I Nyoman Dita Pahang Putra
Pembangunan Nasional “Veteran” of University

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Comparative Analysis of Aluminum Formwork and Conventional Formwork on the Success of the Structural Work Quality Yehezkiel Rivaldo; I Nyoman Dita Pahang Putra
Nusantara Journal of Multidisciplinary Science Vol. 1 No. 10 (2024): NJMS - Mei 2024
Publisher : PT. Inovasi Teknologi Komputer

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Formwork innovations in the world of construction continue to develop, one of which is aluminum formwork. It was found that there were differences in the quality of work on aluminum and conventional formwork structures, so it was necessary to carry out an analysis regarding this matter. The method used is to analyze the results of questionnaires and expert interviews. The analysis carried out aims to determine the results of work on aluminum and conventional formwork structures on the success of structural work and the differences using a multiple linear regression model. The results of the research show that the influence of the results of aluminum and conventional formwork structures on the level of success of the quality of structural work on the Kediri Regency Stadium construction project can be identified through the regression equation Y = 3.946 + 0.564 X1 + 0.392 X2 + 0.155 with an Adjusted R Square value of 0.949. This means that the more aluminum formwork structural work results, the more successful the quality of the structural work will be. Apart from that, there is a difference in the quality of structural work between aluminum and conventional formwork on the Kediri Regency Stadium construction project with an average difference in acceptance of 5.08%. Based on parameters, the quality of work on aluminum formwork structures is superior to the quality of work on conventional formwork structures.
Work Accident Risk Analysis Using Hazard Analysis and Operability Study Method Hidayatul Ulumiya; I Nyoman Dita Pahang Putra
Nusantara Journal of Multidisciplinary Science Vol. 1 No. 10 (2024): NJMS - Mei 2024
Publisher : PT. Inovasi Teknologi Komputer

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

One of the construction developments in Indonesia is the Kediri Regency Stadium construction project. In every construction project, it is very important to implement Occupational Safety and Health making it a primary concern. This is to anticipate negative impacts, such as increasing absenteeism rates, decreasing productivity, increasing medical costs, as well as a form of controlling all risks of work accidents in the work environment. This impact causes losses for both workers and contractor companies. Therefore, identification, assessment and analysis must be carried out to be able to control the risk of work accidents. The aim of this research is to identify risk factors for work accidents, assess the risk of work accidents, and control risks in the Kediri Regency Stadium construction project. The research method used is the Hazard Analysis and Operability Study (HAZOP) method. The results of this research were 45 risk factors, 29 of which were valid, and the results obtained were 2 extreme risks, 3 high risks, 17 mederate risks and 7 low risks. Apart from that, according to the risk control hierarchy, there are 3 types of risk control that can be applied in this research.