Productivity Analysis in the Production Process of Commercial Line at PT. XYZ with Time Study Method and Fishbone Diagram Approach.: Analisis Produktivitas pada Proses Produksi Line Commercial di PT. XYZ dengan Metode Time Study Dan Pendekatan Fishbone Diagram. Moch. Galih Rizki Aminullah; Hana Catur Wahyuni
Indonesian Journal of Innovation Studies Vol. 27 No. 2 (2026): April
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/ijins.v27i2.2416

Abstract

General Background Optimizing work productivity is essential for manufacturing companies to maintain operational efficiency and market competitiveness. Specific Background In commercial production lines at PT. XYZ, fluctuations in cycle times and instances of overtime indicate underlying operational inefficiencies that require immediate identification. Knowledge Gap However, detailed empirical evaluations combining systematic cycle time measurements with root-cause analysis for specific heat exchanger commercial assemblies remain limited. Aims This study aims to analyze and evaluate the productivity level on the commercial line at PT. XYZ using time study measurements and fishbone diagram approaches to propose targeted operational improvements. Results The results demonstrate that commercial line productivity is suboptimal, characterized by frequent overtime and uneven operator allocation across stations, alongside specific constraints such as part quality issues, excessive oil consumption, and material supply shortages. Novelty This work provides a comprehensive diagnostic framework by mapping stopwatch time study indices directly against multi-factor fishbone categorizations for manufacturing bottlenecks. Implications The findings offer actionable strategies for industrial management to balance workloads, optimize operator counts, and mitigate production delays. Key Findings Highlights Commercial line productivity is suboptimal, showing frequent overtime and uneven operator distribution across manufacturing stations. Stopwatch time study calculations reveal significant workflow variances, with many workstations experiencing low productivity indexes and time overruns. Root-cause evaluations identify material quality defects, excessive oil consumption, and supply shortages as primary contributors to production delays. Keywords Productivity, Time Study, Fishbone Diagram
Analysis of quality control of PE pipe installation in gas network project at PT. XYZ: Analisis pengendalian kualitas pemasangan pipa PE pada proyek jaringan gas di PT. XYZ Ali Adi; Hana Catur Wahyuni
Procedia of Engineering and Life Science Vol. 10 No. 1 (2026): Proceedings of the 9th Seminar Nasional Sains 2026
Publisher : Universitas Muhammadiyah Sidoarjo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.21070/pels.v10i1.2968

Abstract

General Background Quality control implementation within gas distribution pipeline installation ensures operational reliability and structural integrity. Specific Background Polyethylene pipes are widely chosen for gas distribution projects due to flexibility, corrosion resistance, and jointing efficiency, requiring rigorous pressure testing prior to commissioning. Knowledge Gap Although pneumatic testing using pressurized air is commonly conducted to verify joint strength, empirical evaluations documenting step-up holding pressure stability and operational quality control protocols during field assembly remain limited. Aims This study evaluates quality control procedures during 180 mm polyethylene pipe installation in a gas network project at PT. XYZ using the pneumatic test method. Results Qualitative and quantitative case evaluation shows that holding test pressures at 43.551 psig (July) and 42.451 psig (August) for 4.5 hours maintained absolute stability without pressure drops or joint leaks. Novelty Systematic step-up, holding, and step-down pressure monitoring validates butt fusion and electrofusion integrity under pressurized air conditions in distribution pipelines. Implications Adhering to standardized pneumatic test protocols guarantees network safety, minimizes minor joint imperfections, and prevents long-term gas leakage. Key Findings Highlights Pneumatic Testing Validates Joint Integrity At Maximum Holding Pressures Exceeding 42 Psig Zero Pressure Drop Recorded Over Four Hour Holding Period Confirms Leak Absence Standardized Step Up And Step Down Protocols Ensure Pipeline Structural Stability Keywords Polyethylene Pipe, Quality Control, Pneumatic Test, Gas Distribution, Joint Integrity