EVALUASI SALURAN DRAINASE DAN LAJU RESAPAN AIR TANAH DI JALAN VILAKU INDAH, KELURAHAN SURAU GADANG, KOTA PADANG Rino Fajar Ramadhan; Totoh Andayono
Ensiklopedia of Journal Vol 8, No 2 (2026): Vol. 8 No. 2 Edisi 2 Januari 2026
Publisher : Lembaga Penelitian dan Penerbitan Hasil Penelitian Ensiklopedia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33559/eoj.v8i2.3734

Abstract

Waterlogging problems in urban areas are generally caused by the inability of drainage systems to accommodate runoff discharge and are also influenced by soil infiltration characteristics. Jalan Vilaku Indah, Surau Gadang Subdistrict, Padang City, is one of the areas that frequently experiences inundation during rainfall events. This study aims to evaluate the performance of the existing drainage system and to analyze the soil infiltration rate in controlling waterlogging. The methods employed include hydrological analysis to determine design rainfall and design flood discharge, hydraulic analysis using EPA SWMM 5.2 software, and soil infiltration rate testing using the double ring infiltrometer method at nine test locations. The results of the hydrological analysis indicate that the 50-year return period design flood discharge (Q50) is 0.067 m³/s. The hydraulic simulation results using EPA SWMM show that in several channel segments, the water level rises beyond the storage capacity, with the simulated peak discharge reaching approximately 0.097 m³/s, thereby causing overflow and inundation on the roadway. The infiltration test results indicate that the final infiltration capacity (Fc) ranges from 48 mm/h to 192 mm/h, with an average value of 101.33 mm/h, which is classified as a fast infiltration class. These findings indicate that the waterlogging problems at the study site are caused by the limited capacity of the existing drainage system and changes in land use.Keywords: urban drainage, design flood discharge, infiltration rate, EPA SWMM.
Penerapan Metode Hazop dalam Identifikasi Bahaya dan Pengendalian Risiko K3 pada Proyek LRT Jakarta Fase 1B Najwa Putri Indra; Ari Syaiful Rahman Arifin; Fitra Rifwan; Totoh Andayono
Jurnal Penelitian Dan Pengkajian Ilmiah Eksakta Vol 5 No 1 (2026): Jurnal Hasi Penelitian Dan Pengkajian Ilmiah Eksakta - JPPIE
Publisher : LPPM Universitas Dharma Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/jppie.v5i1.2513

Abstract

Penerapan Metode Hazop dalam Identifikasi Bahaya dan Pengendalian Risiko K3 pada Proyek LRT Jakarta Fase 1B Najwa Putri Indra; Ari Syaiful Rahman Arifin; Fitra Rifwan; Totoh Andayono
Jurnal Penelitian Dan Pengkajian Ilmiah Eksakta Vol. 5 No. 1 (2026): Januari
Publisher : LPPM Universitas Dharma Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/jppie.v5i1.424

Abstract

LRT (Integrated Rail Transit) is a public transportation system developed by PT. Kereta Api Indonesia (KAI) to facilitate mobility for residents of Greater Jakarta (Jabodetabek). The objectives of this study are: 1) identifying high-risk construction projects, 2) applying the HAZOP method to identify hazards and deviations in work processes, 3) assessing risk levels based on likelihood and severity parameters, and 4) providing risk control recommendations based on the HAZOP analysis results. This research is a descriptive analytical study with a qualitative-quantitative approach, conducted on the Jakarta LRT Phase 1B Project, Velodrome–Manggarai Segment, implemented in January 2026. Data collection involved field observations, interviews, questionnaires, and documentation. The results indicate: 1) Identification of High-Risk Work: High-risk construction work in the LRT Phase 1B project includes the use of heavy equipment (jack hammers), concrete casting, girder lifting, electrical installation, and welding processes. 2) The application of the HAZOP method is effective in identifying potential hazards and deviations in various work processes. 3) Risk assessment based on likelihood and severity indicates the greatest risks are in girder lifting and concrete casting. 4) Risk control through technical measures (e.g., low-vibration work methods, strict supervision, use of PPE), administrative measures (SOPs, training), and physical protection (electrical protection, barricades) is essential to reduce occupational risks.