknik Sipil dan Perencanaan Vol 14 No 2 (2026): Jurnal Konstruksi dan Infrastruktur Vol 14 No.2 : October 2026
Publisher : Civil Engineering Department, Faculty of Engineering, Universitas Swadaya Gunung Jati

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33603/jki.v14i2.12252

Abstract

In many remote areas, roads are subjected to heavy traffic, such as access routes to mining sites, agricultural production centers, and ports. However, constructing conventional hot-mix asphalt pavements in these regions is often constrained by the absence of Asphalt Mixing Plants (AMPs). This study presents the development of Cold Paving Hot Mix Asbuton–Semi-Rigid (CPHMA–Semi-Rigid), a cold-laid Asbuton mixture designed with approximately 20% air voids that are subsequently filled with cement mortar to form a dense semi-rigid pavement layer. Marshall testing was conducted at a testing temperature of 60 °C after curing periods of 4, 7, and 14 days. The Marshall characteristics, including stability, flow, volumetric properties (VIM, VMA, and VFB), and residual stability, were evaluated and compared with the requirements for modified hot-mix asphalt specified in the General Specifications for Highways (Bina Marga 2018 Revision 2). The results showed that Marshall stability increased from 1,487 kg after 4 days to 1,570 kg after 7 days and 2,318 kg after 14 days, all exceeding the minimum specification of 1,000 kg. The mixture also exhibited satisfactory volumetric characteristics and acceptable flow values, although residual Marshall stability remained below the specified requirement. These findings indicate that CPHMA–Semi-Rigid has the potential to be applied as a pavement alternative for heavy-traffic roads in remote areas based on its Marshall performance. In addition, the dense mortar-filled structure is expected to reduce water infiltration, although permeability performance was not directly evaluated in this study.