Claim Missing Document
Check
Articles

Found 2 Documents
Search

Penentuan Tingkat Produksi Optimal dengan Metode Fuzzy Mamdani Berdasarkan Kapasitas Mesin pada CV Wangun Mandiri Fajar Wisnu Nugraha; Iikh Nurazizah; Iwan Maulana; Shifni Mafaza
Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika Vol. 2 No. 6 (2024): November : Publikasi Ilmu Keteknikan Industri, Teknik Elektro dan Informatika
Publisher : Asosiasi Riset Ilmu Teknik Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61132/jupiter.v2i6.614

Abstract

CV Wangun Mandiri is a manufacturing company that produces tapioca flour. In order to achieve maximum profit targets and smooth production activities, the company is faced with problems relating to the amount of tapioca flour products due to the uncertainty of its demand that tends to fluctuate and the imbalance of machine capacity. Therefore, it is required to plan the amount of production using the forecasting and fuzzy inference system approach as an effective method to determine the optimal production level. This research relies on the availability of datasets to determine the appropriate forecasting method and fuzzy method. The Fuzzy Mamdani method concludes that CV Wangun Mandiri can produce 82.9 tons to maximize existing demand and the capacity of its machines.
Facility Layout Redesign to Improve Material Handling Efficiency in Colored Stone Production at PT Tatalogam Lestari Dessy Damayanthy; Fajar Wisnu Nugraha
INOVATOR Vol 15 No 2 (2026): SEPTEMBER
Publisher : prodima@fe.uika-bogor.ac.id

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/inovator.v15i2.24984

Abstract

Facility layout efficiency and material handling are important for improving manufacturing performance. An inappropriate layout can increase material travel distance, movement frequency, and Material Handling Cost (MHC). This study aims to redesign the facility layout for the colored stone production process at PT Tatalogam Lestari and evaluate its impact o?n material travel distance and MHC. A quantitative approach was applied using field observations, interviews, facility measurements, and material movement data. The redesign employed the Activity Relationship Chart (ARC), Total Closeness Rating (TCR), and Blocplan methods, while material travel distance was calculated using the rectilinear distance approach. The results show that the proposed layout reduced material travel distance from 30,019.18 to 27,057.64 meters/day, a reduction of 2,961.54 meters/day or 9.87%. MHC decreased from IDR 1,395,846.49 to IDR 1,155,276.42/day, generating savings of IDR 240,570.07/day or 17.23%. The proposed layout improves material handling efficiency and operational cost performance.