Power transformers are one of the main equipment in substations that play an important role in maintaining the continuity of electric power distribution. One of the problems that often occur in substation equipment is the emergence of hot spots due to increased contact resistance on electrical connections. If not immediately addressed, this condition can cause a decrease in equipment reliability to power system disruption. This study aims to analyze the hotspot condition on the Primary Bushing Clamp of Power Transformer #2 (TD#2) in Lubuk Alung Substation using the thermovision method and evaluate the effect of transformer loading on the increase in hotspot temperature. The research method is carried out through thermovision inspection, equipment temperature measurement, transformer loading analysis, and temperature evaluation before and after repair actions. The measurement results show that under normal operating conditions a hotspot is detected on the Primary Bushing Clamp of TD#2 phase T with a temperature of 60.5°C, while the reference temperature is 35.2°C so that a temperature difference of 25.3°C is obtained. When Power Transformer #1 (TD#1) was not operating, the load current of TD#2 increased from 282 A to 461 A or by 63.48%, which caused the hotspot temperature to increase to 97.9°C. After load reduction through system maneuvers and corrective actions at the connection point, the hotspot temperature was successfully reduced to 23.6°C or decreased by 74.3°C (75.89%). The results showed that increasing transformer loading affected the temperature increase at the hotspot point. In addition, thermovision was proven effective as a predictive maintenance method for early detection of abnormal conditions, evaluating the severity of hotspots, and supporting maintenance decision making to improve the reliability of the electric power system at the substation.