Ogbennaya Jane Frances Chinwe
Chemical Engineering Department, Dr B.U. Nzeribe State Polytechnic, Imo State Nigeria

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Job Hazard Analysis as a Practical Tool for Process Safety Management: Methodology, Application and Performance Evaluation in High-Risk Industries Nwaneri Theodore U; Nnadikwe Johnson; Onwukwu Cajetan N; Iheme Chigozie; Akuchie J. Chukwuma; Ogbennaya Jane Frances Chinwe
Jurnal Teknik Indonesia Vol. 5 No. 02 (2026): Jurnal Teknik Indonesia (JU-TI) 2026
Publisher : SEAN Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Process Hazard Analysis is central to Process Safety Management, yet system techniques like HAZOP are resource-intensive for task-level risks. Job Hazard Analysis (JHA) offers a practical alternative but lacks standardized evaluation. To develop, apply and evaluate a standardized JHA methodology for high-risk industries. A mixed-method study was conducted on 12 high-risk jobs involving 68 workers. A six-step JHA procedure based on OSHA 3071 was applied over 6 months. Performance was measured via risk reduction, JHA quality scores, TRIR and compliance rates. Data were analyzed with SPSS v26. 187 hazards were identified from 94 steps. High-risk hazards reduced by 83.8% after hierarchy-based controls. Mean JHA quality was 17.2/20. TRIR decreased from 4.85 to 1.92 (60.4% reduction, p=0.007). Permit compliance improved from 61% to 94%. Standardized JHA is an effective, low-resource tool for PSM, complementing HAZOP at task level.
Modeling Corrosion Progression and Optimizing Predictive Maintenance Strategies for Marine Vessel Hulls: An Engineering Case Study of Coastal Operations in Nigeria Nwaneri Theodore U; Nnadikwe Johnson; Onwukwu Cajetan N; Iheme Chigozie; Akuchie J. Chukwuma; Ogbennaya Jane Frances Chinwe
Jurnal Teknik Indonesia Vol. 5 No. 02 (2026): Jurnal Teknik Indonesia (JU-TI) 2026
Publisher : SEAN Institute

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Hull structural degradation due to marine corrosion remains a leading cause of unplanned dry-docking, cost overrun and safety risk for vessels operating in the aggressive tropical waters of West Africa. Conventional corrective maintenance often results in emergency steel renewal at excessive cost.  This study develops and validates a predictive maintenance framework for hull steel renewal based on corrosion rate modelling, non-destructive testing (NDT) mapping and lifecycle cost optimization for operation in Nigerian coastal waters. AH36 hull steel (15 mm nominal thickness) was modelled using a uniform corrosion rate of 550 μm/year derived from tropical immersion data, supplemented by pitting analysis with Pitting Factor 3.5. Ultrasonic thickness gauging on a 500 mm grid was simulated for a 4,400 m² wetted hull area. Corrective renewal at critical loss (4,350 μm, 71% remaining thickness) was compared with a two-stage predictive strategy (interventions at 5.0 and 7.5 years, 20% thickness-loss trigger). Critical thickness was intercepted at t = 7.91 years under corrective strategy, requiring 414.4 tonnes effective steel renewal (530 standard plates) at ₦1.512 billion and 45 days downtime. The predictive strategy reduced steel renewal by 35-40%, cost to ₦1.20 billion (20.6% saving) and downtime to 28 days. Predictive corrosion modelling integrated with NDT enables timely, cost-effective hull renewal and is recommended for fleet operators in tropical marine environments.