Muhamad Adi Sukur
a:1:{s:5:"en_US";s:37:"Universitas Nahdlatul Ulama Gorontalo";}

Published : 1 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 1 Documents
Search

ANALISIS KINERJA SISTEM TURBIN PEMBANGKIT LISTRIKMINI HIDRO (PLTM) TALUDA’A KABUPATEN BONE BOLANGO GORONTALO Muhamad Adi Sukur; Yunita Djamalu
Journal of Energy and Mechanical Engineering Vol. 1 No. 1 (2023): Journal of Energy and Mechanical Engineering (Desember)
Publisher : Fakultas Sains dan Teknologi - Universitas Nahdlatul Ulama Gorontalo

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.62299/jeme.vi.3

Abstract

The federal government is relentlessly pushing the shift away from fossil fuels and toward renewable energy sources. The Mini Hydro Power Plant (PLTM) is an example of a renewable energy source. The kinetic energy of falling water is harnessed using the PLTM process. The greater the height of a waterfall, the more electricity may be generated from the water's potential energy. PLTM Taluda'a is a PLTM in Gotontalo Province that can produce up to a combined 2 x 1200 Kw. It has been running its refinery for the last 13 years. The purpose of this research was to analyze the relationship between the generator's output and two critical factors (penstock and guidevane). The research method was descriptively and quantitatively based on field operation data. The analysis results show that changing the management of the water fluid pressure in the penstock by 1% can reduce the generator powerby 8%. While the influence of generator power as an effect of changing the Guidavane openingis 81.5%, a decrease in generator power is obtained by 5.64%