Claim Missing Document
Check
Articles

Found 1 Documents
Search

Peningkatan Jalan Desa Air Lang Kecamatan Sindang Dataran Kabupaten Rejang Lebong Tahun 2025 Wahyu Darmawan; Rezi Munizar
Journal of Science, Technology, and Innovation Vol 2 No 1 (2026): : August: Inventa: Journal of Science, Technology, and Innovation
Publisher : CV SCRIPTA INTELEKTUAL MANDIRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.65310/t81k3f51

Abstract

Road infrastructure plays an important role in supporting community mobility, agricultural product distribution, and regional economic growth. The condition of Air Lang Village Road, Sindang Dataran District, Rejang Lebong Regency, consisted of a Lapen (Penetration Macadam) pavement that had deteriorated, requiring reconstruction using a flexible pavement structure. This study aimed to describe the stages of road reconstruction implementation and to calculate the work volumes based on the design dimensions. A quantitative descriptive method was employed using data obtained from field observations, engineering drawings, technical documents, and the 2018 General Specifications for Highways (Bina Marga). The reconstructed road section is 4,450 m long, with work volumes of 4,272.00 m³ for Selected Embankment, 3,137.25 m³ for Aggregate Base Class B, 3,070.50 m³ for Aggregate Base Class A, 1,201.50 m³ for Asphalt Concrete Binder Course (AC-BC), and 801.00 m³ for Asphalt Concrete Wearing Course (AC-WC). The results indicate that implementing the construction in accordance with technical specifications produced a stronger pavement structure, extended the service life of the road, and improved user comfort, safety, and transportation service quality.