Whydiantoro
Program Studi Teknik Industri, Fakultas Teknik, Universitas Majalengka

Published : 2 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 2 Documents
Search

ANALISIS PENGUKURAN WAKTU KERJA UNTUK MENGURANGI WAKTU SIKLUS MATERIAL HANDLING DI PT SOLO PLASTIK INDONESIA Yuda Perdiana; Whydiantoro
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT Solo Plastik Indonesia is experiencing difficulties in achieving its production targets in the injection moulding department. This study aims to calculate the standard time and analyse the differences between machine capacity and operator capability. The method used is observation with a stopwatch, taking 45 data points from 9 existing work activities. The results of the study show a total standard time of 230.25 seconds, where manual time reached 194.42 seconds (84.4%) and machine time was only 35.83 seconds (15.6%). The gap analysis showed a reduction in production of 31 to 127 units per hour because the operator's ability was only around 13-16 units per hour, which was far below the machine's capacity. In identifying waste, it was found that there was wasted waiting time and inefficient movements in the material handling process. Recommendations for improvement were made in the form of providing standard cutting tools and ergonomically designed footrests to reduce manual time and increase production efficiency.
ANALISIS PENJADWALAN PRODUKSI ROTAN CV RAFFA ROTAN MENGGUNAKAN METODE FCFS DAN SPT Sandi Permana; Lia Milana; Whydiantoro
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

CV Raffa Rotan is a rattan furniture company operating a make-to-order production system in Majalengka Regency that has not implemented structured production scheduling, making it prone to delays and inefficient use of production time. This study analyzes and compares the production scheduling results of the First Come First Served (FCFS) and Shortest Processing Time (SPT) methods to determine which yields the minimum makespan. A descriptive quantitative approach was used, drawing on primary data from observation and interviews and secondary data from company documents across four periods, from the fourth quarter of 2025 through the third quarter of 2026, analyzed comparatively based on makespan and mean flow time in a two-workstation production system. Results show that SPT consistently reduced mean flow time, with an average reduction of 22.65% compared to FCFS across all periods. However, the makespan produced by SPT was consistently higher than FCFS across all four periods, with an average difference of 2.22%, since SPT does not account for workload distribution between stations separately. Thus, FCFS proved more effective in minimizing makespan in the two-workstation production system at CV Raffa Rotan and is recommended as the more suitable scheduling method for the company.