Claim Missing Document
Check
Articles

Found 2 Documents
Search

Evaluation of Drainage Channel Capacity on Rela–Sutomo Road, Medan City, Indonesia Melvi Maulita Napitupulu; Ridho Azahar; Wisnu Prayogo; Fikryah Atikah Pane; Sarra Rahmadani; Rizky Simanjuntak; Ahmad Zulfikar
Journal of Infrastructure and Civil Engineering Vol. 6 No. 2 (2026)
Publisher : Program Studi Teknik Sipil Sekolah Tinggi Teknologi Pekanbaru

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35583/jice.v6i2.192

Abstract

This study evaluated the capacity of the drainage system along Rela–Sutomo Road, Medan, to accommodate rainfall runoff and domestic wastewater. Rapid urban development and population growth have increased impervious surface coverage, surface runoff, and domestic wastewater generation, potentially exceeding the conveyance capacity of the existing drainage channels. This study aimed to determine whether the existing drainage system could accommodate the combined design discharge. The analysis included population projection using the least-squares method, estimation of domestic wastewater discharge, rainfall frequency analysis using the selected probability distribution for a 10-year return period, rainfall intensity estimation using the Mononobe method, runoff calculation using the rational method, and channel capacity calculation using Manning’s formula. Sediment depths and channel dimensions were directly measured across 10 drainage segments. The results showed that the design runoff discharge for the selected 10-year return period reached 24.46 m³/s, whereas the existing channel capacity was only 1.31 m³/s. Sediment accumulation reduced the effective cross-sectional area and decreased the channel capacity by up to 30%. Consequently, the combined inflow substantially exceeded the available channel capacity, indicating critical hydraulic overload and a high risk of flooding and surface inundation. The existing drainage system is therefore inadequate and requires channel normalization, periodic sediment removal, and hydraulic capacity improvement
Analysing The Causes of Management and Production Delays in The Implementation of Construction Project Work Putri Lynna Luthan; Nathanael Sitanggang; Syahreza Alvan; Wisnu Prayogo
Journal of Applied Engineering and Technological Science (JAETS) Vol. 5 No. 2 (2024): Journal of Applied Engineering and Technological Science (JAETS)
Publisher : Yayasan Riset dan Pengembangan Intelektual (YRPI)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37385/jaets.v5i2.1994

Abstract

This study aims to analyse the causes of delays in the implementation of construction projects caused by management (owners/consultants) and production (contractors). The research sample consists of 56 respondents who are directly involved in the implementation of construction projects (owners, consultants, contractors, field supervisors, and estimators). The quantitative data analysis technique used was descriptive analysis technique, while the qualitative data obtained by interviewing 5 construction project experts was analysed by qualitative descriptive method. To analyse the causes of delays in project implementation, an analysis technique using the Relative Importance Index (RII) formula was used with a reference value of RII> 0.710. The results showed that 1) the average RII on management factors was 0.895> 0.710. This means that management factors (owner/consultant) can cause delays in the implementation of construction projects; 2) the average RII on production factors is 0.917> 0.710. This means that production factors (contractors) can cause delays in the implementation of construction projects. This means that production factors (contractors) can cause delays in the implementation of construction projects. This research is directly useful for construction service providers and contributes to the development of Project / Construction Management science.