PROSES PEMBUATAN PLATE R MAIN TYPE K 18 DENGAN MENGGUNAKAN MESIN STAMPING PRESS Abdul Jafar; Alwi Albaar; Azis Budi Setyawan
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Stamping is one of the most widely used metal forming processes in the automotive industry due to its ability to produce components with high precision and productivity. This study discusses the manufacturing process of the Plate R Main Type K18 using a stamping press at PT. Persada Selaras Indonesia. The objective of this study is to analyze the production stages, machine operating procedures, and quality control implementation in the manufacturing process. The research method consists of direct observation of the production process, literature review, and data collection during manufacturing activities. The material used is SPHC–PO steel sheet with a thickness of 3.2 mm, complying with the JIS G3131 standard. The production process includes material preparation, die setup, blanking using a 200-ton Shinohara stamping press, bending using a 60-ton Komatsu press machine, and quality inspection through measuring instruments and inspection jigs. The results indicate that adherence to standardized operating procedures ensures the production of Plate R Main Type K18 components that meet the required dimensional specifications and quality standards. Furthermore, the standardized manufacturing process contributes to improved production efficiency, consistent product quality, and reduced defects throughout the manufacturing process.
ANALISA KEBOCORAN DAN PERBAIKAN POMPA SENTRIFUGAL 11-P-102 A CRUDE DESTILLATION UNIT DI PT. PERTAMINA INTERNATIONAL RU VI BALONGAN Fajar Maulana; Alwi Albaar
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Centrifugal pumps are vital equipment in the crude oil processing operations of the Crude Distillation Unit (CDU) at PT Pertamina International Refinery Unit VI Balongan. Pump 11-P-102 A functions to continuously transfer process fluids; therefore, its reliability has a significant impact on operational stability. During operation, leakage problems were identified, which have the potential to reduce pump performance, increase safety risks, and cause operational losses. This internship report aims to analyze the causes of leakage in centrifugal pump 11-P-102 A and to evaluate the repair methods implemented. The methods used include direct field observation, collection of operational data, literature review, and analysis of the mechanical seal condition, lubrication system, and pump operating parameters. Based on the analysis results, the leakage was caused by wear of the mechanical seal, influenced by operating conditions and service life. Corrective actions were carried out through mechanical seal replacement, alignment inspection, and performance testing of the pump after repair. The results of this internship indicate that after the repair was completed, pump 11-P-102 A was able to operate normally without leakage, thereby improving the reliability and operational safety of the unit. It is expected that the results of this analysis can serve as a reference for maintenance activities and the prevention of similar failures in centrifugal pumps within the CDU of PT Pertamina International RU VI Balongan.
PROSES PEMBUATAN SUB ASSY BRAKET GEAR SWITCH TYPE 3W MENGGUNAKAN MESIN STAMPING PRESS DI PT PERSADA SELARAS INDONESIA Alek Hidayat; Alwi Albaar
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sub Assy Bracket Gear Switch Type 3W is one of the parts for the three-wheeled Powerace vehicle and is manufactured at PT Persada Selaras Indonesia. The function of the Sub Assy Bracket Gear Switch Type 3W is a part of the vehicle that functions as a holder and hook for the gear shifting device so that it is firmly attached to the vehicle, so that the gear shift can take place smoothly This practical work report explains the process of making Sub Assy Bracket Gear Switch Type 3 W using a press machine pux 110 This Part uses SPHC-PO material (Sheet Plate Hot-Rolled Coil) With Thickness of 4.0mm, Width of 220 mm, and Length of 1219mm, which can be made 14 Parts of one plate. Sub Assy Bracket Gear Switch Type 3 W consists of several stages in the manufacturing process, namely the planning process, Blanking, Pierching, & Bending. The author hopes that this practical work report can add insight for readers about the process of making Sub Assy Bracket Geat Switch using the pux 110 machine.