Claim Missing Document
Check
Articles

Found 1 Documents
Search

Analysis of Heavy Equipment Vendor Selection Based on Sustainability Using The Analytical Hierarchy Process Method Sara Septiana Aruan; Sugiyono Madelan Ibrahim
Enrichment: Journal of Multidisciplinary Research and Development Vol. 4 No. 6 (2026): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v4i6.767

Abstract

The construction sector is one of the major contributors to Indonesia’s Gross Domestic Product (GDP), accounting for 9.83% in 2025, with heavy equipment playing a critical role in supporting infrastructure, road, and bridge projects. However, many construction companies, including PT Indotech Karya Mandiri (IKM), continue to select heavy equipment vendors primarily on the basis of the lowest price and personal relationships, without applying structured sustainability-oriented criteria. This practice creates risks related to quality nonconformity, mobilization delays, and safety noncompliance, which may adversely affect project productivity, cost efficiency, and sustainability. This study aimed to develop a priority-weighted heavy equipment vendor selection system using the Analytical Hierarchy Process (AHP) within a quantitative case study design. Data were collected through questionnaires and interviews with nine expert respondents, including project managers, subcontractors, and procurement team members, who were selected through purposive sampling based on expert judgment. The evaluation criteria comprised price, quality, service, and delivery, which were further divided into subcriteria and applied to three vendor alternatives. Data were analyzed using Expert Choice 11 software, with a consistency ratio (CR) threshold of ? 0.10. The results showed that delivery had the highest priority weight (0.445), followed by price (0.242), quality (0.198), and service (0.115). The highest-weighted subcriteria were equipment mobilization timeliness (0.466) and technical support/emergency response (0.381). Vendor A was identified as the preferred alternative, with a global priority weight of 0.466 (46.6%), followed by Vendor B (0.337) and Vendor C (0.197). These findings indicate that PT IKM should prioritize timely equipment mobilization and service responsiveness, incorporate sustainability considerations more explicitly into vendor evaluation, and adopt AHP as a more objective, transparent, and replicable decision-making method for future procurement processes.