Perencanaan Risiko Keterlambatan Proyek Energi Baru Terbarukan dalam RUPTL 2025 - 2034 dengan Pendekatan PERT dan Simulasi Monte Carlo di PT XYZ Windhy Wicaksana; Mia Juliana; I Made Dwi Budiana Penindra
JURNAL RISET DAN APLIKASI TEKNIK INDUSTRI Vol. 4 No. 02 (2026): Volume 04, Issue 02 Agustus 2026
Publisher : Study Program of Industrial Engineering, Udayana University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24843/JRATI.2026.v04.i03

Abstract

Pembangunan pembangkit Energi Baru Terbarukan (EBT) dalam Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2025–2034 memiliki peran penting dalam mendukung transisi energi nasional. Namun, pelaksanaan proyek EBT masih menghadapi risiko keterlambatan yang dapat memengaruhi pencapaian target penambahan kapasitas pembangkit. Penelitian ini bertujuan untuk memodelkan risiko keterlambatan proyek EBT secara kuantitatif serta menunjukkan pemanfaatan hasil pemodelan sebagai dasar pertimbangan pengelolaan risiko di PT XYZ. Metode yang digunakan adalah Simulasi Monte Carlo dengan pendekatan distribusi Beta-PERT, berdasarkan data historis deviasi milestone proyek EBT tahun 2024 sebagai baseline. Parameter distribusi ditentukan dari nilai minimum, nilai paling mungkin, dan nilai maksimum keterlambatan, kemudian dilakukan simulasi sebanyak 10.000 iterasi. Hasil simulasi menunjukkan adanya variasi risiko keterlambatan yang signifikan, dengan nilai P50 sebesar 65 hari, P90 sebesar 107 hari, dan P95 sebesar 118 hari. Temuan ini menunjukkan bahwa meskipun sebagian proyek memiliki keterlambatan ringan atau tepat waktu, secara probabilistik tetap terdapat potensi keterlambatan yang cukup besar. Simpulan penelitian ini adalah bahwa Simulasi Monte Carlo dengan distribusi Beta-PERT mampu memberikan gambaran risiko keterlambatan yang lebih realistis dan dapat digunakan sebagai dasar pertimbangan dalam perencanaan jadwal proyek EBT di PT XYZ.
Soft Time-Window Constraints in Crystal-Ice Distribution: A Cheapest-Insertion VRPTW Case Study with Non-Refrigerated Vehicles Rayyan Riansyah; Bryan Estavan Imanuel Sitanggang; Mia Juliana
Sinergi International Journal of Logistics Vol. 4 No. 3 (2026): August 2026
Publisher : Yayasan Sinergi Kawula Muda

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.61194/sijl.v4i3.1106

Abstract

Perishable product distribution requires efficient route planning because delivery duration, route sequence, and transportation conditions directly affect product quality, service reliability, and operational performance. This study evaluates hard and penalty-based soft time-window routing for crystal-ice distribution in a small-scale enterprise distribution system comprising one depot, 60 scheduled customers, and two non-refrigerated vehicles. A quantitative computational case-study approach was applied using the Vehicle Routing Problem with Time Windows (VRPTW) and the Cheapest Insertion Heuristic (CIH). Soft time-window performance was evaluated using lateness penalties of λ = 0.1, 0.5, 1, 2, and 5 km/min. The hard time-window solution produced a fleet distance of 86.87 km and zero lateness. At λ = 0.1, the soft model reduced the fleet distance to 85.29 km but generated 8.95 minutes of total lateness across two customers. Increasing the penalty to λ = 0.5 eliminated all lateness and produced the same 86.87-km route as the hard model. Compared with the observed company baseline, the selected zero-lateness route reduced fleet distance from 99.84 to 86.87 km (12.99%) and route exposure duration from approximately 1,200 to 1,043.59 minutes (13.03%). Model-estimated product loss decreased from an observed baseline of 580 kg to 507.95 kg, corresponding to an estimated reduction of 72.05 kg (12.42%). These findings show that soft time-window penalties can reveal the trade-off between marginal distance savings and service punctuality.