Analisis Kinerja Biaya dan Waktu dengan Metode Earned Value pada Tahap Awal Pelaksanaan Proyek Pembangunan RSUD Bolaang Mongondow Selatan Claudia Syallomitha Suwu; Trio Pendekar Lonan; Syanne Pangemanan
Jurnal Penelitian Rumpun Ilmu Teknik Vol. 5 No. 2 (2026): Jurnal Penelitian Rumpun Ilmu Teknik
Publisher : Lembaga Pengembangan Kinerja Dosen

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55606/juprit.v5i2.7074

Abstract

This study applies the earned value method to the early implementation stage of the integrated design and build package for the construction of the Bolaang Mongondow Selatan Regional General Hospital building, valued at IDR 128.64 billion with a contract duration of 287 calendar days. The data consist of the bill of quantities, the master schedule, and the weekly progress reports of weeks one through five. Because the contractor did not release its cost records, the actual cost of work performed was approximated from labour, equipment, and material quantities recorded in the daily reports, multiplied by the unit prices stated in the project cost documents. At the end of week five the cumulative physical progress reached 2.0297 percent against a planned 1.4273 percent, producing a positive schedule variance of IDR 774,938,314 and a schedule performance index of 1.422. The estimated direct cost incurred amounted to IDR 364,565,960. The resulting cost performance index of 7.162 cannot be read as cost efficiency because the estimated cost covers fewer components than the earned value does. The study also finds that zero planned weight across two holiday weeks inflates the schedule performance index.