Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISIS PENGARUH PENERAPAN (SMK3) TERHADAP PRODUKTIVITAS PEKERJA PADA PROYEK PEMBANGUNAN RUMAH SAKIT PUSAT OTAK NASIONAL. Azizah Ainu Rahmah; Afrizal Nursin
Jurnal Poli-Teknologi Vol. 25 No. 1 (2026)
Publisher : Politeknik Negeri Jakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32722/pt.v25i1.7044

Abstract

Construction is a sector with a high risk of accidents, often caused by unsafe behavior and dangerous conditions on project sites. The implementation of the Construction Safety Management System (SMKK) which is regulated by Minister of PUPR Regulation No. 10 of 2021, includes five elements of safety, security, health and sustainability. The research aims to identify the influence of implementation factors (SMKK) on the productivity of national brain center hospital project workers; (1) examine the current level of productivity of workers at the National Brain Center Hospital Construction Project; (2) analyze the influence of the Construction Safety Management System (SMKK) factors on the productivity of National Brain Center Hospital Project workers (3). This research examines the current level of productivity and analyzes the influence of SMKK on pile cap casting work. The methods used include qualitative and quantitative approaches through field observations and analysis of primary and secondary data from the project. The results show that factors such as material lists, safety commitments, work instructions, timeliness, and safety and security management, significantly influence productivity. SPSS analysis reveals that SMKK has a positive effect of 93.1% on productivity, with implementation helping to increase productivity and achieve zero fatalities.