Claim Missing Document
Check
Articles

Found 2 Documents
Search

PROGRAM ALOKASI DANA DESA (ADD) DALAM PENGEMBANGAN EKONOMI DI KECAMATAN MARAWOLA KABUPATEN SIGI Nasar, M.
Katalogis Vol 4, No 12 (2016)
Publisher : Katalogis

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (190.618 KB)

Abstract

This research intends to find out and analyze: 1) planning process, action, eveluation, and accountability of the village fund at Marawola district , Sigi regency; and 2) village allocation funds program in economic development at Marawola district , Sigi regency. This was a qualitative descriptive research with 15 informants selected through purposive sampling. The data were analyzed through data reduction, data display, and conclusion. The results show that: 1) planning process, action, and the village fund evaluation at Tinggede, Bomba, and Binangga villages run well based on the participatory development concept  characterized by participatory, responsive, and transparency principles. An accountability of village allocation funds technically and administratively were effective, however in financial administration was not effective; and 2) the village fund management at the three villages in hal fulfilled the basic needs.
Studi Kelayakan Teknis dan Ekonomi Pembangkit Listrik Tenaga Surya Rooftop di Hotel Rayz Universitas Muhammadiyah Malang Effendy, Machmud; Nasar, M.; Abduh, Moh.; Suwignyo; Ad, Azhar; Sm., Lintang; R.A., Fariz
Techné : Jurnal Ilmiah Elektroteknika Vol. 23 No. 1 (2024)
Publisher : Fakultas Teknik Elektronika dan Komputer Universitas Kristen Satya Wacana

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31358/techne.v23i1.455

Abstract

Pembangkit listrik tenaga surya (PLTS) merupakan salah satu pembangkit energi listrik terbarukan yang ramah lingkungan. Penelitian ini bertujuan untuk memanfaatkan PLTS sebagai sumber energi listrik dan sekaligus mendapatkan analisis kelayakan teknis dan ekonomi PLTS atap on grid di Hotel Rayz Universitas Muhammadiyah Malang (UMM). Analisa kelayakan PLTS ini memanfaatkan atas atap seluas 267,2 m2. Kapasitas instalasi maksimal yang direkomendasikan sebesar 37,4 kWp. Energi yang dihasilkan sistem PLTS pada kelistrikan Hotel Rayz-UMM dalam setahun sebesar 55.341 kWh. Nilai kelayakan teknis ditinjau dari efektifitas pembangkit (ACEGE) memperoleh sebesar 10,8%, sedangkan nilai performance ratio (PR) dihasilkan sebesar 60,1%. Hasil analisis ekonomi menunjukkan bahwa nilai net present value (NPV) negative sebesar -Rp. 149.199.260,7, nilai benefit cost ratio (BCR) sebesar 1,8 dan nilai payback period (PP) sebesar 13,65. Dari hasil analisa teknik dan ekonomi tersebut, PLTS atap di Hotel Rayz-UMM belum layak dibangun.