Analysis of Production Process Waste Using Lean Manufacturing Approach at PT. XYZ Nur Muafiatul Farichah; Wiwin Widiasih
Matrik : Jurnal Manajemen dan Teknik Industri Produksi Vol. 27 No. 1 (2026)
Publisher : Prodi Teknik Industri Universitas Muhammadiyah Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30587/matrik.v27i1.11742

Abstract

Waste in the production process can reduce efficiency and hinder the smooth flow of production. This research aims to identify types of waste, analyze the causes of waste, and provide improvement suggestions using the Lean Manufacturing approach in the production process at PT XYZ. The methods used include Value Stream Mapping (VSM) to map the production flow, Process Activity Mapping (PAM) to identify value-added (VA), non-value-added (NVA), and necessary non-value-added (NNVA) activities, as well as Root Cause Analysis (RCA) to determine the root causes of waste. The research results show that the dominant wastes are waiting, inventory, and motion. Improvement proposals were made thru Future State Mapping (FSM) with layout improvements, preventive maintenance, and work in process (WIP) control. The improvement results show a reduction in processing time, a decrease in transfer distance, and an increase in production flow efficiency.
OEE and FMEA Analysis of Cutting Sewing Machine at PT. XYZ Latisha Aura Ilmanzani; Wiwin Widiasih
Matrik : Jurnal Manajemen dan Teknik Industri Produksi Vol. 27 No. 1 (2026)
Publisher : Prodi Teknik Industri Universitas Muhammadiyah Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30587/matrik.v27i1.11743

Abstract

This study examines the effectiveness of Cutting Sewing Machine 2 at PT. XYZ, a plastic sack manufacturer, over July-December 2025. The machine recorded the highest downtime among similar units at 7,670 minutes. A Total Productive Maintenance (TPM) approach was applied through Overall Equipment Effectiveness (OEE) calculation, Six Big Losses analysis, and Failure Mode and Effect Analysis (FMEA) to identify critical components. The average OEE was 63.82%, below the 85% world-class standard set by the Japan Institute of Plant Maintenance (JIPM). Reduce speed losses dominated at 91.32% of total time losses. Of 19 evaluated components, 9 were classified as critical under the 80% cumulative Pareto threshold; the looper recorded the highest Risk Priority Number (RPN = 256), followed by the hook (224) and needle bar (196). Recommendations include implementing Autonomous Maintenance and Planned Maintenance pillars to raise performance efficiency to 95% and quality rate to 99%, achieving the world-class OEE standard.