METODE PELAKSANAAN PEKERJAAN STRESSING DAN GROUTING TENDON BALANCE CANTILEVER PROYEK LRT JAKARTA Febri Kusbianto Pamungkas; Abdul Kholiq
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 10 (2026)
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to describe the implementation method of stressing and grouting works on balance cantilever tendons, identify the factors affecting the success of the works, and evaluate the obstacles encountered together with the solutions applied at the LRT Jakarta Phase 1B Velodrome–Manggarai project, on piers P46B–P50B. The post-tensioning system strengthens segmental box girders built with the Balance Cantilever Method using a form traveler. Data were collected through field observation, interviews, and documentation during practical work, then analyzed descriptively. Results show that stressing is only performed after concrete reaches the required compressive strength of 28 MPa (0.8 f’c), using a calibrated hydraulic jack, with actual elongation compared to theoretical values within a ±7% tolerance. Lift-off tests confirmed that the remaining prestressing force was within the required range. Grouting was carried out with the bottom-up method after strand cutting and anchor patching, producing void-free ducts as verified by flow-cone testing. Identified success factors include concrete readiness, tendon and equipment quality, proper calibration, correct stressing sequence, and strict quality control. Concrete cracking after curing was the main obstacle encountered, requiring schedule adjustment and repair before stressing could proceed. Overall, the stressing and grouting works were executed safely and in accordance with the design specifications, supporting the structural integrity and long-term service life of the LRT Jakarta box girder.