p-Index From 2021 - 2026
0.408
P-Index
This Author published in this journals
All Journal Astonjadro
Claim Missing Document
Check
Articles

Found 2 Documents
Search

Dominant Factors Affecting the Efficiency of Construction Service Provider Selection Through E-Catalogue Teguh Wiyono; Anik Ratnaningsih; Indra Nurtjahjaningtyas
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22213

Abstract

Procurement of Government Goods/Services (PBJP) through E-Purchasing in Electronic Catalogs has become a strategic function to achieve efficiency, which is driven by the latest regulations. The use of E-Catalogs in Indonesia shows a significant increasing trend, especially in the Construction Services sector. There is still a gap between the expectation of optimal efficiency and the reality of implementation in the field due to technical complexity and integrity issues. This study aims to identify the most dominant factors influencing the efficiency of choosing Construction E-Catalog providers. The three main problem formulations are: (1) Identifying factors that affect the efficiency of the e-purchasing construction service provider selection process in the E-Catalog; (2) Determining the most dominant factors that affect the efficiency of supplier selection. This study adopts  a Mixed Methods Sequential Exploratory approach, starting with a qualitative phase (expert interviews) for factor exploration, followed by a quantitative phase (a survey of 98  national stakeholder respondents) for perception measurement and dominance analysis. Quantitative analysis uses classical assumption tests and multiple linear regression analysis. This research makes a significant contribution by (1) specifically analyzing efficiency in the Construction Services sector in the context of the E-Catalog Version 6 system; and (2) conducting a comprehensive identification and ranking of dominant factors from a multi-stakeholder perspective (PPK, Procurement Officer, Auditor). Simultaneously, the seven independent factors (Technology, Organization, Environment, Policy/Regulation, User/HR, Provider, and External/Context) have a significant effect on Provider Selection Efficiency (F Sig.=0.000 Test). Partial tests found the presence of Functional Multicollinearity. Standardized Beta Coefficient analysis showed that Environmental Factors (Competitive Market and Market Clarity) were the most dominant factors (Beta=0.273). There was a critical anomaly in the Organizational Factor, which was perceived to be very good (Mean=4.0986) but had the weakest and negative influence (Beta=-0.028). Increasing the efficiency of Construction E-Catalog is a systemic phenomenon, where transformational success relies heavily on strengthening the quality and competitiveness of the provider market (Environmental Factors) that are the input of the platform, exceeding the internal factors of the organization. Strategic recommendations must be focused on strengthening market inputs and harmonizing APBD/APBN regulations.
Integrated Risk Analysis of Manager Competency in Bali Construction Delays Melinda Dwi Rahmawati; Anik Ratnaningsih
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22322

Abstract

Construction project delays remain a critical challenge in Indonesia's construction industry, particularly in Bali's strategic tourism development areas. This qualitative study identifies and categorizes risk factors related to project manager (PM) quality and recruitment systems that contribute to construction project delays in Bali through systematic literature review and expert validation. Using rigorous content analysis methodology, this research analyzed 25 national and international peer-reviewed journal articles published between 2020-2025, complemented by PMBOK® Guide Seventh Edition standards, and validated findings through consultation with five senior construction practitioners in Bali. Through thematic content analysis and constant comparative method, the study identifies 16 Risk Events and 38 Risk Agents categorized into eight dimensions: PM competency, recruitment & HRM, planning & system, coordination & communication, resource management, vendor & supply chain, organizational culture, and external factors. Results reveal that PM competency-related factors constitute the most critical risk agents, with weak communication ability appearing in 76% of literature, weak planning ability in 72%, and insufficient leadership in 68%. Recruitment system deficiencies, including lack of competency-based selection criteria (24%), unstructured recruitment processes (20%), and inadequate training programs (32%), significantly contribute to PM performance gaps. The integration of these findings with Bali's unique construction context—including high-end tourism project specifications, international client expectations, complex cultural regulations, and seasonal workforce dynamics—provides comprehensive understanding of project delay root causes. This study offers the first systematic qualitative framework linking PM quality and recruitment systems to construction delays in Bali's tourism construction context, contributing theoretical understanding grounded in international literature and validated through local expert perspectives.